LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team.

Slides:



Advertisements
Similar presentations
Controller Tests Stephen Kaye Controller Test Motivation Testing the controller before the next generation helps to shake out any remaining.
Advertisements

(1) - Camera Electronics - Status and Update on changes since Aug July 07 John Oliver and the Camera Electronics team.
Technical Board, 12 July 2005Børge Svane Nielsen, NBI1 Status of the FMD Børge Svane Nielsen Niels Bohr Institute.
Corner Raft Conceptual Design Corner Raft Conceptual Design Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
L. Greiner 1HFT PXL LBNL F2F – March 14, 2012 STAR HFT The STAR-PXL sensor and electronics Progress report for F2F.
BHEL – Electronics Division, Bangalore
ESODAC Study for a new ESO Detector Array Controller.
TileCal Electronics A Status Report J. Pilcher 17-Sept-1998.
Endcap Muon meeting: UC Davis, Feb , 2005 J. Hauser UCLA 1 TMB and RAT Status Report Outline: Current status of TMB and RAT boards Noise measurements.
Cryostat Assembly 17 September 2008 Martin Nordby, Rafe Schindler, Gary Guiffre, Rick Van Berg.
Lab5 Production Status: Optics and RBX integration Pawel de Barbaro U. of Rochester.
Integration and Test 14 October 2008 Martin Nordby.
SDW2005, juin, Taormina The Corot Space instrument.
Camera Electronics Systems September 2008 Rick Van Berg.
CCD and CCD readout : Engineering diagnostics during development, commissioning and operation Pierre Antilogus C. Juramy, H.Lebbolo, S. Russo, V.Tocut.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Raft Electronics Overview R. Van Berg Electronics Mini-Review.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Monitoring and Configuration R. Van Berg Electronics.
Various Topics Related to FEB Liang Han, Ge Jin University of Science and Technology of China Dec.21,2013.
Upgrade developments in Clermont-Ferrand Romeo Bonnefoy and François Vazeille Tilecal upgrade meeting (CERN, 13 June 2014) ● Handling tools ● Deported.
March 20, 2001M. Garcia-Sciveres - US ATLAS DOE/NSF Review1 M. Garcia-Sciveres LBNL & Module Assembly & Module Assembly WBS Hybrids Hybrids WBS.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
18-Jan-021W. Karpinski System Test Design verification of petals and interconnect boards and control links without detectors a)mechanics b)electrical.
LSST Electronics Review BNL January 25-26, LSST Electronics Review BNL January 25-26, 2012 Electronics Development Plan and Vertical Slice Test (VST)
Thoughts on the RCM and its interfaces… Michael Huffer, SLAC BNL Workshop on Raft Electronics Architecture January , 2012.
Leo Greiner IPHC testing Sensor and infrastructure testing at LBL. Capabilities and Plan.
DES PMG Meeting, January 26, 2007 T. Shaw1 DES PMG Meeting Front End Electronics Status T. Shaw, D. Huffman, M. Kozlovsky, J. Olsen, W. Stuermer (FNAL)
Vacuum - CONTROL SYSTEM 29 June Agenda MSRC design, first ideas and plans – Antonio quiet cooling fans test – Irene some scada SW review - Martin.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Power & Voltage Plan R. Van Berg Electronics Mini-Review.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
1 DAQ for FVTX detector Implementation Mark Prokop Los Alamos National Laboratory.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
LSST Electronics Review – BNL, January LSST Electronics Review BNL January Electronics Development Plan Goals and Plans for
SSD Status Report July SSD Status Report accessible from STAR group documents Pictures Updated documentation.
Camera Body and Mechanisms 16 September 2008 Martin Nordby, Pierre Antilogus, Gordon Bowden.
EUDET JRA3 ECAL and FEE C. de La Taille (LAL-Orsay) EUDET status meeting DESY 10 sep 2006.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
EUDET JRA3 ECAL in 2007 : towards “The EUDET module” C. de La Taille IN2P3/LAL Orsay.
Performance of Programmable Logic Devices (PLDs) in read-out of high speed detectors Jack Fried INSTRUMENTATION DIVISION PLD ? PLD ? Muon Tracker PLD Muon.
D0 PMG 6/15/00 PMG Agenda June 15, 2000  Overview (Tuts) u Detector status u Reportable milestones u Financial status u Summary  Response to DOE review.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
DOE/NSF Review of U.S. ATLAS May 21-23, 2003 CSC Mechanics and Electronics Paul O’Connor Tom Muller BNL May 22, 2003.
14-Oct-20081Camera Review - SLAC Camera Electronics - John Oliver - Contributors to Camera Electronics conceptual design BNL – Veljko Radeka,
LIGO-G9900XX-00-M LIGO II1 Why are we here and what are we trying to accomplish? The existing system of cross connects based on terminal blocks and discrete.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
March 25, FVTX Monthly/Quarterly Report June, 2009 Technical Status, Cost & Schedule Melynda Brooks, LANL.
Single Board Controller Comments Roger Smith Caltech
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
Cloudland Instruments Hawkeye Electronics Snapshot March 10th, 2016.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
1 FVTX Quarterly/Monthly Report July 2008 Melynda Brooks, Dave Lee.
On detector electronics: High voltage part Tilecal session in ATLAS upgrade week (Tuesday 10 November 2009) François Vazeille  What are the constraints.
ELENA installation progress F. Butin / ELENA collaboration.
A.Ryazantsev, IHEP-Protvino, RussiaPANDA Russia Workshop at Moscow, May 2015 Status on Barrel Mechanics Andrey Ryazantsev on behalf of the IHEP-Protvino.
EUDET Extended SC SiW Ecal 1 SiW Ecal EUDET Module - General Schedule - Development of Different Components - (Towards) a working prototype Roman.
MOBILE CAMERA CONTROL SYSTEM. Team Members Ruth Ayalon – ME Ruth Ayalon – ME Erin Gillespie -ME Erin Gillespie -ME Claudia Forero –ISE Claudia Forero.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Chris Booth Sheffield 29th March 2006
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Detector building Notes of our discussion
FTK infrastructure in USA15 Status and plans for 2015 A
Calorimeter Mu2e Development electronics Front-end Review
Technical Design for the Mu3e Detector
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
LSST Commissioning Overview and Data Plan Charles (Chuck) Claver Beth Willman LSST System Scientist LSST Deputy Director SAC Meeting.
Mini-drawers, FE-ASIC , Integrator
LSST Camera Readout chip
LSST Camera Detector Status
Instrument Overview Larry Springer HMI Program Manager
Presentation transcript:

