Workforce Management: Best practices for a WFM rollout Adam Rosen, Product Management Genesys Telecommunications, Inc. October 3, 2007.

Slides:



Advertisements
Similar presentations
Leveraging an Integrated ERP and CRM System - Featuring Sage MAS 500 ERP and Sage SalesLogix CRM.
Advertisements

Chapter 7 Schedule Control
1 McGraw-Hill/Irwin Copyright © 2004, The McGraw-Hill Companies, Inc. All rights reserved. Chapter 6 Enterprise e-Business Systems.
IMPLEMENTATION KICK-OFF.  Perry’s Introduction  Project Director  Stacy Garton  Executive Team  Sandy  Jason  Bill  David.
All Rights Reserved © Alcatel-Lucent |Genesys IWD 2010 Genesys intelligent Workload Distribution Obtaining The Visibility Your Back- Office Never.
SE 464: Industrial Information systems Systems Engineering Department Industrial Information System LAB 02: Introduction to SAP.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
CRM Chapter 7 Call Centers. Evolution of call center  Call centers  Contact Centers  CICs – Multiple channel contact center that takes into account.
Principles of Information Systems, Sixth Edition Transaction Processing & Enterprise Resource Planning Systems Chapter 9.
McGraw-Hill/Irwin Copyright © 2008, The McGraw-Hill Companies, Inc. All rights reserved.
9 C H A P T E R Transaction Processing and Enterprise Resource Planning Systems.
Enterprise Resource Planning (ERP) Systems
Call Center – What Really Makes Sense? Call Center – ce este cu adevarat important?
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Module 3: Business Information Systems Enterprise Systems.
© Copyright High Performance Concepts, Inc. 12 Criteria for Software Vendor Selection July 14, 2014 prepared by: Brian Savoie Vice President HIGH.
Release & Deployment ITIL Version 3
Call Center Terminologies
CALL CENTERS. Call Centers Original Definition A call centre or call center (note spelling differences) is a centralized office used for the purpose of.
UMT and Microsoft Presenting Tips and Tricks Basics What’s new in Microsoft Project 2010 Brian Feder, MBA, PMP Senior Vice President UMT Consulting Group.
2006 Palisade User ConferenceNovember 14 th, 2006 Inventory Optimization of Seasonal Products with.
 Contoso is working on Wireless 1xEvDo application to handle high speed 3G application data transfer (voice, video data) in mobile phones while working.
Source One Network Solutions with Corporate Headquarters based in Fitchburg, Wisconsin specializes in providing multi- location clients, with nationwide.
Supporting tools in an IT Project & Portfolio Management environment Ann Van Belle -
October 10-13, 2006 San Diego Convention Center, San Diego California Delivering Top-notch Team Performance for Customer Interaction.
Implementing a Change to TeammateTime Internal Message for RDOs and Store Managers.
Delivering Value Through Insights Genesys Product Management Deep Dive into Insights and Advisor Teddy Rusli, Sue Harkreader, and Craig Covington G-Force.
Sample Lending Corporation. How to decrease call processing time without compromising customer service.
An Enterprise Platform Copyright © Impact Technologies Group, Inc. | All Rights Reserved | | Ph:
I have a dream ….. Challenges of Managing High Performing Workforce Management in Today's Complex Environment Chantal Gagné Director – Bell Canada Workforce.
Introduction + Track Time is a enterprise grade web based software with robust features to simplify Time.
April, 2008 Better Together! Integrated GP & CRM AN INDEPENDENT MEMBER OF BAKER TILLY INTERNATIONAL 505 AFFILIATE OFFICES WORLDWIDE.
Keeping the Customer First Joe McFadden Vice President, Marketing.
Event Management & ITIL V3
Genesys – Business Overview
UKSMA 2005 Lessons Learnt from introducing IT Measurement Peter Thomas –
McGraw-Hill/Irwin Copyright © 2013 by The McGraw-Hill Companies, Inc. All rights reserved. Chapter 4 Business Across the Enterprise.
7-1 McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved.
Enterprise Business Systems Chapter 8 McGraw-Hill/IrwinCopyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
AUTO-OPTIMIZED WORKFORCE ADMINISTRATION. “Workforce Planners, Contact Center Architects, and CIOs should investigate the opportunity to embrace a more.
ERP Implementation Fundamentals Richard Byrom Oracle Consultant, Speaker and Author
Project Portfolio Management Business Priorities Presentation.
Company Confidential Leverage Your E-Business Suite as Part of Your Sales Performance Management Strategy January 17, 2008.
HP PPM Center release 8 Helping IT answer the tough questions
© 2014 IBM Corporation Does your Cloud have a Silver Lining ? The adoption of Cloud in Grid Operations of Electric Distribution Utilities Kieran McLoughlin.
Integration integration of all the information flowing through a company – financial and accounting, human resource information, supply chain information,
Workforce management
PROPRIETARY  2003 Data Research Analysis & Consultancy Solutions All Rights Reserved. This is achieved by: Improving availability / reducing stock outs.
WFM: A Power Tool for Retaining Top Talent Presented by: Dick Bensinger Senior Education Specialist, Application Delivery NICE Systems To contact Dick.
SunTrust One of the nation’s largest and strongest financial services holding companies  2,000 agents  Sites in Atlanta, GA; Richmond, VA; Orlando, FL;
EPIC Connections® is a leading provider of contact center consulting, outsourcing and managed infrastructure services. Our highly qualified teams deliver.
NATIONAL IT AUTHORITY MODULE 5 PROCESS HANDLING SKILLS AND KNOWLEDGE.
MEASURING BPM SOFTWARE ROI AND ITS BENEFITS IN RISK MANAGEMENT PROCESS AUTOMATION Contact us at | Web : | Tel: 1.
Selecting the Right CRM System at AVEBE Refik Kocak CRM Partners (on behalf of AVEBE) CUSTOMER.
ABOUT COMPANY Janbask is one among the fastest growing IT Services and consulting company. We provide various solutions for strategy, consulting and implement.
8 - 1 Copyright © 2006, The McGraw-Hill Companies, Inc. All rights reserved.
An Introduction to Attendance on Demand
Balanced Operational Excellence
Management Information Systems
Reemployment Assistance Contact Center Journey
EOB Methodology Overview
Rebecca B. Brigham, MSW Assistant Dean for Field Education
ENTERPRISE BUSINESS SYSTEMS
Enterprise Program Management Office
About this Template Dear Colleague, This template is provided by Valooto to help you communicate the facts about your need for a CPQ (Configure Price Quote)
Data in Businesses Slide 7.
Enterprise Resource Planning (ERP) Systems
Contract Management Software from ContraxAware Simplify Your Contract Management Process.
WORKSHOP Establish a Communication and Training Plan
Presentation transcript:

