04 October 2007 Revision 1 RCM2 Case Study Project Plan Cooling Fan System (topic link)

Slides:



Advertisements
Similar presentations
EuropeAid PARTICIPATORY SESSION 1: 3 topics Each table chooses its topic: o Managing reality (Blue) o Assessing performance (Yellow) o Monitoring & reporting.
Advertisements

Account Planning The purpose of these slides is to describe the Account Planning Process, the methodology, and the workload involved in running an account.
Guide to Conducting Meetings and RAP sessions
Structured development process Wednesday 20 September 2006 Brett Coster Business Analyst uniqueworld
COMP4710 Senior Design Process Documentation and Deliverables.
Effective Meetings Training for Employees Presenter’s Name 2008.
How to Document A Business Management System
EE 496 Poster Session Instructions Rev. 2/9/15 WS.
OH 10-1 Agenda Review Your Learning – Chapter 9, page 221 Article Reviews – Problem Solving Chapter 10 – Planning & Conducting Effective Meetings Test.
Virtual Portfolio Project Finance 450 Quarterly (Final) Report Comments.
R U There? Looking for those Teaching Moments in Chat Transcripts Frances Devlin, John Stratton and Lea Currie University of Kansas ALA Annual Conference.
Applied Software Project Management Andrew Stellman & Jennifer Greene Applied Software Project Management Applied Software.
Prepared by Long Island Quality Associates, Inc. ISO 9001:2000 Documentation Requirements Based on ISO/TC 176/SC 2 March 2001.
Postgraduate Essentials University of Edinburgh Postgraduate Essentials Online induction to the course.
Meeting Skills.
Call 5: Checklist Modification 101 Continued, Small Scale Testing, and the Checklist as a Documentation Tool.
DCT 1123 PROBLEM SOLVING & ALGORITHMS INTRODUCTION TO PROGRAMMING.
Incident Reporting Procedure
Collaborating in the Workplace C H A P T E R 3. In What Settings Do Employees Write Collaboratively? How Do You Manage a Project? How Do You Conduct Effective.
G O D D A R D S P A C E F L I G H T C E N T E R NASA Case Study Initiative Using Case Studies to Drive Organizational Learning Dr. Ed Rogers, CKO GSFC.
Agenda Chapter 8 – Leaders Manage Meetings
Developing writing/speaking skills on Yahoo discussion groups.
HW425 Health & Wellness Programming: Design and Administration Unit 1 Seminar: Needs Assessment The Big Picture Instructor Beth Edwards, Ph.D.
1. Objectives  Describe the responsibilities and procedures for reporting and investigating ◦ incidents / near-miss incidents ◦ spills, releases, ◦ injuries,
High expectations… “To improve teaching and learning throughout the school”
Topic 13 – Lesson Plan Review Facilitation Guideline Zone and Date
Essential SNA Project being developed from 2011 to 2013.
10/10/2015 IENG 471 Facilities Planning 1 IENG Lecture END Project Report Requirements & Project Presentation Information.
KICK – OFF MEETING, CRACOW COMMUNICATION PROCEDURES.
EvergreenEcon.com ESA 2011 Impact Evaluation Research Plan Public Workshop #1 February 20, 2013 Presented By: Steve Grover, President.
05 December 2007 Revision 5 RCM2 Case Study Project Plan Cooling Fan System (topic link)
Total Productive Maintenance (TPM)
UNIT II RCM PROCESS Module 2 PLANNING AND PREPARATION " Copyright 2002, Information Spectrum, Inc. All Rights Reserved."
OVERVIEW PRESENTATION
INFORMATION X INFO415: Systems Analysis Systems Analysis Project Deliverable 1 Project Statement of Work Outline.
Table Facilitator Orientation ATE Birds of a Feather Sessions October 2010 FOR AUDIO, PLEASE CALL: Passcode: #
6/3/2016 IENG 471 Facilities Planning 1 IENG 465 – Final Design Project Report & Presentation Requirements.
26 November 2007 Revision 4 RCM2 Case Study Project Plan Cooling Fan System (topic link)
WELCOME BACK TO CAMP!. Agenda Warm-Up for statistical and probabilistic thinking Norms for our PD Teaching through problem solving Break Lesson Study:
Reporting Template LAPI Exploitation Event What do I do with this template? This template is to be used for reporting on the LAPI Exploitation Events.
Data Segmentation for Privacy November 16 th, 2011.
BSBPMG404A Apply Quality Management Techniques Apply Quality Management Techniques Project Quality Processes C ertificate IV in Project Management
Overview: 1.Past project review 2.How to communicate with clients 1.Clients taste in design 2.How to avoid misunderstandings w/client or project manager.
ISO Registration Common Areas of Nonconformances.
CM220 College Composition II Friday, January 29, Unit 1: Introduction to Effective Academic and Professional Writing Unit 1 Lori Martindale, Instructor.
09 November 2007 Revision 3 RCM2 Case Study Project Plan Cooling Fan System (topic link)
Implementing a Writer’s Workshop
Biomes: Islands & Evolution Collaborative Project Melissa Noble.
Meeting Management Part I. Importance of Meetings  Meetings are one of the most important management tools necessary to make teams, groups, and organizations.
2/27/2016 IENG 471 Facilities Planning 1 IENG 464 – Conceptual Design Project Report & Presentation Requirements.
David M. Kroenke and David J. Auer Database Processing Fundamentals, Design, and Implementation Appendix B: Getting Started in Systems Analysis and Design.
Welcome to EP299! LaToya Blackshear. Agenda Welcome! Introduce Yourself! Course Overview Final Project - Portfolio Week 1 Assignments Week 1 Project Week.
PDA IN APPLICATIONS OF ICT IN LIBRARIES Levels 7 & 8.
Technical Report Writing Dr. Shelley Thomas. Overview Selecting effective report topics Using worksheets to plan projects Developing and proposing project.
Virtual Team Project and IBM Connections WRIT 340 Prof. Walker WRIT 340 Prof. Walker.
The Project Management Process Groups
EE 496 Poster Session Instructions Rev. 4/3/16 WS.
1 Oxford Professional Education Group Ltd Mastering Metrics An Introduction.
Welcome to Introduction to Psychology! Let’s share a bit about where we are all from…
Welcome to MT140 Introduction to Management Unit 1 Seminar – Introduction to Management.
MA English Language Teaching: Online
IMS Implementation Project
Incident Reporting And Investigation Program
Project Management PTM721S
Radiopharmaceutical Production
Incident Reporting And Investigation Program
Spelling and beyond Literacy Toolkit HGIOS
Cooperative Learning Students work together in small groups and learn through interaction with each other while the teacher coaches the process.
Effective Project Management: Traditional, Agile, Extreme
Pediatric Pain Resource Nurse (PRN)
Presentation transcript:

