Status of UA9 Walter Scandale for the UA9 Collaboration 1W. Scandale – SPSC 22-10-2014 Outline  Concept of crystal collimation  Recall of previous UA9.

Slides:



Advertisements
Similar presentations
FLUKA studies: channeled ions on LHC IP7 L. Lari (CERN & IFIC (CSIC-UV)) D. Mirarchi (CERN & ICL) A. Lechner (CERN) ColUSM#32 December the 6 th,
Advertisements

Tomsk Polytechnic University1 A.S. Gogolev A. P. Potylitsyn A.M. Taratin.
W. Scandale for the UA9 Collaboration CERN – IHEP - Imperial College – INFN – JINR – LAL - PNPI – SLAC LAL January 24, 2012.
W. Scandale for the UA9 Collaboration CERN – IHEP - Imperial College – INFN – JINR – LAL - PNPI – SLAC SPSC, October 25, 2011.
Introducing Channeling Effect
Yury CHESNOKOV Crystal Collimation workshop, March 7, 2005 CALIBRATION of CMS CALORIMETERS with LHC PROTON BEAM DEFLECTED BY CRYSTAL CALIBRATION of CMS.
Upcoming Review of the Hall D Photon Beam and Tagger Richard Jones, University of Connecticut, for the GlueX collaboration GlueX Collaboration Meeting.
NTA-HCCC Stato aggiornato della sperimentazione Vincenzo Guidi Sezioni di FE, LNL, MIB (Como e TS) Partecipazione esperimento UA9– CERN Coordinato da W.
Эксперимент UA9 в CERN Ю.М.Иванов, лаборатория мезоатомов Ученый Совет ОФВЭ ПИЯФ.
3 F. Iacoangeli, 1 D. Breton, 1 V. Chaumat, 3 G. Cavoto, 1 S. Conforti Di Lorenzo, 1 L. Burmistrov, 3 M. Garattini, 1 J. Jeglot, 1 J. Maalmi, 2 S. Montesano,
Elastic Scattering at s=1.96 TeV Using the DØ Forward Proton Detector
Matching and Synchrotron Light Diagnostics F.Roncarolo, E.Bravin, S.Burger, A.Goldblatt, G.Trad.
Possible measurements with crystals in NA Test of single crystals for the SPS and LHC beam collimation.
LAL ALESSANDRO VARIOLA, LAL - IN2P3 – CNRS THANKS TO T.DEMMA, L.BURMISTOV UA9 is the crystal-assisted collimation experiment at CERN. The aim.
GRD - Collimation Simulation with SIXTRACK - MIB WG - October 2005 LHC COLLIMATION SYSTEM STUDIES USING SIXTRACK Ralph Assmann, Stefano Redaelli, Guillaume.
Loss maps of RHIC Guillaume Robert-Demolaize, BNL CERN-GSI Meeting on Collective Effects, 2-3 October 2007 Beam losses, halo generation, and Collimation.
CRYSTAL-BASED COLLIMATION SYSTEM AS AN ALTERNATIVE WAY TO SOLVE THE COLLIMATION PROBLEM FOR FUTURE HIGH ENERGY ACCELERATORS ALEXEI SYTOV Research Institute.
1 October 2007Reflection on bent crystals W. Scandale 1/24 OBSERVATION OF PROTON REFLECTION ON BENT SILICON CRYSTALS AT THE CERN-SPS Walter Scandale CERN.
1/17 November 2006Walter Scandale H8-RD22 Experiment to test Crystal Collimation for the LHC Walter Scandale CERN For the H8-RD22 collaboration (CERN,
Quasimosaic crystals Yu.M.Ivanov. Elastic quasimosaic (Sumbaev) effect Studied by Sumbaev in 1957 Resulted in broadening of gamma-ray diffraction peaks.
DANIELE MIRARCHI CERN FOR UA9 COLLABORATION Data reduction and analysis of SPS data.
H8-RD22 Experiment to test Crystal Collimation for the LHC Organized by: Walter Scandale Conducted at CERN Geneva, 27 September 2006 Participants included:
W. Scandale 1 Status of UA9 Walter Scandale CERN CC09 5 th workshop on crystal channeling March 2009.
Crystal channeling 2009 A. Afonin, IHEP, Protvino New results of use and research of crystals at U-70. A.Afonin, IHEP, Protvino 4- th Crystal channeling.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
Energy calibration at LHC J. Wenninger. Motivation In general there is not much interest for accurate knowledge of the momentum in hadron machines. 
Comparisons between simulations and data for crystal-assisted collimation Daniele Mirarchi, Stefano Redaelli, Walter Scandale, Roberto Rossi.
Status of UA9 1 W. Scandale on behalf of the UA9 Collaboration W. Scandale – SPSC 20/10/2015 Introduction Measurements and tests in the SPS North Area.
