1 MDC Track Finding at BESIII Zang Shilei BES Annual Meeting (Jun 1, 2005) ______________________________________ -Outline- 

Slides:



Advertisements
Similar presentations
Simulation Studies of a (DEPFET) Vertex Detector for SuperBelle Ariane Frey, Max-Planck-Institut für Physik München Contents: Software framework Simulation.
Advertisements

TRACK DICTIONARY (UPDATE) RESOLUTION, EFFICIENCY AND L – R AMBIGUITY SOLUTION Claudio Chiri MEG meeting, 21 Jan 2004.
Status of the MICE SciFi Simulation Edward McKigney Imperial College London.
Stack to Stack connection O.Sato. Motivation Emulsion coordinate aligned to TT coordinate by Komatsu :: CTransEmulToTT(*); Emulsion tracks.
MC Study on B°  J/  ° With J/      °     Jianchun Wang Syracuse University BTeV meeting 03/04/01.
LiC Detector Toy ECFA-ILC WorkshopValencia, November 2006 The LiC Detector Toy A mini simulation and track fit program tool for fast and flexible detector.
The LiC Detector Toy M. Valentan, M. Regler, R. Frühwirth Austrian Academy of Sciences Institute of High Energy Physics, Vienna InputSimulation ReconstructionOutput.
L3 Muon Trigger at D0 Status Report Thomas Hebbeker for Martin Wegner, RWTH Aachen, April 2002 The D0 muon system Functionality of the L3 muon trigger.
Status of Fast Tracking Algorithm MdcHough Guowei YU 8 th March 2006.
Some mediation on fast track reconstruction of BESIII Wang Dayong Mar 10,2004.
Pion test beam from KEK: momentum studies Data provided by Toho group: 2512 beam tracks D. Duchesneau April 27 th 2011 Track  x Track  y Base track positions.
1 Tracking Reconstruction Norman A. Graf SLAC July 19, 2006.
MdcPatRec Tracking Status Zhang Yao, Zhang Xueyao Shandong University.
26 Jan, MEG Software Status Framework for MEG MC, Unification of LargePrototype/beam test, Schedule and DC reconstruction MEG Software Group.
N. Saoulidou Fermilab 1 Status & Update of track reconstruction in the Near Detector N. Saoulidou, Fermilab
Simulation and Analysis of VTX03 and Upgrades to LASS Ryan Page.
1 Energy loss correction for a crystal calorimeter He Miao Institute of High Energy Physics Beijing, P.R.China.
MDC Simulation Yuan Ye BESIII Collaboration Meeting.
What is in my contribution area Nick Sinev, University of Oregon.
LCWS 06 Bangalore, India, March Track fitting using weight matrix Nick Sinev, University of Oregon.
Status of BESIII Event Reconstruction System Zepu Mao IHEP BESIII Col. Meeting 2006/01/12.
Status of BESIII Event Reconstruction System Zepu Mao IHEP BESIII Annual Meeting 2005/05/29.
Frank L. H. WolfsDepartment of Physics and Astronomy, University of Rochester Status of the TOF February 22, 2001 Straight-line tracking What have we learned?
Particle Identification at BESIII Kanglin He April 23, 2007, Amsterdam.
05/04/06Predrag Krstonosic - Cambridge True particle flow and performance of recent particle flow algorithms.
Impact parameter resolutions for ILC detector Tomoaki Fujikawa (Tohoku university) ACFA Workshop in Taipei Nov
JPS 2003 in Sendai Measurement of spectral function in the decay 1. Motivation ~ Muon Anomalous Magnetic Moment ~ 2. Event selection 3. mass.
Measurements of sin2  1 in processes at Belle CKM workshop at Nagoya 2006/12/13 Yu Nakahama (University of Tokyo) for the Belle Collaboration Analysis.
