WG2A meeting 7-8 October 2004 Working Group 2A ECOSTAT Agenda item 9b Discussion on final Intercalibation register.

Slides:



Advertisements
Similar presentations
1 Reportnet for Noise: Feedback from member countries Colin Nugent Eionet National Reference Centres for Noise meeting Copenhagen October 2009.
Advertisements

Date/ event: 4-5 November 2009, marine and coastal Eionet Workshop, Copenhagen Conclusions.
PFRA reporting – Output from test phase FD Drafting Group, Meeting 16 February 2011 Mette Wolstrup.
Intercalibration Guidance: update Sandra Poikane Joint Research Centre Institute for Environment and Sustainability.
…..Kansas Department of Revenue – Property Valuation Division – Kansas GIS Policy Board - DASC ….. Statewide GIS Tax Units Database A collaborative partnership.
WISE Working Group D DG Env Brussels Jon Maidens, Atkins Danmark a/s.
WG 2A ECOSTAT Meeting 4-5 March 2004 Meeting of the WFD CIS Working Group 2A ECOSTAT summary Presented by Anna-Stiina Heiskanen Joint Research Centre The.
Jorge RODRIGUEZ ROMERO 1 EU Water Framework Directive Improving the communication of the intercalibration exercise WG A ECOSTAT meeting Ispra, March.
Status: Item 6 – WISE developments and Implementation Plan WG D Reporting 21 March 2006.
1 The WISE implementation plan and WISE development support by the Technical Group Stefan Jensen WISE GIS workshop Brussels.
Working Group "European Statistical Data Support" Luxembourg, 15 th February 2012 “Presentation of the new version of Assist“
Working Group 2A ECOSTAT Finalisation of the intercalibration register Presented by Wouter van de Bund Joint Research Centre Institute for Environment.
Overview and first analysis of the IC register
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
Task on Harmonisation of Freshwater Biological Methods
Intercalibration excersice progress report Presented by Palle Haastrup Joint Research Centre Institute for Environment and Sustainability Inland.
Common Implementation Strategy for the Water Framework Directive Working Group A ECOSTAT Ecological Status 7th Meeting Stresa, Lago Maggiore, Italy
IC network selection process
Results of the metadata analysis Meeting of the Working Group 2A on Ecological Status (ECOSTAT) March 4-5 , 2004, Ispra, Italy Peeter Nõges Anna-Stiina.
Viewing and updating (meta)data Deleting sites
Working Group A ECOSTAT October 2006 Summary/Conclusions
Working Group 2A ECOSTAT Objectives & Agenda of the meeting March 2005
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
EU Water Framework Directive
WG 2A Ecological Status First results of the metadata collection for the draft intercalibration register 2nd meeting WG2A, 15-17/10/03.
Progress on Natura 2000 filtered database
Review of Decision 2010/477/EU and MSFD Annex III
Draft Commission Decision on Intercalibration
Task 1 - Intercalibration WG 2A ECOSTAT - Intercalibration
Review of Decision 2010/477/EU and MSFD Annex III
Working Group 2A ECOSTAT Intercalibration process - state of play Wouter van de Bund & Anna-Stiina Heiskanen Joint Research Centre Institute for Environment.
Planning of MISSOC activities until the October Network Meeting
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, October 2005 Progress in the intercalibration exercise.
Task on harmonization WFD Annex V 1.3.6
Agenda Item 6(a): Review of the list of priority substances (Decision 2455/2001/EC) WG-E(1)-17/10/INERIS - Data collection.
Harmonisation Activity Progress report
Action Points 16th meeting of the Working Group on
Common Implementation Strategy for the
Crime & Criminal Justice Data & metadata collection
Update on progress since last WG meeting (13-14 June 2002)
Meeting of the WFD CIS Working Group 2A ECOSTAT Introduction & objectives Presented by Anna-Stiina Heiskanen Joint Research Centre The Institute.
Working Group A Ecological Status - ECOSTAT State of play in the intercalibration exercise Water Directors Meeting, November 2005.
Natura 2000: points of information
Progress Report Working Group A Ecological Status Intercalibration (1) & Harmonisation (3) Activities Presented by Anna-Stiina Heiskanen EC Joint Research.
WFD – CIS Working group A ECOSTAT
MRUs - update Irene del Barrio (EEA) September 28, 2017
Water Directors’ Meeting Working Group D (Reporting) activities
WG A Ecological Status Progress report April-October 2009
EU Water Framework Directive
Working Group A ECOSTAT progress report on Intercalibration Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Water Directors meeting Warsaw, 8-9 December 2011
Water Directors meeting Spa, 2-3 December 2010
Submitting national data through Reportnet
Working Group 2A ECOSTAT Guidance for the intercalibration process Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability.
Metadata analysis.
WFD CIS 4th Intercalibration Workshop
Guidelines to translate the intercalibration results into the national classification systems and to derive reference conditions Presented by Wouter.
Scene setter European Commission DG Environment
Working Group A Ecological Status - ECOSTAT WFD CIS Strategic Coordination Group meeting, 22 Febraury 2006 Progress Report.
Common Implementation Strategy for the
WG A Ecological Status Progress report April-October 2010
Common Implementation Strategy for the
WFD CIS WG ECOSTAT meeting on 8-9 October 2007 Objectives What do we need to achieve during this meeting?
Harmonisation Activity Progress report
Review of Decision 2010/477/EU and MSFD Annex III
Working Group 2A ECOSTAT progress report Presented by Wouter van de Bund Joint Research Centre Institute for Environment and Sustainability Inland.
EU Water Framework Directive
WG A Ecological Status Intercalibration: Where do we go from here ?
WG A Ecological Status Progress report October 2010 – May 2011
Presentation transcript:

WG2A meeting 7-8 October 2004 Working Group 2A ECOSTAT Agenda item 9b Discussion on final Intercalibation register

WG2A meeting 7-8 October 2004 Register of the IC network List of sites in the register now finalised and sent to DG ENV (attached) JRC has compared the current list with planned submissions as presented by the Committee members in their meeting in late May (some differences observed) Any further problems with site list: communicate with JRC, DG ENV & national Committee members, Draft decision with the list of sites presented to WFD Committee on October for final discussion Translations Formal voting in early 2005

WG2A meeting 7-8 October 2004 Error checking of site information and metadata (1) First error checking during site submission (e.g. numbers where required – vs letters) Second sense checking for locations/ coordinates –carried out manually as the sites were submitted –using GIS mapping system –sites in right country? –sites situated in the water body? –errors reported directly to data sources/ providers

WG2A meeting 7-8 October 2004 Error checking (2) Sense checking after closing date (now) –First check-up by JRC (P. Nõges ) –Database needs to be cleaned from obvious errors (numerical values clearly wrong, wrong GIGs or common types) –Still lots of data that cannot be checked centrally, but either GIGs or MS experts will observe problems when using data

WG2A meeting 7-8 October 2004 Error checking (2) JRC will carry out first sense checking Really obvious/ clear mistakes in the metadata (e.g. discrepancies btw GIGs-types) will be corrected directly For further errors, data providers will be contacted directly and asked for corrections (send corrections by or if needed, re- submission of the metadata)

WG2A meeting 7-8 October 2004 Timetable Data providers contacted & corrections received - October Full metadata files available in early November IC-site metadata needs to be made publicly available (CIRCA, WISE-IC website) – discussion issue? MS in GIGs carry out further sense-checking along their work in November - February 2005 JRC/ EEWAI will keep error-log Report errors continuously If needed, JRC will made corrected metadata available in early 2005 (version 2)

WG2A meeting 7-8 October 2004 Other issues JRC plans to make an overview report of the composition of the IC network (October-Jan.) Will be presented in the next meeting in March 2005 Completing missing metadata & adding information? –GIGs decide if additional information will be needed –Reporting system is available for updating files Questionaire of user experiences is planned during this autumn Response needed for developing future reporting under the WISE-system