SPS UA9 data taking run with LHC-type Goniometer 31/07/2015 – Collimation Upgrade Specification Meeting #60 Roberto Rossi Daniele Mirarchi, Stefano Redaelli,
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Victor Tikhomirov Institute for Nuclear Problems Minsk, Republic of Belarus New Approaches to the Crystal Collimation UA9 Workshop, Roma, February.
LHC Crystal MD 22/09/2015 – LSWG #7 R. Rossi for the LHC Collimation team and the UA9 Collaboration.
Crystal Channeling Study (experiment to study and apply channeling to HEP) Vincenzo Guidi University of Ferrara and INFN.
Study Group for slow extraction assisted by bent crystals in the SPS B.Goddard, W.Scandale 23/7/15.
ATLAS-ALFA as a beam instrument Sune Jakobsen (BE-BI-PM and PH-ADO) on behave of the ATLAS-ALFA community LS1 LBOC meeting
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
H8 crystal data analysis 16/05/2014 – ColUSM meeting Roberto Rossi Daniele Mirarchi, Stefano Redaelli, Walter Scandale, Gianluca Cavoto.
Organization of the UA9 Simulations WG R. Noble, W. Scandale, Andrei Seryi, M. Silari (on behalf of the WG) UA9 Collaboration Meeting 14 May UA9.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
Status and Results of the UA9 Crystal Collimation Experiment at CERN-SPS Walter Scandale (CERN, LAL, INFN) for the UA9 collaboration Mini-workshop UA9,
Case study: Energy deposition in superconducting magnets in IR7 AMT Workshop A.Ferrari, M.Magistris, M.Santana, V.Vlachoudis CERN Fri 4/3/2005.
26 June 2007Reflection on bent crystals W. Scandale 1/22 OBSERVATION OF PROTON REFLECTION ON BENT SILICON CRYSTALS AT THE CERN-SPS Walter Scandale CERN.
Progress with Beam Report to LMC, Machine Coordination W10: Mike Lamont – Ralph Assmann Thanks to other machine coordinators, EIC’s, operators,
Backgrounds at FP420 Henri Kowalski DESY 18 th of May 2006.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
W. Scandale For the UA9 Collaboration.  Historical perspective  RD22 at the CERN-SPS as a test bed of beam extraction at LHC  E853 at the FNAL-Tevatron.
Crystal Channeling Radiation and Volume Reflection Experiments at SLAC Robert Noble, Andrei Seryi, Jim Spencer, Gennady Stupakov SLAC National Accelerator.
CHANNELING 2014 COMPTE-RENDU R.CHEHAB R.Chehab/Channeling20141.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Integration of forward physics detectors into the LSS of the LHC D. Macina (TS/LEA) Technical Support 2004 Workshop.
CRYSTAL COLLIMATION EXPERIMENT AT THE TEVATRON CSN1 LNF 17 September 2007 Walter Scandale CERN.
First BTF Users Workshop 6-7 May Laboratori Nazionali di Frascati Marco Garattini on behalf of the UA9 Cherenkov detector team 3 M. Garattini, 1.
F. Iacoangeli, on behalf of the UA9 collaboration INFN - Roma La Sapienza, Italy An in-vacuum Cherenkov detector for proton Flux Measurement (CpFM) for.
CRYSTALS AS LONG-TERM IMPROVEMENT FOR LHC COLLIMATION
Status of UA9, the crystal collimation experiment at the CERN-SPS
T980 STATUS AND CHANGES FOR
Frontier Detectors for Frontier Physics, Elba, Italy, May 2015
Bending crystals for magnetic and electric dipole moment measurements
Collimation Concept for Beam Halo Losses in SIS 100
Proposal of Piezo Goniometer for LHC Channeling experiment
First data from TOTEM experiment at LHC
Efficiency studies for CRYSTAL experiment in SPS
Potential failure scenarios that can lead to very fast orbit changes and machine protection requirements for HL-LHC operation Daniel Wollmann with input.
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
History of Crystal Extraction at the SPS (RD22)
Talk originally given at 4th Crystal Channeling Workshop
Use of Beam Loss Monitor type detectors in CNGS muon station
C.Octavio Domínguez, Humberto Maury Cuna
LHC Collimation Requirements
Beam Loss Simulations LHC
Presentation transcript:

Status of UA9 Walter Scandale for the UA9 Collaboration 1W. Scandale – SPSC Outline  Concept of crystal collimation  Recall of previous UA9 results  Achievements in 2013 Preparing the crystal collimation test in LHC Cerenkov detector for deflected proton flux measurement – CpFM Systematic analysis of the data collected in H8 Routine to simulate crystal-particle interactions  Extraction assisted by bent crystals  Perspectives and plans

Crystal collimation concept  Bent crystals allow deflecting particles by coherent interaction: large angle deflection also at high energy reduced interaction probability (e.g. diffractive events, ion fragmentation/dissociation) reduced impedance (less secondary collimators, larger gaps) BUT ✗ small angular acceptance ✗ concentration of the losses on a single absorber ✗ extrapolation to the highest energy not yet proven  The UA9 Collaboration is investigating how to use bent crystals as primary collimators/deflectors: operational and machine protection concerns are considered in cooperation with the Collimation Team. W. Scandale – SPSC θ ch ≅ α bending θ c ≅ √(2U 0 /E)

UA9-SPS: important results Crystal collimation has been extensively tested in SPS: Alignment (linear and angular) of the crystal is fast and well reproducible. Consistent reduction of the losses when comparing the crystal in channeling and in amorphous orientation: Loss rate reduction at the crystal: up to 20x for protons, 7x for ions. Loss rate reduction in the dispersion suppressor: up to 6x for protons, 7x for ions. and … Losses in the accelerator ring: consistently reduced. W. Scandale – SPSC Dispersion suppressor D x large D x small Loss rate reduction × 20 × 7 × 6

UA9-SPS: important results …. Losses all around the accelerator ring: consistently reduced. W. Scandale – SPSC sextant 1Sextant 2Sextant 3Sextant 4Sextant 5Sextant 6 crystal QT 5-22 location rough data Subtract background & drop the noisy BLM Data filtered in 2014

Important steps of UA9 W. Scandale – SPSC  Test with extracted beams at CERN North Area (~ 3÷5 weeks per year): Crystal – beam interactions Measurement of crystal properties before installation in CERN-SPS  Prototype crystal collimation system installed in CERN-SPS (~ 5 days per year): 2009 ➙ First results on the SPS beam collimation with bent crystals (Physics Letters B, vol. 692, no. 2, pp. 78–82) ➙ Comparative results on collimation of the SPS beam of protons and Pb ions with bent crystals (Physics Letters B, vol. 703, no. 5, pp. 547–551) ➙ Strong reduction of the off-momentum halo in crystal assisted collimation of the SPS beam. (Physics Letters B, 714, no. 2-5, pp. 231–236) ➙ Optimization of the crystal assisted collimation of the SPS beam. (Physics Letters B, 726, no. 1-3, pp. 182–186)  Working for future installation of a prototype system in LHC 2006 ➙ First of a crystal-assisted collimation layout (Assmann, Redaelli, Scandale EPAC2006) ➙ Medipix in a Roman pot 2009 ➙ Cherenkov quartz detector in the SPS primary vacuum 2011 ➙ Letter of Intent (CERN-LHCC / LHCC-I /06/2011) 2012 ➙ First goniometer industrially produced suited for the LHC requirements ➙ two crystals with their gonimeters installed in IR7 Beam 1 of LHC.

Scope of the tests in LHC  Directly compare the cleaning efficiency of the collimation system with and without crystals.  Address operational challenges (alignment, collimation for ramp/squeeze, …).  Confirm the effectiveness of crystal collimation on ion beams.  Check higher energy extrapolations. STRATEGIES:  Use of cleaning simulation to choose device positions and crystal parameters.  Integration of the crystals in the existing collimation system: installation of the equipment in IR7, use of existing collimators (as absorbers) and instrumentation (BLMs).  Simultaneous test of horizontal and vertical collimation.  Careful design of dedicated interlocks – and later of collimation system settings and beam conditions – to avoid any possible machine protection concern.  Operation under the control of the Collimation and the Operation Teams. W. Scandale – SPSC

Layout of the LHC installation  2 goniometers with crystals Cables from phase-2 collimators + new optical fibers 1 new support, 1 support from phase-2 collimator  3 absorbers (TCSGs – already installed)  2 Cherenkov detectors (not for installation during LS1) 2 new supports New signal and HV cables New vacuum system cables  7 diamond BLMs (2 for installation during LS1) New cables  Control electronics to be installed in TZ76 W. Scandale – SPSC Courtesy of Jerome Lendaro

