28 th January 2016 LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General.

Slides:



Advertisements
Similar presentations
SIEP HSE Management System
Advertisements

Dr. José Miguel JIMENEZ LS2 Coordinator LHC Performance Workshop (Chamonix 2014) Session 8 - Long Shutdown 2 Strategy and Preparation Chair: José Miguel.
Quality Manual for Interoperability Testing Morten Bruun-Rasmussen Presented by Jos Devlies, Eurorec.
CDM 2015 How relevant is CDM 2015 to a Facilities Manager? A Discussion Paper Prepared by Henry Penn April 2015.
LHC Performance Workshop - Chamonix January 2010 Session 4 - Safety for Personnel Underground - He Evacuation What can the Safety Coordination.
Safety & Safety Documentation 2 3 Safety in three Questions Why ? Providing a safe workplace is a legal and moral obligation on every undertaking, and.
(H.L.) HAZARD ANALYSIS CRITICAL CONTROL POINTS
André Henriques DGS/SEE LIU-PSB OOSTER. HSE S AFETY C ORRESPONDENT 13 TH S EPTEMBER 2012 September 2012.
Organization and Implementation of a National Regulatory Program for the Control of Radiation Sources Staffing and Training.
Radiation Protection LS1 - Collaboration with CERN Technical Groups - Lessons learnt Stephane Bally (CERN), Sandro Di Vincenzo (CERN) Indico
OSH policies and practice in the European Union Laurent Vogel ETUI-REHS July 2006.
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. O. Beltramello, G. Corti, B. Di Girolamo, R. Lindner, W. Riegler, C.
HL-LHC Project Kick-off Meeting Friday 15 th April 2011 Sylvain Weisz DG-DI-DAT on the behalf of the A&T Sector Projects Support Office.
Experiences on risk analysis, modelling and the preparation of safety reports in the Netherlands Eric van der Schans Senior Consultant DHV.
CIP Quality System for Genebank ISO 17025
TS, Length of YETS EYETS LIU & CONS Project
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Engineering Department ENEN What is changing in EN 1. Streamlining and boosting remote handling and manipulation activities 2. Bringing small works closer.
Access zones and Training Steve Hutchins BE-ASR IEFC workshop 7/3/2012.
1 EARLY SAFETY MANAGEMENT OF PROJECTS AND EXPERIMENTS HSE UNIT PH DSO EDMS No
RSSO refresher meeting J. Pedersen M. Tavlet, T. Otto.
The organization and on-site follow up of the electrical installation work for the LHC The organization and on-site follow up of the electrical installation.
Staffing and training. Objectives To understand approaches to the development of strategies and policies for staffing of a Regulatory Authority including.
BULGARIA STATE AGENCY FOR METROLOGY AND TECHNICAL SURVEILLANCE BULGARIA 2003.
Radiation Protection optimisation 3D planning tools and their applicability to occupational exposure at a fusion power plant F.Vermeersch SCKCEN EFDA 27.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Safety in LS1 Thomas Otto, TE DSO.
LS2 Safety Thomas Otto, LS2 Safety Coordinator.
PH Department in context Safety Officers in PH Department
Workshop Objectives & Highlights from Daresbury Meeting Erk Jensen, CERN.
Independent Expert Program Review (IEPR) February 2006.
M. Arnaud, C. Bedel, J. Etheridge, E. Paulat CERN SAFETY AND COORDINATION TEAM.
Last but not least : LS2 General Safety 1 Thomas Otto, LS2 Safety Coordinator for LHC Ana-Paula Bernardes, LS2 Safety Coordinator for Injectors.
ADO-PO Section Meeting Safety Activities Sigi Wenig (LEXGLIMOS) 8 September 2015.
Safety in LS1 Thomas Otto, TE DSO.
ALARA REVIEW WORKING GROUP (ARWG) New ALARA recommendations proposed by the ALARA REVIEW WORKING GROUP (ARWG) Heinz Vincke on behalf of ARWG LS1 committee.
28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Long.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Dr. José Miguel JIMENEZ LS2 Project Leader, CERN 1 LS2 Days 30 th September2015.
1 st of April st LS2C LS2 Committee Mandate and Organization 2 Chairman:Jose Miguel JIMENEZ Deputy:Jean-Philippe.
ESS Cryomodule Status Meeting – Elements of Safety | | Christine Darve Elements of Safety Applicable to the ESS 2013 January, 9 th Christine.
Logo area 11 T Review: Safety and Codes Thomas Otto HL-LHC Project Safety Officer With contributions by -Frédéric Savary, Hervé Prin, TE-MSC -Carlos Arregui,
Meet your Regulator Workshop with FANR licensees October 2011 Dr. John Loy Director, Radiation Safety Federal Authority for Nuclear Regulation.
Application of « ALARA » at Tihange NPP ISOE EUROPEAN SYMPOSIUM 26 June 2008 Ir. Philippe Petit – Deputy head of SRP department 2 2.
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer With contributions by -Paolo Ferrcin and Ezio Todesco, TE-MSC -Francesca Viggiano,
Logo area MQXF Review: Safety Thomas Otto HL-LHC Project Safety Officer International Review of the Inner Triplet Quadrupoles (MQXF) for HL-LHC.
Electrial Safety LS2 days November 2016 AP
LS2 Safety Preparation Thomas Otto, LS2 Safety Support Officer for LHC
Cryogenic safety organisation at CERN
Planning for Succession
Being TSO at CERN Safety at CERN Being TSO at CERN Safety at CERN.
Stephen Fennell The Role of the Regulatory Body
WP 3 How to assess implementation of ALARA
Safety in Construction and Upgrade Phases
HSE rules & regulations
Quality Assurance applied to Accelerator Safety
Safety rules for works supervisors
PSB lock-out test - Organisation AP. Bernardes, D. Hay, C
LS2 session J.M Jimenez, J.-P. Tock, K. Foraz 24/11/2017
Works and Services Supervisor
Independent Expert Program Review (IEPR)
HACCP HAZARD ANALYSIS CRITICAL CONTROL POINTS
EN Safety Talks Motivation and Concept
Ian Evans SSRL Safety Office
Safety in the East Area Renovation Project
Work and Service Supervisor
CR-GR-HSE-302 Management of change
Management of Change GROUP HSE RULE (CR-GR-HSE-302)
Contingency Planning for Accidental Surface Water Pollution​ GROUP HSE RULE (CR-GR-HSE-705) EXECUTIVE SUMMARY This rule sets specific requirements to be.
Frank Power Ergonomist (Inspector) Health and Safety Authority
Presentation transcript:

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. General Safety (15 min) 1 Thomas Otto (TE-HDO)

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Who is in charge ? Hierarchical line of Safety responsibility Safety officers and HSE unit have a supporting role (outline the support of each one) 2

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Outline Scope Your responsibility (Safety CERN) Two aspects of Safety Various Safety Prevention actions Time line – plan ahead ! 3

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Setting the Scope 4 Long Shutdown Commissioning Operation Technical Stop YETS EYETS *YETS LS2 4 4 Activities independent from the operation (i.e. surface, Linac4…)

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Two aspects of Safety ConformityWorkplace Safety EquipmentProcess Standards (ISO, EN, Eur. Dir….)Safety Rules, best practice InspectionHazard identification, risk assessment Report on non-conformitiesSafety Report, action list Make conformApply rules and best practice Conformity marking User manualProcedure manual Training in use of equipmentTraining the process Safety Training Personal Protective Equipment 5

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Conformity Issues Have all relevant equipment inspected, Upgrade where necessary Establish user manuals Especially for CERN in-house modified/ produced equipment or tools) Train users 6

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Workplace Safety Issues Identify relevant processes for risk analysis (“complex” processes …) Put into place recommended actions Establish process manuals Especially for “complex”, “high-risk” processes which are not industry standard Train users 7

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. ALARA to the rescue The ALARA dose optimisation process Based on a process description (with timing) Optimisation: plan the process to be as rapid as possible, without mistakes Collaboration between executing unit and HSE Other safety aspects often included: asbestos, physical constraints, … An example of successful safety prevention Frequently necessary in LIU projects ALARA III committee for EYETS on … 8

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Visite dínspoection commune Coordination of co-activities Takes place shortly before intervention Too late to make important changes 9

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Safety Training Formal Training (HSE unit) Capacities limited Plan requirement ahead (personnel scheduling) Language issue (not EN/FR) unresolved On the job training (your responsibility) For processes and equipment Include in schedules 10

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Plan ahead Timeline How much time ahead for Conformity issues Process analysis Optimisation, ALARA committee Formal training On-the-job training VIC 11

28 th January LHC Performance Workshop Session 8: (E)YETS and Long Shutdown 2 Strategy and Preparation. Conclusions QWERTY 12