04 October 2007 Revision 1 RCM2 Case Study Project Plan Cooling Fan System (topic link) link)

Content Introduction Why this study Output Team Planning System boundaries Functional Block diagram & Major Equipment Key information Let’s get started

Introduction From within the Maintenance Forum the initiative was born to conduct a “Virtual RCM” study to learn and share knowledge in an interactive way. A Case & Operating Context is defined for the Company Ollie’s Olefins based on business impact/criticality. There are a lot of methods which are called RCM In this study the RCM2 methodology of John Moubray will be applied

Goal and output Make a maintenance plan which preserve the functions of the chosen Cooling Fan System throughout the technologically useful live by selecting and applying the most cost effective technique for managing failures and their consequences Output: -Maintenance schema -Operator Care Instruction -Modifications (can also be operational procedure)

Team Facilitator: Rogier Team members: (list to be defined) It is nice to have a fixed team giving input during all steps to prevent having discussions all over again.

Planning The project kick-off is in week 41 after publishing project plan on forum Minimum 1 session a week depending on input A live chat or telecom can be organised to discuss different views if necessary Estimated time needed is 11 sessions, completion date end 2007 Participant are assumed to have basic RCM knowledge starting the study Session Content Kick off – Setup project and team1 session (WK 42) Functions and performance standards1 sessions Functional Failures & Failure Modes2 sessions Failure Effects2 sessions Failure Consequences 2 sessions The RCM Task Selection Process3 sessions Spare2 sessions Finalizing report by facilitator 1 week

System Selection (Boundary)

Funct. Block diagram & Major Equipement

Key information Plant located on island near to sea Operation 24h/7 days a week /365 day’s a year It can sell all product it can make 30 equal systems in production unit System supplies ambient air to refrigeration system Performance indicator: If fan < 200 RPM audible alarm sounds in control room Revenue loss of $5000 per hour if one system down for > 30 min System cost a lot of maintenance hours due to breakdown disturbing the process (how much cost / failure history?)

Let’s get started -Who is willing to be part of the team? -let share addresses within the team, mail me your address please? -When the team is complete I will setup a platform to share / add remark or something to be able to give your input when it suits your agenda -We are in different time zone's I think, so live discussion can be a problem, Can we make an overview of possibilities when to discuss /chat live? -To share learning's everyone get’s read rights on chosen platform and only team member write rights All information needed for study will documented and posted -Final Result per session will be post on maintenanceforum to share learning -English is not everyone’s native language so can give misunderstanding, treat everyone with respect, lets focus on the big picture and not argue about minor language details.

Step 1 functions -Step 1 – Describing functions We have enough information to start with defining the function A function statement should consist of a verb, an object and a desired standard of performance If we miss relevant information it will be an action point for someone to retrieve of we make a decision as a group We can use the template supplied by Rolly12 Other steps will be added during the study