GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 1 of 11 GLAST Large Area Telescope: I&T Integration Kickoff Meeting MGSE March 9th, 2004 Eric M. Gawehn SU-SLAC MGSE Department Manager 650 – 926 – 3622 Office 650 – 796 – 2576 Cell Gamma-ray Large Area Space Telescope
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 2 of 11 AGENDA MGSE Required for Assembly / Disassembly of the LAT ( SLAC Ops ) –Hardware List Long Lead Items –Status –Readiness Verification Procedures –List –Training Schedule
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 3 of 11 LAT MGSE Hdwr List, Cont. Long Lead Items LAT 4 x 4 Rotation / Support Stand (including drive system and flex coupling) Personnel Access Platform { Interfaces to Rotation Stand Weldment } GPR and GPR to Grid attach bracketry Support Shaft-Flange Assemblies, GPR to Rotation / Support Stand LAT Z Axis Vertical Lift Fixture LAT Z Axis Horizontal Lift Fixture Proof test weights for LAT Lift Fixture, GPR, GPR to Grid brackets, Support Shaft Flange Assemblies and Rotation Stand 1x4 Lift Fixture Short Lead Items CAL –Z Up Lift Fixture, Complete and Ready for Use CAL +Z Up Lift Fixture TKR Lift Fixture – Provided by TKR TKR Alignment System Crane Scale; Being Modified; Will Require Re-Calibration CAL Alignment Tool EM-2 Single Bay Mod ( Updated TKR Interface Plate ) - Items Needed at Integration Start- Provided by Other Group, or Needed Later
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 4 of 11 LAT MGSE Hdwr List, Cont. Short Lead Items, Continued CAL Alignment Rods TKR to TKR No Touch During Ascent Verification Tool CAL Inversion Stand Metrology Bay for Shimming E-Box Height with respect to CAL Grid Interface TWR ( TKR, CAL, TEM, TEM PS ) Mass Simulators Lift Fixture relocation dollies; Use Lead Stack dollies from EM Series LAT Z Axis Horizontal Support Braces / Counterweight Moment Arms Menning Plate Installation Equipment Interim Integration E-Box support brackets TBD ACD Low Profile Integration Stand Brackets to hold Lift Fixture Spreaders on top of Bonded Stores Containers Ambient Test Thermal Control System 1 x 4 EM-Calibration Unit Rotation Stand - Items Needed at Integration Start- Provided by Other Group, or Needed Later
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 5 of 11 LAT MGSE Images
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 6 of 11 LAT MGSE Images
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 7 of 11 LAT MGSE Images ACD Low Profile Integration Stand ACD on 8’ by 8’ Dolly Integration Stand is Placed to Allow Range of Motion for PAPs
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 8 of 11 MGSE Status Tracking Matrix
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 9 of 11 MGSE Status Tracking Matrix
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 10 of 11 LAT MGSE Procedures Assemble MGSE Per Design Drawings –Procedures will point to drawings –Procedures will capture trace ability for installation of Certified Fasteners Special Procedures and Travelers for Qualification Steps Training Procedures to ensure team is ready –4x4 Integration Stand For Range of Motion Checks Prior to PAP Relocation Events –Lift Fixtures –Stand Relocations in Rm 104 –Shipment Preps
GLAST LAT Project I&T Integration Kickoff Meeting 03/09/04 LAT I&T MGSE Page 11 of 11 LAT MGSE Subsystem Schedule