Progress of Cold Top Seal for 1 & 4 inch Test Pieces Dean Walters Bob Wagner Argonne National Laboratory Marc Kupfer Ernesto Indacochea University of Illinois.

Slides:



Advertisements
Similar presentations
Civil Engineering Specifications for the Water Industry
Advertisements

Safe Use and Operation of Vacuum Lines
Evaporator Carbon coating. Evaporator Step 1 Check that all switches on control console are to OFF position. Automatic Vacuum Control knob should be.
Gluing Tests - DIPTEM Genova - Adhesives Shear tests with four different adhesive types: Adhesive tape NITTO DENKO 30 µm thick Adhesive tape NITTO DENKO.
Canning of Whole Tomato Next. Tomatoes may be preserved for long time by processing them in cans. The cans are made of tin plate with special lacquer.
HQ Coil 18 Test Impregnation LARP Video Meeting November 21, 2013 Dan Cheng.
WHY SODIUM FUSIONS? Sodium reacts violently with water. Extreme caution must be exercised. WHY SODIUM FUSIONS? Organic compounds usually contain carbon,
Heavy Liquids Separation. Heavy Liquids Overview Methylene iodide (MI; ρ = 3.32 g/cm 3 ) is used to concentrate material according to density. When added.
1 LAPD Team Meeting 10/14/09 O.H.W. Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley Bialkali Photocathode.
MQXFS Coil Impregnation Procedure and Discussion 11/13/2014.
Vacuum Box Systems.
Encasement Fabrication and Testing: Processes and Innovations Richard Rhorer National Institute of Standards and Technology “Parchment and Titanium” National.
Millipore DI Water Purifier Ron Kmak, Zeljko Matijas, Laura Skubal, Dean Walters, and Bob Wagner 28 September 2011.
SSRF1 ALUMINUM ALLOY VACUUM CHAMBERS FOR SSRF L.X. Yin, D.K. Jiang, H.W. Du, X.L. Jiang SSRF Vacuum Group Shanghai National Synchrotron Radiation Center.
D. Peterson, “LC-TPC LP endplate”, LC-TPC group meeting at ALCPG07, 21-October Discussion for the LP endplate See also:
Specs and Design Options for a 8”-flat-panel MCP-PMT Fabrication Facility Dean Walters Argonne National Laboratory.
Apr. 16, 2007 Undulator Breakout Dean R. Walters 1 Vacuum System Undulator Vacuum System Dean R. Walters Soon-Hong Lee, James Bailey, James.
Dean R Walters Chamber and Bellows Jan. 5, Summary Chamber The plan is to construct a chamber made of 316LN stainless steel with.
Status of 201 MHz Prototype and RFCC Module Derun Li, S. Virostek, M. Zisman Center for Beam Physics Lawrence Berkeley National Laboratory In collaboration.
Bob Lill LCLS week January 22-24, 2008 LCLS Cavity BPM Production Status.
20. June 2005SDW2005: Plasma Cleaning S. Deiries, ESO 1 Plasma Cleaning A new method of ultra-cleaning detector cryostats Sebastian Deiries, Armin Silber,
D Walters Undulator System June 17, Undulator System Components Status Dean Walters.
1. Safe Use and Operation of Vacuum Lines, UCLA Chemistry and Biochemistry 2.
L H H L L H Pitot tube High pressure flow Low pressure flow Pressure transmitter Magnehelic vacuum gauge Pitot tube tip Pitot tube schematic Air flow.
Christopher Nantista ML-SCRF Technology Meeting July 28, 2010 REPORT.
1 Cryostat assembly, integration and commissioning procedures M.Olcese Version: 07 May 2008.
EXAMPLE 1 Find slopes of lines in a coordinate plane Find the slope of line a and line d. SOLUTION Slope of line a : m = – 1 Slope of line d : m = 4 –
10.3 Notes Breath Test Instruments. Objectives  Understand the concepts of infrared and fuel cell breath- testing devices for alcohol testing.
DROP IN ANCHOR DETAIL COMMERCIAL SERIES LIFTS INSTALLATION MANUAL Drop In Anchor/COMMERCIAL SERIES.
NCSX Vacuum Vessel Joint Design Mike Viola PPPL July 1 st, 2003.
PETS EuCARD. Present status and precision assembly L. Sánchez, F. Aragón, J. Calero, J.L. Gutiérrez, E. Rodríguez, F. Toral, CIEMAT 26/10/2011.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
TRENTON Casing Filler Presentation
Photo-detector Tube Construction Laboratory Considerations Dean Walters Argonne National Laboratory.
Thomas Jefferson National Accelerator Facility Page 1 Clear Mold VPI Visualization D. Kashy S. Christo May 14, 2014.
1.3GHz Input Coupler for ILC
1 LAPPD Team meeting 6/10/2010 Ossy Siegmund, Experimental Astrophysics Group, Space Sciences Laboratory, U. California at Berkeley Bialkali Photocathode.
LAPPD Collaboration Review 12/9/2011 Ossy Siegmund, Sharon Jelinsky, Jason McPhate, Joe Tedesco Experimental Astrophysics Group, Space Sciences Laboratory,
ATLAS Pixel Detector Cooling Connections Testing and Development: Progress Report April 26, 2001 N. Hartman, E. Anderssen, M. Gilchriese, F. Goozen, T.
Presented by: Joseph Coyle PROJECT 1- CAR WASH 12/7/11
Muoviteknologia Teppo Vienamo Joints / attachments Principles of joining plastics parts Mechanical joints / attachments Adhesives Welding.
1 Status of Vacuum Process Facilities at SSL 16 October 2009 Sharon R Jelinsky Space Sciences Laboratory, UC Berkeley.
Test Results on Sealing in Options A & E Dean Walters Argonne National Laboratory Michael MinotMinoTech Engineering Inc.
Recent Electron-Cloud Mitigation Studies at KEK E-cloud mitigation mini-workshop on November at CERN Kyo Shibata (for KEKB Group)
A valve must be used to control water flow from ablution hose. Sample drawing for 6270 WC pan. ABLUTION HOSE APPLICATIONS.
HOW TO WASH A CAR PRESENTED BY: Daniel Leppke Project 1- Car Wash 10/9/12.
LARP Collaboration Meeting Racetrack Coil Fabrication
Outgassing Test and the Getter Specification
T h e U n i v e r s i t y o f I l l i n o i s a t C h i c a g o Joining Science and Advanced Materials Research Laboratory Preliminary Uncoated Glass-to-
T h e U n i v e r s i t y o f I l l i n o i s a t C h i c a g o Joining Science and Advanced Materials Research Laboratory Preliminary Uncoated Glass-to-
The world leader in serving science Transmission Techniques Liquids.
The Argonne Small Tile Photodetector Facility and Device Processing Lei Xia.
LAPPD Device Processing: Scrubbing, Baking and Sealing Lei Xia.
Hao Guo LINAC Department Institute of Modern Physics.
Plumbing Unit. Purpose: Transporting liquids safely from one point to another for storage, processing, and direct use Carries fresh water from a source.
Jan , 2008 LCLS Undulator Week Dean R. Walters 1 Vacuum Components Undulator System SH Lee, J Morgan, and D Walters.
Screen Printing Create a file in Illustrator either 8” x 10” or 11”x17”. The top layer can be a comprehensive of your final color scheme. On the second.
Discussion for the LP endplate
QXF Coil Fabrication & Tooling Reaction / Impregnation
Pneumatic and Hydraulic
ASPERA Technology Forum 20/10/2011
Tracker Outer Barrel COOLING Antti Onnela, CERN.
Presented by: Jacob Thurston Project 1 - How to Wash a Car
Project 1 Car Wash.
TRENTON Casing Filler Presentation
Lithium lens and window tests
LCLS Vacuum System Plans (July 07)
Presentation transcript:

Progress of Cold Top Seal for 1 & 4 inch Test Pieces Dean Walters Bob Wagner Argonne National Laboratory Marc Kupfer Ernesto Indacochea University of Illinois – Chicago July 13, 2012

 Tests on 1 inch samples are in preparation for Shear Testing. –Samples in this set of runs have coatings on the Top Window and the Sidewall. –Samples were made this way to avoid the ambiguity of one part coated and one part plain glass as in the past. –Samples were coated with chromium, titanium, and Nichrome. Coating thickness were > 60 nm. –Testing was performed in air and in vacuum. –Majority of parts leaked. –While this is troubling this is not fatal, as these parts were going to be used for Shear Testing.  Evaluated cleaning and coating steps. –Returned back to the acetone and alcohol ultrasonic cleaning steps rather than the Citranox and water rinse. –Reduced the coating thickness from > 60 nm to 20 nm. –Subsequent parts were leak tight. July 13, 2012 D. Walters 2 Current Testing Progress

Shear Test Tooling July 13, 2012 D. Walters 3 Design has been completed and the drawing for the tooling has been made. The order has been passed to the local vendor. Tooling is scheduled to be ready on 7/27/2012 Vendor has been notified about the urgency of these parts.

Indium Tin Oxide coatings  Coating of ITO, Indium Tin Oxide, were recently made  Coating was approximately 20 nm thick –(1) Test in air and (2) tests in vacuum were completely leak tight July 13, 2012 D. Walters 4  While the coating is generally clear it presents was detected using an ohmmeter.  This will also be subject to the Shear Test when it become available.

Next Steps for 4 inch Samples July 13, 2012 D. Walters 5  Double plate samples –In this test there is one side of the sidewall that has been fritted with a glass plate (with a pump out hole) while in a second step a Top Plate will employ an indium seal to joint it to the other parts. –This test will prove/disprove whether the flexibility of the sidewall is cause of the seal delamination problem.  Bolted Compression Fixture –This was designed to perform very long compression tests. –At this point the hydraulic pump only has the ability to run for ~11 minutes. –This fixture will allow tests to go overnight if needed. –This can be scaled up to 8 inches.

Outgassing Tests Redux  Work has begun to re-assemble the Outgas Measurement System.  All the major parts are in place.  The system was recently started and a few bugs need to be worked out of the system. July 13, 2012 D. Walters 6 4 inch test chamber