DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010.

Slides:



Advertisements
Similar presentations
NPRR 206 DAM Credit Requirements Reduction: E Values and Percentiles Luminant Proposal.
Advertisements

March 13, 2013 Day-Ahead Market (DAM) Clearing Process follow-up from February WMS Matt Mereness, ERCOT Manager DAM & CRR.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
1 Dead Bus Pricing Issue/CRR Performance Issue TAC 3 February, 2010.
September 2012 Proposed CRR Auction Credit Changes: Summary of Draft NPRR.
1 Market Trials Congestion Revenue Rights Weekly Update June 25, 2010.
Lead from the front Texas Nodal 1 EDS 4 Release 9.1 DAM/RUC/SASM Market Call January 11, 2008.
CRR Auction Scope John Moseley. To outline aspects of the CRR market process to assure that these proposed CRR market protocols (as interpreted by ERCOT.
1 NPRR 484/554 – Revisions to Congestion Revenue Rights Credit Calculations and Payments Market Call ERCOT Public July 31, 2013.
March 20, 2008 TPTF CIM Update Raj Chudgar Program Director for Market Redesign.
1Texas Nodal Market Trials Update. 2Texas Nodal Full System Market and Reliability Test 24-Hour Test Observations Duration of Test for Week of 8/ Hour.
1Texas Nodal Nodal Day-Ahead Market Update Special NATF Meeting July 19, 2010.
August 2012 QMWG DAM Clearing Behavior for Fixed Quantity Blocks Carrie Tucker Supervisor, Day-Ahead Market.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
1Texas Nodal Market Trials Update. 2Texas Nodal LFC Testing Review Review of materials presented at TAC Changes in Market Trials schedule and activities.
Nodal Program Update and SEWG Update COPS 1/11/2011 Jim Galvin.
Nodal Credit Monitoring and Management – Business Requirements ERCOT CREDIT Department October 11, 2006.
January 15, 2008 Monthly Board of Directors Meeting Texas Nodal Market Implementation Program Update Jerry Sullivan.
September 2012 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Lead from the front Texas Nodal 1 Texas Nodal Congestion Revenue Rights (CRR) EDS 3 Release 7 - Overview EDS 3 Phase 2 MP Planning.
April 2, 2008 CRR Team Update PCRRs CRR Team UpdateApril 2, 2008 Table of contents 1.What is a PCRR? 2.Which NOIEs are eligible for PCRRs? 3.What.
Slack Bus Change and Impact to Market Market Analysis, ERCOT QMWG Sep. 4, 2015.
CRR Issues Transparency provided by CRR Reports CRR EDS handbook Business process NPRR TPTF November 27, 2007.
Nodal Credit DAM Non-Business Day Treatment of Available Credit Limit (ACL)
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
Commercial Operations Subcommittee Update to TAC September 7, 2012 Harika Basaran, COPS Chair 2012 Jim Lee, COPS Vice Chair 2012.
TCR to CRR Transition Plan Proposed method for TCR Auction Revenue refunds Contingency plans For TAC Nov 1st, 2007.
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS) August 8, 2012 PDCWG August 9, 2012 ETWG/QMWG.
1 Next Steps to Reduce the RTM Settlement Timeline COPS Workshop August 29, 2013 Mandy Bauld ERCOT Director, Settlement & Retail Operations (512)
Outage Scheduler Transition Plan Kenneth Ragsdale NATF.
1 Tests for Reasonable LMPs & Price Validation Tool Overview October 27, 2009 NATF.
DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager NATF 31 August 2010.
Market Credit Working Group Update to WMS Wed. Oct 20, 2010.
1 Nodal Stabilization Market Call December 03, :30 PM.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Overview of Governing Document for Weather-Sensitive ERS Pilot Project Stakeholder Workshop Mark Patterson, ERCOT Staff March 1, 2013.
November 27, 2012 NPRR322, Real-Time PTP Option Modeling Implementation Overview.
August 11, 2008 Texas Nodal - Integrated Schedule Update Integrated Schedule Update for TPTF Janet Ply.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Lead from the front Texas Nodal 1 Texas Nodal EDS 4 Early Delivery System Plan TPTF May 22 nd, 2007.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
1 Exposure Stress Testing CWG/MCWG Suresh Pabbisetty, CQF, CSQA. ERCOT Public June 12, 2014.
Discussion on FGR Settlement Protocol Language David Maggio CMWG February 17, 2014.
1 Market Trials DAM/RUC/SASM Weekly Update March 19, 2010.
1 Nodal Stabilization Market Call December 16, 2010.
1 Credit Parameters Review TAC July 2, Protocol Section , “Credit Requirement for DAM Bids and Offers” specifies: Credit Requirement for.
Retail Workshop ERCOT Nodal Update October 06, 2010.
Day-Ahead Market Discussion/Clarification TPTF April 24, 2006.
January 3, 2008 TAC Meeting Texas Nodal Program Update Jerry Sullivan.
1 Project Update and Summary of Project Priority List (PPL) Activity to Date June 11, 2014.
July 15, 2011 Reliability Deployments Task Force Meeting ERCOT Studies and Proposal on Reliability Energy Pricing John Dumas Director Wholesale Market.
Jul 23, 2003Market Operations Standing Committee of the IMO1 Market Pricing Issues Update John MacKenzie.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
1 Market Trials Update NATF January 5, 2010.
1 Market Trials Real-Time Market / LFC Weekly Update August 27, 2010.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 7, 2009.
Re-Execution of the February ’16 Monthly CRR Auction David Maggio & Mark Ruane Technical Advisory Committee January 28 th, 2016.
CRR Deration and NPRR821 WMS 09/06/2017.
Market Trials Update NATF March 2,
Market Trials Congestion Revenue Rights
Nodal Program Update to Cops
NPRR833 Workshop: Contingency Processing in CRR, DAM and SCED
Initial ERCOT Parking Deck Prioritization Recommendation
ERCOT Pilot Project for Fast Responding Regulation Service (FRRS)
John Dumas Director, Wholesale Market Operations
Calculating CRR Auction Portfolio Exposure:
Load Distribution Factor Calculation for Market Applications and Studies a Presentation for NATF 9/21/ NATF 1 Texas Nodal.
Initial ERCOT Parking Deck Prioritization Recommendation
Presentation transcript:

DAM Performance Issues with CRR Offers Steve Reedy Market Design Manager TAC 2 September 2010

2 Agenda Description of issue How we got here Possible Immediate and Long-Term Solutions Going Forward Technical Advisory Committee2 September 2010

3 Description of issue This is NOT a design issue; it is a Performance Issue “Theory, experience elsewhere and ERCOT trials suggest the DAM can take hours to solve if PTP Option Bids involve > a hundred (or so) source-sink pairs” (Risk Analysis Report) DAM performance is degraded when the number of distinct source/sink pairs of CRR offers in combination with the number of contingencies becomes excessive e.g.> 150 source/sink pairs x 2500 contingencies = The performance bottleneck occurs in the Power flow and Contingency Analysis module (NSM) Cause of performance degradation is sheer volume of computations involved in running Contingency Analysis on CRR Offers Technical Advisory Committee2 September 2010

4 DAM Workflow Process Read Input Data Pre-Process Data NSM Power Flow, Contingency Analysis NCUC Commitment, Dispatch & Prices Publish Results Iterative process DAM process needs to complete in approximately 3 ½ hours: (10:00 AM – 1:30 PM) -3 ½ hour timeframe includes time for review of results by ERCOT before publishing -3 ½ hour timeframe includes possibility of rerunning DAM in case of AS insufficiency Based on100 distinct source/sink combinations, 2600 contingencies: Average 6 iterations between NSM & NCUC Average NSM execution time ≈ 8 minutes per iteration: Total= 48 minutes Average NCUC execution time ≈ 20 minutes per iteration: Total= 2 hours VERY TIGHT TIMELINE Technical Advisory Committee2 September 2010