1 DT Local Reconstruction on CRAFT data Plots for approval CMS- Run meeting, 26/6/09 U.Gasparini, INFN & Univ.Padova on behalf of DT community [ n.b.:
BESIII EMC Simulation & Reconstruction He Miao
BESIII Track Extrapolation & Matching Wang Liangliang EPC IHEP.
CGEM-IT project and beam test program G. Felici for the FE-LNF-TO team Partially supported by the Italian Ministry of Foreign Affairs under the Program.
Current Status of MDC Track Reconstruction MdcPatRec Zhang Yao, Zhang Xueyao
TeV muons: from data handling to new physics phenomena Vladimir Palichik JINR, Dubna NEC’2009 Varna, September 07-14, 2009.
Study of 1D Hit Error Assignment Marco Terranova, Filippo Pisano, N. Amapane, G. Cerminara.
Giuseppe Ruggiero CERN Straw Chamber WG meeting 07/02/2011 Spectrometer Reconstruction: Pattern recognition and Efficiency 07/02/ G.Ruggiero - Spectrometer.
Measuring Oscillation Parameters Four different Hadron Production models  Four predicted Far  CC spectrum.
SiD Tracking in the LOI and Future Plans Richard Partridge SLAC ALCPG 2009.
ATLAS ATLAS muon CSC clustering David Adams Brookhaven National Laboratory June 15, 2006 Muon Software Updated 11:00 EDT June 15, 2006.
Paolo Massarotti Kaon meeting March 2007  ±  X    X  Time measurement use neutral vertex only in order to obtain a completely independent.
BESIII offline software group Status of BESIII Event Reconstruction System.
BES III Software: Beta Release Plan Weidong Li 19 th October 2005.
Object-Oriented Track Reconstruction in the PHENIX Detector at RHIC Outline The PHENIX Detector Tracking in PHENIX Overview Algorithms Object-Oriented.
Tracking software of the BESIII drift chamber Linghui WU For the BESIII MDC software group.
FPGA Helix Tracking Algorithm for PANDA Yutie Liang, Martin Galuska, Thomas Geßler, Wolfgang Kühn, Jens Sören Lange, David Münchow, Björn Spruck, Milan.
FPGA Helix Tracking Algorithm with STT Yutie Liang, Martin Galuska, Thomas Geßler, Wolfgang Kühn, Jens Sören Lange, David Münchow, Milan Wagner II. Physikalisches.
FPGA Helix Tracking Algorithm -- VHDL implementation Yutie Liang, Martin Galuska, Thomas Geßler, Wolfgang Kühn, Jens Sören Lange, David Münchow, Björn.
Torino, June 15 th, 2009 Status of the Pattern Recognition with the Hough transform and the STT system alone. Gianluigi Boca 1.
FPGA Helix Tracking Algorithm with STT
Susanna Costanza - Pavia Group PANDA C.M., Stockholm – June 14, 2010
Hough-4-14.
Status of BESIII and upgrade of BESIII
Relative alignment of LXE and DCH using AIF
STT pattern recognition improvements since last December meeting and
Tracking results from Au+Au test Beam
Update of pattern recognition
Study of T0 Extraction in the Online Tracking Algorithm
Track Finding.
Tracking Pattern Recognition
DT Local Reconstruction on CRAFT data
Study of the
Hough Based Tracking For Low Pt In MDC
Stereo hit in Hough Tracking
Silicon Tracking with GENFIT
Status report on MDC reconstruction software
Hough Transform on SZ Plane
DESY drift chambers efficiency and track reconstruction
Forward-Backward Asymmetry Study in
MUC simulation and reconstruction
Study of MDC tuning.
Presentation transcript:

1 MDC Track Finding at BESIII Zang Shilei BES Annual Meeting (Jun 1, 2005) ______________________________________ -Outline-  BESIII Drift Chamber  Goals of Track Finding  Algorithm of Track Finding  MdcGeomSvc & Geom. Classes in Track Finding  Preliminary Results from MC Events  Summary

2 BESIII Drift Chamber(MDC) Fig.1 Side view of BESIII Drift Chamber

3 Table 1 Signal layer and super layer arrangement of BESIII MDC

4 Goals of Track Finding Efficient track finding, especially at low momentum (till Pt~50-60MeV) Nice momentum and vertex resolution Provide proper track parameters and also proper error matrices Easy calibration/alignment Easy to understand, to maintenance, to update Fast BESIII’s goal:

5 Track Finding Algorithm Codes modified from Belle library. R-phi finding(2D) and z finding(3D) in algorithm viewpoint. Fig.2 : Flow of R-phi track finding.

6 Fig.3 Conformal transformation. A circle which passes through the origin is transformed into a line.

7 Fig.4 Conformal transformation. Circle M is a track in r-phi, and circle H is a drift circle. They are transformed into line N’P’ and circle G’.

8 Fig.5 Six neighbor sense wires of the star sense wire. Partially solve LR ambiguity of hit wires using neighbor wires’ information. For the remained LR ambiguity, solve them in circle fit or s-z line fit. Segments are found with histogram of hit wires’ azimuthal angle, and linked from the outmost to the innermost with directions of segments. The method of segment linking can be improved with the drift circle in the conformal plane.

9 Fig.6 : Flow of z finding (3D reconstruction).

10 Fig.7 s-z calculation in z finding.

11 MdcGeomSvc Fig.8 C++ class diagram of MdcGeomSvc.

12 Geom. Classes in Track Finding Fig.9 Class diagram of geom classes in track finding.

13 Preliminary Results from MC 1GeV single track MC events with cos(theta) from -0.8 to 0.8, smeared with 130 mocron wire resolution or w./o. smear, for muon+, muon-,e+,e-. Total 8 MC samples. All MC data are generated by Yuan Ye. Thank Yuan Ye for many helps!

14 Fig.10 muon(-) MC events, smeared with 130 mocron wire resolution. 3D effiency ~99.7% Vertex resolution: dr~184micron dz~1.8mm Spacial resolution ~140micron Moment resolution ~5.8MeV/c

15 Fig.11 MC sample is the same as in Fig.10. Distributions of tg(lambda), phi0, chi2 of helix fit, and number of hits used in helix fit.

16 Fig.12 e- MC events, smeared with wire resolution of 130 mocron. 3D effiency ~99.1% Vertex resolution: dr~176micron dz~2.0mm Spacial resolution ~140micron. Moment resolution ~6.1MeV/c

17 Fig.13 MC sample is the same as in Fig.12. Distributions of tg(lambda), phi0, chi2 of helix fit, and number of hits used in helix fit.

18 Fig.14 muon(+) MC events, smeared with 130 mocron wire resolution. 3D effiency ~99.9% Vertex resolution: dr~183micron dz~1.9mm Spacial resolution ~157micron Moment resolution ~5.7MeV/c

19 Fig.15 MC sample is the same as in Fig.14. Distributions of cos(theta), phi0, chi2 of helix fit, and number of hits used in helix fit.

20 Fig.16 e+ MC events, smeared with wire resolution of 130 mocron. 3D effiency ~99.7% Vertex resolution: dr~177micron dz~1.9mm Spacial resolution ~161micron. Moment resolution ~5.8MeV/c

21 Fig.17 MC sample is the same as in Fig.16. Distributions of cos(theta), phi0, chi2 of helix fit, and number of hits used in helix fit.

22 Fig.18 muon(+) MC events, w./o. smear of wire resolution. 3D effiency ~100% Vertex resolution: dr~156micron dz~0.68mm Spacial resolution ~95micron Moment resolution ~4.5MeV/c

23 Fig.19 muon(-) MC events, w./o. smear of wire resolution. 3D effiency ~99.5% Vertex resolution: dr~158micron dz~0.67mm Spacial resolution ~61micron Moment resolution ~4.7MeV/c

24 Fig.20 Event no. distributions of four smeared data sample. 3D effiency is above 99%

25 Fig.21 Event no. distributions of four data sample without smear of wire resolution.

26 Summary  1GeV single track MC events for mu+/mu- and e+/e- show following results:  3D efficiency is above 99%  Vertex resolution:  dr resolution: 175~185 micron  dz resolution: 1.8~2.0mm  Spacial resolution: 140~160 micron  Moment resolution: 5.7~6.1MeV/c  Problems of dr shift, large spacial resolution(chi2) exist.  Need further tests with various MC to improve. Thank you !

27