LHC collimation performance  Complete tracking simulations of cleaning inefficiencies  important effort to debug, validate and extend the crystal simulation routine in SIXTRACK (accelerator tracking code)  Layout studied in cooperation with the Collimation Team*: Semi-analytical analysis of channeled particle trajectories to identify candidate layouts Evaluation of the cleaning efficiency and the safety margins as a function of different crystal parameters  Chosen layout: Vertical crystal: DCUM 19918, horizontal crystal: DCUM Crystal parameters: bending angle 50 μrad, length 4 mm The simulated beam loss maps show that local cleaning inefficiency is reduced by about 10 times in the dispersion suppressor, with respect to the present system *D. Mirarchi, S. Montesano, S. Redaelli, W. Scandale, A. Taratin, F. Galluccio: FINAL LAYOUT AND EXPECTED CLEANING FOR THE FIRST CRYSTAL-ASSISTED COLLIMATION TEST AT THE LHC, MOPRI110, PAC14. W. Scandale – SPSC

The LHC goniometers W. Scandale – SPSC horizontalvertical crystals Movable beam pipe crystal linear movement angular movement Movable beam pipe section Stepping motor (linear movement) RF contacts Garage position  Alignment of the crystal with respect to incoming particles is critical: 1 μrad accuracy required at 7 TeV, dynamic accuracy of the motion essential to obtain collimation during beam acceleration and  * squeezing.  Design of the goniometers in collaboration with industrial partners: closed-loop piezoelectric angular movement (range: 20 mrad, accuracy 1 µrad) motorized linear axis (60 mm stroke, 5 μm resolution) integrated high-precision alignment system no measured impact on machine impedance during normal LHC operation (movable beam pipe section with RF contacts) quick-plugin on the collimator supports (including all cable connections) Bake out at 110 °C

Performance of the goniometers  Linear motion: 4 guides based on linear roller ceramic bearings special cage (AISI 316L) to guarantee a minimal parasitic angle of 1 μrad/mm elastic support on one guide to allow dilatation during bake-out  Angular motion: piezoelectric rotational stage including a feedback mirror and the crystal holder closed-loop control based on 3 linear interferometric measurements (Attocube FPS3010) From the acceptance tests:  +/- 0.5 μrad accuracy in angular position  2% overshoot well below the specifications  settling time 100 msec W. Scandale – SPSC

Cherenkov proton flux monitor (CpFM) W. Scandale – SPSC  Exploit Cherenkov radiation in fused silica to count deflected particle, measure their time and – with segmentation – beam spot. Fibers bundle 47º end of the bars L-shape radiators PMT

W. Scandale – SPSC CpFM tests  Test in H8 last week confirms data of BTF (analysis ongoing)  Test in SPS due in 2015  CpFM is compatible with LHC requirements (outgassing, radiation resistance, background…)  Ongoing investigations on quartz-metal brazing technology in collaboration with industry L.Burmistrov et al, NSS/MIC proc & NIPD proc  Test at BTF-LNF Measured CpFM charge (normalized on the charge of single p.e.) as a function of BTF calorimeter charge -> 0.6 photo-electrons per incident particles; linear response About 10% resolution on number of incident particles (100) Insertion of the viewport between quartz radiator and fiber bundle decreases the signal by a factor of 2 (brazing of the radiator to the viewport not mandatory) Intensity of light as a function of the particle radiator angle

Coherent interaction studies at H8 W. Scandale – SPSC Channeling P=50÷85 % 1. amorphous 4. Volume Reflection P=95÷97% 6. amorphous 3. dechanneling 5. Volume Capture W. Scandale et al, PRL 98, (2007)  Critical to characterize crystals for SPS or LHC  Details are important for simulations in particle accelerator MonteCarlo approach is fast but needs reliable scaling laws Path integration is reliable but it is too slow for multi-turn Path integration predicted volume reflection 20 years ago MonteCarlo method is used in SIXTRAC the general purpose accelerator tracking code UA9 data have been used to improve reliability of MC routine

Simulations W. Scandale – SPSC D,Mirarchi et al, CRYSCOL MonteCarlo code, MOPRI111, IPAC 2014 High statistics data collected at fixed angle with STF45 crystal Data interpolation to compute probabilities of channeling, volume reflection, dechanneling Data versus simulation results with and without telescope resolution uncertainty  measured and simulation data agreement better that 10 %  more confidence on SIXTRACK predictions for SPS and LHC