Workforce Management: Best practices for a WFM rollout Adam Rosen, Product Management Genesys Telecommunications, Inc. October 3, 2007

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Agenda  Who is Genesys?  What is Genesys WFM?  Rolling Out a New WFM Product  Migration Considerations  Principles of WFM to Consider  Evaluating Success  Training

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Who is Genesys?  48 locations worldwide  1,900 employees  ~4000 customers worldwide  More than 300 partners worldwide  Market leader #1 in CTI software (WW) #1 in VXML IVR (WW) #2 in management (US) #1 in online live collaboration (US)  125 million interactions managed per day  1.25 million agents enabled worldwide  100% Call Center Software Focused

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. What is Genesys WFM?

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. The Unique Value of Genesys WFM  Centralized configuration – integration to Genesys platform  Automated statistical feeds Regardless of underlying infrastructure For accurate forecasting and adherence  Comprehensive solution  Almost entirely browser-based (except for some configuration/administration functionality)  Open APIs to interface to third-party solutions  Software, Business Consulting and Professional Services = A holistic approach

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Rolling Out a New WFM Product  Start with a representative line of business Identify a “typical” line of business in terms of -Working rules (e.g. agent availability patterns, shifts, exceptions) -Call routing complexity -Business workflow Is that line of business migrating from another WFM tool? Excel? Ensure that users have been trained on the WFM product  Incremental rollout Start small, then expand with lessons learned Have strong Project Manager You can begin with locally-managed processes (e.g. forecasting) and then virtualize them over time Are you prepared to have two WFM tools in use simultaneously? Slide 1 of 2

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Rolling Out a New WFM Product  Consider using your WFM rollout to… Re-visit and simplify complex legacy rules Define new business practices necessary to achieve long-term vision Slide 2 of 2  Getting early user buy-in is very important End users can get very attached to a specific tool or process Forecasting and Scheduling professionals rely on WFM and therefore expect to be immediately productive They must understand differences between new & existing tools -Semantics/terminology, workflow Expose software to users early -Allows users to gain familiarity & comfort -Helps overcome many objections and resistance to change

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Migration Considerations  WFM tools will differ from one another in several ways Scheduling paradigm -“Set of shifts” approach vs. “Individual agent scheduling” approach What is a Shift? -“Fixed” vs. “Flexible” definition  Data migration Evaluate usefulness of historical data Data importing – what can and cannot be imported  Custom integrations and reports Can any of these integrations be updated by using an WFM SDK provided by the vendor?

