Rutherford Appleton Laboratory OEM retrievals with IASI, AMSU and MHS: Remaining Tasks PM3, Telecon 12 November 2014 R.Siddans, D. Gerber (RAL),

Slides:



Advertisements
Similar presentations
Months of the year December January November October February
Advertisements

Status of MODIS Production (C4/C5 Testing) Mike Teague 1/5/06.
April 19, 20003GPP2 report 3GPP2 Steering Committee TSG-A report DRAFT Seoul, Korea April 19, 2000.
Chubaka Producciones Presenta :.
Satellite SST Radiance Assimilation and SST Data Impacts James Cummings Naval Research Laboratory Monterey, CA Sea Surface Temperature Science.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
ECMWF – 1© European Centre for Medium-Range Weather Forecasts Developments in the use of AMSU-A, ATMS and HIRS data at ECMWF Heather Lawrence, first-year.
Rutherford Appleton Laboratory OEM retrievals with IASI, AMSU and MHS PM1 Telecon 9 April 2014 R.Siddans, D. Gerber (RAL),
Rutherford Appleton Laboratory OEM retrievals with IASI, AMSU and MHS: Summary of PM2 PM3, Teleconference 12 November 2014 R.Siddans, D. Gerber.
Assess cloud impact using v6 cloud products Update Task reports with new results + v6 shown here. Update code to include processnig L1 PCs + variable.
Arizona’s Education Transformation Paving the way to excellence!
Slide 1 EUMETSAT Fellow Day, 9 March 2015 Observation Errors for AMSU-A and a first look at the FY-3C MWHS-2 instrument Heather Lawrence, second-year EUMETSAT.
Rutherford Appleton Laboratory Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: FP, 25 April 2014, ESTEC.
IST WP8: Project management Žiga Turk 2nd SciX Review Luxembourg, 17 th Nov IST
S5P Ozone Profile (including Troposphere) verification: RAL Algorithm R.Siddans, G.Miles, B.Latter S5P Verification Workshop, MPIC, Mainz th May.
IASI CH 4 Operational Retrieval Feasibility - Optimal Estimation Method Study Overview + Summary Richard Siddans, Jane Hurley Rutherford Appleton Laboratory.
Local Government Pension Scheme 16 December 2009 PENSION LIAISON OFFICERS’ GROUP (PLOG)
Rutherford Appleton Laboratory Cloud Model for operational Retrievals from MSG SEVIRI PM2, RAL, 17 Feb 2009 Overview of Phase II & Cloud Model Code.
Task 4 - Validation: Progress Meeting 2 R. Siddans, B. Kerridge, Jane Hurley STFC Rutherford Appleton Laboratory.
1 SJVAPCD DRAFT SCHEDULES May 2, Hr OZONE ATTAINMENT DEMONSTRATION PLAN PM10 ATTAINMENT DEMONSTRATION PLAN.
September 2008 SundayMondayTuesdayWednesdayThursdayFridaySaturday
Task 1 Definition of the AMSU+MHS measurement covariance.
Rutherford Appleton Laboratory Cloud Model for operational Retrievals from MSG SEVIRI PM2, RAL, 17 Feb 2009 Non-linear Simulations.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Retrieval of Methane Distributions from IASI
IASI CH 4 Operational Retrieval Feasibility - Optimal Estimation Method Task 1+3: Updates Richard Siddans, Jane Hurley PM2, webex 10 October 2014.
Rutherford Appleton Laboratory Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: Status/ plans R.Siddans.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
SunSatFriThursWedTuesMon January
Rutherford Appleton Laboratory Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: Study Overview R.Siddans.
Radiative transfer in the thermal infrared and the surface source term
HYMN 2nd annual meeting FTIR Introduction/Overview A.K. Petersen, J. Notholt, T. Warneke Hydrogen, Methane and Nitrous oxide: Trend variability, budgets.
Rutherford Appleton Laboratory Requirements Consolidation of the Near-Infrared Channel of the GMES-Sentinel-5 UVNS Instrument: H 2 O retrieval from IASI.
Introducing the INS Master Schedule Wayne Baggett.
Implementation of National Ambient Air Quality Standards Bill Harnett NACAA Fall Meeting September 22, 2009.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
© 2014 RAL Space Study for the joint use of IASI, AMSU and MHS for OEM retrievals of temperature, humidity and ozone D. Gerber 1, R. Siddans 1, T. Hultberg.
NCEP Assessment of ATMS Radiances Andrew Collard 1, John Derber 2 and Russ Treadon 2 1 IMSG at NOAA/NCEP/EMC 2 NOAA/NCEP/EMC 1NPP ATMS SDR Product Review13th.
PSAT/NMSQT  Administered one time per year in October  Highly recommended for Grades 8-11  Must take in Grade 11 to qualify as a National Merit Scholar.
ILC EDMS Selection Committee Progress Report Tom Markiewicz SLAC 29 November 2005.
Methane Retrievals in the Thermal Infrared from IASI AGU Fall Meeting, 14 th -18 th December, San Francisco, USA. Diane.
© Crown copyright Met Office Assimilating infra-red sounder data over land John Eyre for Ed Pavelin Met Office, UK Acknowledgements: Brett Candy DAOS-WG,
Bias analysis and correction for MetOp/AVHRR IR channel using AVHRR-IASI inter-comparison Tiejun Chang and Xiangqian Wu GSICS Joint Research and data Working.
Agenda MC Aug 13.
OEM retrievals with IASI, AMSU and MHS: Final Presentation Summary of Study Findings 5 February 2015 R.Siddans, D. Gerber (RAL),
Distribution Workgroup 24/11/16
Marine Planning: Issues and Considerations
ECMWF/EUMETSAT NWP-SAF Satellite data assimilation Training Course
Cristina Lupu, Niels Bormann, Reima Eresmaa
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
13-block rotation schedule
Teacher Student Data Link Schedule/Deadlines
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
Dorothee Coppens.
LAMAS Working Group December 2013
Validation for TPW (PGE06)
McDonald’s calendar 2007.
Overall Project RAG Status:
Recent Developments in Regional Accounts
The Transformation of A Small Company Into A Golden Legend
Review plan of the nature reporting – update 6
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
Air Resource Specialists, Inc. July 23, 2004
McDonald’s calendar 2007.
2015 January February March April May June July August September
CEOS Work Plan Progress Report
Presentation transcript:

Rutherford Appleton Laboratory OEM retrievals with IASI, AMSU and MHS: Remaining Tasks PM3, Telecon 12 November 2014 R.Siddans, D. Gerber (RAL),

Task 6: Retrievals with one or more missing AMSU channels Task: Results will be analysed with a view to drawing conclusions re performance of Metop-A vs Metop-B and for the MWIR retrievals with/without channel 7 channels 3,7 and 8. Status: CFIs now all acquired Metop A data for 23 March 2010 and 17 Oct 2013 New days processed: Bias/covariance for Metop A based on IR OEM complete All runs as per Task 5 settings (analysis/plotting not yet done) Still to run Met B 17 Oct with/without channels too for control

Metop A bias cf IR OEM – 17 Oct 2013 Metop-B all days Metop-A 17 Oct 2013

Metop A bias cf IR OEM – 23 March 2010 Metop-B all days Metop-A 10 March 2010

Estimation of noise Metop A: 23 March 2010 Metop A: 10 Oct 2013 Metop B: 10 Oct 2013

Remaing / future work Task 4/5/6: Still want to test impact of tightening assumed measurement error in MW windows – e.g. adopt sea noise model also over land Task 7: Final reporting & deliverables Results in hdf files, including statistics Should iterate off-line on precisely what required Further work beyond study Further improve emissivity fitting over desert Assess ozone performance Use relaxed prior constraint Compare to sondes + models (more data processing required) Link to parallel methane OEM study OEM CH4 scheme currently relies on analysis + RTTOV emissivity Use results from MWIR OEM and test impact (op L2 + improved)

Schedule

EventLocationDeliverablesPlanned Date Kick-Off Meeting Teleconferenec e 9 th December 2013 PM 1TeleconferenceReport on Tasks st April 2014 PM 2EUMETSATReport on Tasks th June 2014 PM 3TeleconferenceReport on Tasks th November 2014 Final Presentation EUMETSATFinal Report, Datasets and Presentation 9 December 2014 Meetings / deliverables Current plan: Draft report by end of year. Final meeting in January Final report + deliverables early in new year (January?)