5 Power Flow and Contingency Analysis Determines if there are any transmission violations due to the awarded quantities of three-part offers (3PO), DAM energy only offers/bids, PTP obligation bids and CRR offers –Uses base case with approximately 2500 contingencies 3PO, DAM energy only offers/bids, PTP obligations are such that superposition principles hold so they can be added together –Computation is the sum of 1 Base Case (larger flow computation) with 2500 Contingency Power (incremental flow computations) per hour per iteration: (1 + 2,500)*24 = 60,024 power flows per iteration However for CRR offers superposition principles do not hold and hence the –Computation is the product of number of distinct source/sink combinations in all the CRR Offers and number of contingencies +1 Base Case per hour per iteration: number of distinct source/sink combinations * ( )*24 power flows per iteration If the number of distinct source/sink combinations = 150 then the power flows per iteration is approximately 9 million If six iterations are needed to solve then, just for CRR Offers, the number of power flows becomes 54 million Technical Advisory Committee2 September 2010

6 How We Got Here System performance issues were identified last year and major changes were implemented to address this –Presented in 2009 at TPTF/NATF limitations for DAM Energy Only Offers/Bids, PTP Obligations Bids and CRR Offers. –Limit on CRR Offers = 2000 –Four releases focused to address these performance issues ERCOT found satisfactory DAM performance based on assumption of CRR Offers only sinking to NOIE load zones –With only 4 NOIE load zones, performance improvements and the 2000 limit on CRR offers sufficiently limited the number of distinct source/sink combinations across all the CRR Offers in DAM In Market Trials, there have been no reported issues with DAM performance due to CRR offers. During risk assessment, realized that CRR offers into the DAM are not restricted to the NOIE load zones (i.e., between any settlement points) Technical Advisory Committee2 September 2010

7 CRR PTP Offers: ERCOT’s Action Plan For Go-Live: Immediate Mitigation MMS – DAM Potential software based improvements : Make changes to the software which could allow the NSM processes to run faster by enabling parallelization –DAM - Network Analysis Module –Three to four weeks are required to determine the performance improvement of this option. –Additional time will be required to fully verify the functional results. Utilize newer math libraries in the software that may improve performance –DAM – Unit Commitment, Dispatch and Pricing –At least four weeks are required to determine the performance improvement of this option. –Additional time will be required to fully verify the functional results Potential hardware based improvements : Upgrade to faster processors. This is being tested at ERCOT this week to determine the magnitude of performance improvement –Six to eight weeks required to migrate the ERCOT production environments to this processor se t if this option is pursued Post Go-Live: Long Term Solution DAM - Network Analysis Module Potential long term software based improvement Further enhance parallel computation capability of Network Analysis Module (NSM) –Design change: Allow network analysis for each hour of the study period to be done in parallel Introduce new process controller that manages these parallel network analysis modules Manage the interface of passing transmission constraints after network analysis for all 24 hours back to the unit commitment engine –Long term option, not viable before go live Technical Advisory Committee2 September 2010

8 Completed Actions Three CRR Offer Stress Test Scenarios Run in Market Trials –8/ pairs, 8/31 – 114 pairs, 9/1 – 164 pairs –NSM run time as expected –NCUC run time significantly longer than expected Causes under investigation ERCOT performed new estimate on number of CRR paths –Looked at all Resources associated with NOIE QSEs –Combined with appropriate Load Zones –Added in all possible Hub-LZ combinations –Approximately 200 total paths First test of faster processor solution run –~33% reduction in processing time on test case –More testing to be done on Market Trials stress test cases Technical Advisory Committee2 September 2010

9 Going Forward NOIE allocation eligibility due to ERCOT on September 8, 2010 NOIEs to submit expected CRR offer paths on or before September 8, 2010 ERCOT to analyze expect offer path to current CRR capabilities –Done (~200) Follow up meeting with NOIEs during the week of September 13, 2010 to discuss allocation results and possible actions ERCOT to coordinate CRR Offer stress test scenario in Market Trials –Done 2 September 2010Technical Advisory Committee

10 Questions ? 2 September 2010Technical Advisory Committee

11 Appendix 2 September 2010Technical Advisory Committee

12 Superposition Principle 3PO, DAM energy only offers/bids, PTP obligations can cancel each other out –100 MW injected at point A and 100 MW withdrawn at point A put 0 MW on the system –75 MW A to B PTP Obligation and 75MW B to A PTP Obligation put 0 MW on the system –Can be modeled all at once PTP Options (CRR Offers) do not cancel each other out –75 MW A to B CRR Offer and 75 MW B to A CRR Offer put 75 MW on the system each direction. –Need to be modeled separately 2 September 2010Technical Advisory Committee