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Principles of WFM to Consider  Entering “known obligations” for agents (meetings, trainings, time off, etc.) You will need to establish a process for determining who enters these into the system, and when In some cases, agents will be allowed to manage their own time off or exception requests, and you will need a process for reviewing those  Do you want optimal schedules to be built around these overheads, or do you want to apply these overheads after the schedule is built? Best practice is to put as much as possible into the system in advance, for the best-fit schedules Having these “pre-planned obligations” in the system also increases accuracy of multi-site forecasting Agent Planning

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Principles of WFM to Consider  How much usable historical data do you have? Can you easily get it into the WFM tool?  What service objectives does the WFM product support when determining staffing levels? Which ones are appropriate for your business? E.g. Goals may include Service Level, Average Speed of Answer, Maximum Occupancy, or Maximum Abandonment Percentage  What “shrinkage” do you need to plan for – i.e. to account for unplanned time lost by agents starting up computers, unscheduled breaks, etc. “Industry standard” shrinkage is around 15-20% for unproductive time Forecasting

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Principles of WFM to Consider  Forecasts & Schedules created centrally Schedules represent collection of blank shifts with no agent names and no consideration for planned overheads. Schedulers build schedules with profile agents, and then assign real agents to blank schedules.  Forecasts & Schedules created centrally Schedules created and assigned to specific agents prior to delivery to the local site. This is a less common model but is used by some customers.  Forecasts created centrally, but schedules created locally Agent schedules reflect the appropriate time zone, availabilities, and overheads for the site. This the best practice for multi-site contact centers where a central forecasting team will have best visibility into “demand” Scheduling

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Principles of WFM to Consider  Effective intra-day management is one of the best ways to reduce staffing costs and improve customer service  It is essential to monitor intra-day performance to anticipate deviations from the plan as early as possible  Monitor real-time adherence to ensure agent availability Train agents to put themselves in proper state when not on the phone Train supervisors to update schedule with approved deviations Consider rewarding agents based on adherence  Create contingency plans for how to put additional agents to work when crises arise Map out process in advance and teach it to supervisors Intra-day Management

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Principles of WFM to Consider  During roll-out, consider what reports will be used (and how they will be used) to measure: Forecasting accuracy Contact Center performance (Actual vs. Planned) Scheduling efficiency Tracking of shrinkage to improve future planning Agent adherence to schedule  Consider analyzing WFM data alongside other contact center data to uncover opportunities for improvement Agent sales per call from sales database Agent handle time from CTI/Routing reporting database Reporting

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Evaluating Success  Define success criteria up front Set up milestones with success criteria at each step -e.g. Start with simple configuration, follow a workflow, and then get more complex Determine who will decide if criteria have been met  Metrics: Before and after Forecasting accuracy -One way is to create forecast for past period (requires good set of historical data) -Another way is to compare WFM forecasting results with alternative method -Can uncover common problems such as statistics from ACD or Routing Platform not being configured in a consistent way with statistics provided by other sources Scheduling efficiency -Compare multi-skilled schedules against schedules created with other tools for number of over/understaffed hours, and schedule budget

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Training  Training supervisors, team leaders, and managers Much of the WFM interface may be intuitive but business rules may not be, especially if supervisors have been using different tool May need to train some users on multiple tools, such as where to create new agents and skills Consider how to allocate user permissions (Edit, Read Only, etc.)  Train agents on interface and explain benefits Viewing schedules Schedule trading Schedule bidding Requests for partial-day and full-day time off Preference requests

Extra Slide(s)

All rights reserved © 2006, Genesys Telecommunications Laboratories, Inc. Planning for WFM Implementation  Multi-site considerations Will you create optimal shifts for the entire enterprise and distribute to each location? Or, create optimal forecast and split it to each site, to allow Site-specific schedules to be built? -Best results are seen when building and managing schedules in a way that can be done most accurately, which is with the local team How should Sites be organized in WFM? -Sites are normally the base unit for building schedules but do not need to map directly to phone switches Is multi-site routing in use? If so, how is it done?  Collecting appropriate statistics These are the basis for all forecasting and thus, all scheduling Consider how AHT is defined on the ACD or Routing Platform Consider whether Call Volume statistic takes any abandonment into account