 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps.

Slides:



Advertisements
Similar presentations
Bagby L0 Workshop L0 Infrastructure  Mapping  Installations u Horseshoe Area s Adapter Card u Cathedral s Low Voltage Fuse Panel u Platform s.
Advertisements

1 WP 10- High Voltage ’06 March 23 rd HV Trip studies  See previous meetings for the foreseen tests on LBC44  Started late by Clermont people when Clermont.
Luminosity Monitor MWPCs, commissioning. A.Kiselev OLYMPUS Collaboration Meeting DESY, Hamburg,
BTeV RICH HV System. The RICH HV System Power One 24V – 1.2A TNG Matsusada HVPS HPD.
New Human Computer Interfaces Amnon Dekel HUJI – CSE, Spring 2007 Class 3 March
ACORDE FOR TPC TEST Status report. Top Modules Bottom Modules.
Summary of Fuse Testing for Barrel Module Fuse Boxes Duke University Jack Fowler.
13 January All Experimenters’ MeetingAlan L. Stone - Louisiana Tech University1 Data Taking Statistics Week of 2003 January 6-12 We had to sacrifice.
1 Computer Power Supply Amateur Radio Conversion For Cheap +12 vdc Power March 17, 2003.
ISR Work Progress Report Muon Week April 10 th 2003 A. Benvenuti INFN Bologna.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
FEE LVPS 1. INTRODUCTION This section describes the Low Voltage Power Supplies (LVPS) for the TPC FEEs and RDOs. Plans currently call for all of the old.
Straw Electronics status and preparation for the technical run NA62 workshop Siena.
1 Basic Electrical Series and Parallel Circuits. 2 Introduction So far we have looked at circuits that have one path for electricity to go as well as.
Lesson 6 Voltage Do we need to MEASURE it? OR Do we need to DETECT it?
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
The LST High Voltage System LST Readiness Review May 5, 2004 Klaus Honscheid Ohio State University.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
M. Gilchriese Sector Status Module Loading Task Force Meeting November 18, 2004.
FIRST Electrical Design FIRST Robotics Championship Conference Steven Shade Team 1111 April 16, 2003.
Update on the CDC GlueX Collaboration Meeting October 2006.
E8 / PPA Solar PV Design Implementation O&M Marshall Islands March 31-April 11, Preventive Maintenance.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
ECE 2799 Electronic Troubleshooting Strategies Prof. Bitar Last Update: 04/15/10.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
UF –PNPI HV system status August 2008 Sergey Volkov Nikolai Bondar PNPI.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
Status of NA62 straw electronics Webs Covers Services Readout.
Forward Muon Installation and Commissioning Dmitri Denisov Fermilab Director’s review 7/12/1999 Plan Forward muon detectors Mini-drift tubes installation.
L0 Technical Readiness Review-Electronics Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage s Filter.
9 March 2005OT Meeting - LHCb week - Production and QA, Niels Tuning 1/19 Outer Tracker Module Production at NIKHEF Produced 60 modules  Production Progress.
Status and schedule for the H - source upgrade at HINS beam line HINS Meson meeting January 5 th, 2012 L. Prost (most inputs from Steve Hays & Alex Chen)
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
Inverter power supply symptoms can be typically broken down into the following categories: 1. All Outputs Normal: 2. All Outputs Dead (no output): 3.
Information for the assembly of the test board w/ PMT and preamps
Director’s Review of RunIIb Dzero Upgrade Installation Linda Bagby L0 Electronics Installation  System Electronics Overview u Low Voltage u High.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
Electronics: Junction Cards, Adapter Card, Purple Card, …. Ron Sidwell, K. Harder, T. Sobering, R. Taylor, E. VonToerne, Kansas State U.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
Single Module Tests (electrical) Inspect connectors and cables for visible damage C-measurement: make sure all pads are correctly connected HV test (1.5.
1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule.
Basic Equipment and Schematic Reading. Objectives Learn the basic equipment that will be used in the Lab. Learn some of the basic symbols used on electrical.
 Fritz, Neeti, Usha  Fritz had to cancel. He will make a presentation on Monday.  3 Communications paths u Direct connection u 50-wide T’n’F cable u.
Task List  Group management plan  Background studies  Link budget: optical/electrical  Build, test learning Rx board  Order components for transceiver.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
E.Guschin (INR,Moscow) 26 February 2008PS/SPD commissioning meeting CERN PS/SPD LED monitoring system status Tuning of SPD ‘C’ side: We concentrated our.
Electrical Testers Basic test equipment used in today’s shops may include an analog type meter, a VAT (Volt-Amp-Tester), DMM (Digital Multimeter),
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Feb 24, 2014.
What is Voltage? Remember, current is the flow (per second) of quantities of electrons past a point in a circuit. if 0.1 C of electrons pass this place.
Electronics and DAQ status Frontend - covers – Preparation of the final cover version and production Design finished Mounting of RJ45 verified using selective.
How to use S-parameter data files in Libra Ray Woodward.
LKr status R. Fantechi.
Summary of Fuse Testing for Barrel Module Fuse Boxes
T1 Electronic status Conclusions Electronics Cards:
FIRELEC Migration Solution
DT Infrastructure: LV, HV, Gas
Summary of Fuse Testing for Barrel Module Fuse Boxes
Control System Summary of Changes Since PDR
Series 5300 Lithium Cell Formation System
Limited Streamer Tube Project Summary
PLC Front Panel.
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