Collimation inefficiency in the SPS W. Scandale – SPSC SPS Beam TAL BLM 5 BLM 7 Off-momentum loss from Cry. Protons non absorbed from TAL ~ crystal (BLM 7) LocationCrystal orientation Losses from crystal Losses from TAL Total losses Losses reduction BLM5AM ~7 BLM5CH BLM7AM ~21 BLM7CH SIXTRACK + CRYSCOL simulation results with BLM7 at QF 5-22 BLM 7 displaced in 2013  Beam loss rate at high D x has two contributions: diffractive protons coming from the crystal protons non absorbed in the TAL  Simulations of SIXTRACK + CRYSCOL (upgraded) The two fractions are different at the two D x peaks Data collected in 2012 with low-sensitivity BLM agree with simulation predictions. BLM7 displaced at the second D x peak  BLM7 measured reduction factor ~18 (see slide No.4)  To be confirmed in 2015 with LHC-type BLM QF5-22

Outlook on the future… W. Scandale – SPSC Inclusion of ERC-CoG CRYSBEAM project in UA Charged particle Coherent interactions New phenomena, better measurements, Measurements at H8 and LNF BTF Crystals on Accelerators Collimation, beam scraping, extraction LHC crystal collimation validation Collimation detailed studies on SPS “Forward” physics & Cosmic rays Crystal extraction from SPS and possibly LHC LHC fixed target program (AFTER) New crystal concept

Conceptual layout of CRYSBEAM  Crystal kick about 1 mrad technically feasible.  Detection and timing of deflected/extracted beam at the vacuum/air interface with a detector based on Cherenkov light emission.  Instrumented beam dump in air.  CERN, INFN and UA9 discussed in June 2014 inclusion of ERC-CoG CRYSBEAM within the UA9 collaboration  A new MoU in preparation Crysbeam GOALS  Produce crystals with a large bending angle (a few mrad)  Test them in the North Area  Propose a scenario for the halo extraction in the SPS,  Test and characterize the halo extraction in the SPS  Propose of a scenario for an extraction test in LHC

UA9 requests for 2014 UA9 would like to ask the SPSC support for the following beam requests 20 days in H8 with proton microbeams at 450 GeV (recorded efficiency ~ 0.6) Reserve crystals for LHC (1 strip, 1 QM) Large bending crystal for extraction in the SPS (1 strip, 1 QM) Multi-crystals for multi-reflection (array of 8/10/12) Multi-strip for multi-reflection (array of 8/12/16) Crystal with a 45° edge for focusing Calibration of the Cherenkov detector Calibration of diamond detectors Fast electronics test for coincidence of Cherenkov & Diamond signals Crystal with a cut for enhanced channeling efficiency 7 days with ion (Ar or Pb) beams (recorded efficiency ~0.4) PXR radiation Probability of fragmentation 5 dedicated days in the SPS (24 h runs in storage mode) (recorded efficiency ~ 0.7) 0.5 mm long crystals (optimal at 270 GeV) Multi-crystal and/or multi-strip Test of a Cherenkov detector Test with beam of a goniometer with angular piezo-electric actuator similar to the ones installed in LHC Test of the reduced collimation inefficiency using the BLM 7 in the position close to QT 5-22 Time for tests in LHC will allocated during the collimation LHC-MDs (see LMC minutes of 5 February 2014) W. Scandale – SPSC

UA9 publications in 2013/14  Progress on Cherenkov detectors were presented in various conferences; L.Burmistrov et al, NSS/MIC proc & NIPD proc  Test of multi strip silicon deflectors were reported in Nuclear Instruments and Methods in Physics Research B 338 (2014) 108–111.  Crystal with focusing effect was discussed in Physics Letters B 733 (2014) 366–372.  Mirroring effect of ultra short crystals was shown in Physics Letters B, Volume 734, 27 June 2014, Pages 1-6.  Stochastic deflection of positive particles in silicon crystal was presented in Physics Letters B 731(2014)118–121.  Progress on data analysis and simulations were discussed in four paper submitted to the PAC 2014 (Particle Accelerator Conference in 2014).  A master and a doctoral thesis have been completed in  A PhD and a master thesis are in progress. W. Scandale – SPSC

Acknowledgments The Collimation Team for the fruitful collaboration and the support to the UA9 Collaboration All the teams and the groups who helped to finalize the LHC installation proposal, including: EN/STI, EN/MEF, EN/HE, BE/ABP, TE/VSC, TE/MPE All the groups that supports the UA9 Experiment during data taking activities in SPS and in North Area, in particular: BE/OP, BE/RF Thank you for your attention! W. Scandale – SPSC