Muon Upgrade Meeting (14.4.10) – P. Campana Since our last discussion : - CB decision to prepare a LOI for an Upgrade of LHCb (approx 100 pages, 10 for.

Slides:



Advertisements
Similar presentations
Sci-Fi tracker for IT replacement 1 Lausanne 9. December 2010.
Advertisements

Burkhard Schmidt for the LHCb Collaboration The LHCb upgrade Outline: Present LHCb detector and trigger LHCb upgrade – main drivers Overview of the sub-detector.
P5 Meeting - Jan , US LHC University M&O Personnel University with major hardware responsibility at CERN Based on > 10 years of US Zeus experience.
Status & Goals of LHC 1 1pb-1 of delivered and recorded luminosities reached! As of this morning: Delivered: 1420 nb-1 Recorded: 1245 nb-1 New record Inst.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
Sept. 18, 2008SLUO 2008 Annual Meeting ATLAS Detector Upgrade Opportunities M. G. D. Gilchriese Lawrence Berkeley National Laboratory.
ATLAS detector upgrades ATLAS off to a good start – the detector is performing very well. This talk is about the changes needed in ATLAS during the next.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
1 WG5: MPGD related Electronics Tue. Oct. 14 th 9:00 to 12:00 W. Riegler, M. Campbell, CERN 2 nd RD51 Collaboration Meeting Paris, Mon. Oct 13 th to Wed.
February 19th 2009AlbaNova Instrumentation Seminar1 Christian Bohm Instrumentation Physics, SU Upgrading the ATLAS detector Overview Motivation The current.
The SLHC and the Challenges of the CMS Upgrade William Ferguson First year seminar March 2 nd
Bump Bonding and Thinning of Hybrid Pixel Detectors Kiyoshi Tanida (RIKEN) Johann M. Heuser (RIKEN) PHENIX upgrade workshop, Aug 2002 Contents Bump bonding.
U.S. ATLAS Executive Meeting Upgrade R&D August 3, 2005Toronto, Canada A. Seiden UC Santa Cruz.
TOF for ATLAS Forward Proton Upgrade AFP concept: adds new ATLAS sub-detectors at 220 and 420 m upstream and downstream of central detector to precisely.
Simulation issue Y. Akiba. Main goals stated in LOI Measurement of charm and beauty using DCA in barrel –c  e + X –D  K , K , etc –b  e + X –B 
1 Performance of the LHCb VELO Outline LHCb Detector and its performance in Run I LHCb Detector and its performance in Run I LHCb VELO LHCb VELO VELO performance.
1 LHCC meeting CERN, 22/23 Sept 2008 F. Muheim The LHCb Upgrade Introduction/Overview LHCb & Upgrade physics programme Trigger/DAQ Upgrade Detector Upgrade.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
April 21st 2010Jacques Lefrancois1 UPGRADE NEWS Scope of upgrade presented by Andrei in upgrade meeting April 16th Role of trigger presented by Hans in.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
13 June 2013Laurent Roy Optical Fibers / Electronics Upgrade -Fibers need for Upgrade -> Installation ? -Two techniques possible for multi fibers installation.
Status of the MaPMT o Status quo o Ongoing work o Issues – mechanics – electronics – schedule o Conclusions LHCb meeting Milano Franz Muheim.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
LHCb Upgrade Quick reminder of our strategy New developments New simulation results on occupancies Reduced material beampipe support New progress in the.
Santa Cruz Meeting August 12 th 2008 Layout options & Schedule Issues David Lissauer 8/12/2008 1David Lissuaer, Santa Cruz Meeting.
C. F. Bedoya. C. F. Bedoya May 13th, * The goal was to establish a baseline plan for DT in Phase 2, (although some aspects of phase 1 also needed.
PHASE-1B ACTIVITIES L. Demaria – INFN Torino. Introduction  The inner layer of the Phase 1 Pixel detector is exposed to very high level of irradiation.
UCSC August 12, 2008 U.S. Upgrade R&D Meeting: Strip Detector  Seiden.
Detector Development Overview Group Meeting – October 2014 Euan N. Cowie 22 October Detector Development Overview - ENC.
6-Aug-02Itzhak Tserruya PHENIX Upgrade mini-Workshop1 Boris Khachaturov, Alexander Kozlov, Ilia Ravinovich and Itzhak Tserruya Weizmann Institute, Israel.
High-resolution, fast and radiation-hard silicon tracking station CBM collaboration meeting March 2005 STS working group.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
M23 Inner Regions Upgrade with Triple-GEM detectors The EVLGG (Davide, Gianni & Ale) INFN Cagliari LNF Frascati INFN Roma.
1. Efficient trigger for many B decay topologies Muon System CALORIMETERS PRS + ECAL+ HCAL RICH1 VERTEX LOCATOR Efficient PID Good decay time resolution.
Jan 24, 2005Tracking Upgrades Welcome and Agenda Carl Haber 1 US ATLAS: Meeting on SLHC Tracking Upgrades Jan 2005 Lawrence Berkeley Lab Welcome.
Ideas for Super LHC tracking upgrades 3/11/04 Marc Weber We have been thinking and meeting to discuss SLHC tracking R&D for a while… Agenda  Introduction:
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
Fabiola Gianotti, 14/10/20031  s = 28 TeV upgrade L = upgrade “SLHC = Super-LHC” vs Question : do we want to consider also the energy upgrade option.
Tommaso Boccali SNS and INFN Pisa Vertex 2002 Kailua-Kona, Hawaii 3-8 November 2002 High Level Triggers at CMS with the Tracker.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
Provocative. Who needs detector hardware (until 2025)? ATLAS LHCb KM3 ALICE Darwin/XENON ILC/CLIC Virgo/GW Auger ? medical imaging, beam therapy.
1 LHC detector upgrades Marc Weber ATLAS Upgrade Tracker Upgrade; Trigger Upgrade CMS Upgrade Track trigger LHCb Upgrade RICH  PPD is involved in all.
Giulio Pellegrini Actividades 3D G. Pellegrini, C. Fleta, D. Quirion, JP Balbuena, D. Bassignana.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
1/20 LHCb upgrade, Jeroen van Tilburg Nikhef Jamboree, 14 Dec 2015 Preparing for the LHCb upgrade.
Technology and R&D Summary and next steps Burkhard Schmidt.
Upgrade Intro 10 Jan 2010 Norman Gee. N. Gee – Upgrade Introduction 2 LHC Peak Luminosity Lumi curve from F.Zimmermann : Nov Upgrade Week ? ?
Aras Papadelis. NIKHEF 1 Aras Papadelis B-physics meeting 15/ Results from the Nov2004 VELO test beam (and what followed…)
Panja Luukka. Silicon Beam Telescope (SiBT) Group Since 2007 a collaboration of several CMS institutes has been operating a silicon micro-strip beam telescope.
Upgrade plans for ATLAS. Nigel Hessey (Nikhef) is overall ATLAS upgrade coordinator.
LHCb Outer Tracker Electronics 40MHz Upgrade
Developing Radiation Hard Silicon for the Vertex Locator
Overview and update of LHCb Upgrade
 Silicon Vertex Detector Upgrade for the Belle II Experiment
The LHCb Upgrade LHCb now Upgrade motivation New trigger and DAQ
The LHCb Calorimeter system
Results achieved so far to improve the RPC rate capability
ATLAS-MUON Trigger hardware developments
Introduction LOI Hardware activities and GBT Simulations
L1Calo upgrade discussion
Rich Occupancies and Bandwidth in Minimal Upgrade Layout
TIMEPIX TESTBEAM TELESCOPE FOR AIDA
The Pixel Hybrid Photon Detectors of the LHCb RICH
ATLAS Upgrade R&D and Plans
Setup for testing LHCb Inner Tracker Modules
The front-end Electronics for the LHCb upgrade.
Tracking in SuperLHC 1. Radiation damage
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