 94 LVPS Packages mounted 4’-25’ from the front-end electronics.  4 modules per package. u +5V& -5V “Digital”, +5V & -5V “Analog” 18 A 1A 18A 18Amps PDT Low Voltage P.S.

LVPS Connections

LVPS Testing  Procedure (on d0mino) /RunII/home/room2/diehl/muonup/19 99/lvps_test.txt u Disconnect front-end electronics from Renwa card u Check wires connections at both ends u Measure load internal resistance u Power up with a simulated load & adjust voltages to read proper voltage output u Reconnect electronics with FEB cards  Typical malfunctions (Alonso G.)  Loose wires  60%  Wrong connections in wiring-esp. sense leads  40%  Bad power supplies  9 of 88 Power supplies  Bad soldering on the lead wires of the power supplies  5 of 88 Power supplies

LVPS Status  Total: 94 Supplies  Installed: 90 (not yet: 105, 106, 145,146)  Completely Connected: ~78 (many in the A-layer don’t have a power trunk yet).  Operating: ~66 (Bottom B & C-layer not operating, incomplete electronics)  Power Supply Operation: u A couple modules have been replaced. In retrospect, the problems have likely been related to the modules A.C. connections, rather than to component failure.  Plan to Finish: u Install 4 remaining LVPS after EF’s are closed. u Victor M. has material to make long power trunks. Install in 2-wk shutdown.

PDT High Voltage  94 PDT’s each have two H.V. inputs.  Operating Voltage u On mini-pdt (small length) s Wire: 4.65 kv Pad: 2.3 kv u On the real thing (not finalized?) s Wire: 4.7 kv Pad: 2.3 kv  Status of MCH2: u 2 Crates, 47 pods u All pods installed u All pods have been operated u Pods not tested for extended periods

PDT Business End  Service Cards u 3 Types u Recently purchased spares for A-layer u Now have sufficient spares of all kinds.

HV On Detector  POD to PDT Map u Sensible division of PDT’s to Pods s Averages 2 PDT’s per pod s Large A-layer PDT’s each have own pods s Bottom A-layer PDT’s ganged 3/pod s Quiet Bottom C-layer PDT’s ganged 4/pod u See file muon_upgrade/Image3.gif u Tested recently to make sure pod # matched the appropriate Reynolds output.  6 PDT’s (B&C-layer top east, octant 1) have been operated on a couple of gasses since last summer.

HV Pod Map

HV On Detector  70 (-3) PDT’s are connected to HV pods. u 3 PDT’s (243, 135, 141) are disconnected because of broken wires.  67 PDT’s OK at 200V on wire and pad  36 PDT’s have been brought up to full voltage.  Plan: u Upon gas flow: bring the PDT’s to full voltage. Measure/track beam-off currents. u Finish cable installation in the 2 week shutdown u Repair/jumper cells with broken wires on access

 LVPS u 90/94ths installed u 66/94ths operating u No evidence of LVPS pod failure u Finish during the 2 wk shutdown.  High Voltage System u Infrastructure MCH2 complete u 67/94ths ready to be brought up to full voltage once gas is flowing. u Finish during the 2 wk shutdown. Summary