Muon Upgrade Meeting ( ) – P. Campana Since our last discussion : - CB decision to prepare a LOI for an Upgrade of LHCb (approx 100 pages, 10 for the Muon System, ready by the end of 2010) - a “brainstorming meeting” on L0 and ODE Muon electronics (  Caterina) - some preliminary studies on muon-id at high lumi (  Sara) Today: - Discuss and prepare the outline of the contents of the Muon chapter - Start general discussion on ideas/statements/strategy from the Muon group and from the Laboratories involved 1

What about other SD (from Upgrade Leader Meeting ) VELO Quite well organized and running Strong interests and committments (UK, Syracuse, Nikhef,...) Options: strips or pixel (preferred) counting on several R&D (MediPix, SLHC, ILC) $$ status: UK application not financed, a sizeable R&D grant to US group Tracking Simulations suggest to increase granularity in the inner region (x4 in silicon area) Technically and moneywise not easy (rise the inner part of OT?) 40 MHz FEE would oblige to rebuild IT High granularity could be obtained with thin fiber tracker (Lausanne, Dortmund) 40 MHz FEE is doable in OT, but inner part could suffer from high occupancy (30- 40%): substitute the central part with thick fiber tracker (R&D in Frascati) ? Nikhef & Heidelberg showed interest in 40 MHz FEE for OT No committments on the rest 2

RICH 40 MHz = replacement of PM and electronics Several groups are active (Milano, Genova, Edinburgh) Choice of PM under way (multi anode Hamamatsu), R&D on readout chip (the same of Velo?) TORCH, SuperRich, nice ideas, but irrealistic for the time being CALO Project of new readout boards at 40 MHz well underway Issue on radiation resistance of PM & inner modules not yet solved Pileup could be important (inner region = higher granularity) Electronics General coordination of activities Tell40 and GBT link quite advanced Studies ongoing on ADC chip Online General consensus that a farm digesting 40 MHz (2TB/s, 2,000 links and 4,000 CPU) is not a problem...(!) 3

Why a LOI to set the point of view of LHCb to the CERN management to give a perspective to LHCb after “phase 1” (6 fb-1?) to mantain alive LHCb technical resources inside the LABs to start the process of funding >> to make clearer to ourselves the meaning of upgrade << to understand the committments of LABs When (the upgrade) It has been said (CB and elsewhere) 2016 Nobody knows the LHC plans (they may change) Many of us believe that 2016 is unreasonable for a full upgrade (VELO and 40 MHz everywhere): one could go in steps Personal point of view – 2 weakness  Several years ago, LHCb committed to FA for 10 fb-1 - Already now, people speaks of upgrade after 6 fb-1 - I can imagine the reactions when asking for money  GDP are for the time being out (I hope to be wrong) for NP: everything is on LHCb shoulders. What if we see nothing (and we rule out faint FNAL NP signals) ? 4

LOI Muon Chapter outline It should reflect our understanding of Muon system propagating low lumi (real) data Ageing of detectors (not only due to radiation) Rate problems in inner regions Compatibility of ODE/ECS electronics with the rest of the world Performances of the detector (mu-id, background, noise, etc...) Can we do better (eg. de-striping the pads) ? And how much would cost the various options who (and under which conditions) would do them Note: several groups are committing for the R&D, not necessarly for the (real) upgrade. This is a general feeling and somehow should be reflected in the wording of LOI 5