LSST Camera Electronics Overview September 16, 2008 R. Van Berg for the LSST Electronics Team

LSST Camera2 Outline Current plan and schedule for delivery to the Integration and Test phase Key technical milestones Key technical development activities Test requirements/equipment at each phase Task interdependencies with other subsystems Electronics system self-protection plans and features

LSST Camera3 Current plan and schedule for delivery to I&T Work in progress……

LSST Camera4 Current plan and schedule for delivery to I&T Still in progress….

LSST Camera5 Schedule Cheat Sheet Three “phases” of development –Early prototype (e.g. discrete FEB, single channel SCC) –Prototype (e.g. 8 channel ASPIC, 24 channel FEB) –Pre-production (e.g. nominally final design) Where we are now Where we need to be end of 2010 CCD Related Milestones: Proto or Preprod FEBs (1/3 raft) to BNL March (?) 2010 Production FEBs to BNL end of October 2011 Last FEB/BEB to BNL by March 2013

LSST Camera6 Key technical milestones ASIC development: –ASPIC – noise, power, crosstalk –SCC – power, clock drive Front End Board –Crosstalk, thermal management, mechanical interfaces Back End Board –Power, density (e.g. connectors) Back End Controller –Power, density, high speed I/O Infrastructure –Power, cabling, cooling, space/mechanics in UT Controllers –TCM, Fiber interface, other controllers… Corner Rafts –Guider choice, space, space, space Integration –Real CCD readout at real LSST rates

LSST Camera7 Key technical development activities ASIC development – –ASPIC Strong IN2P3 Group (LAL Orsay and LPHNE Paris) with some collaboration from Harvard and Penn First version satisfies crosstalk requirement already, not quite on noise (understood) Second version in design – review Oct. 6-8, Boston –SCC Strong ORNL/UT group First version (single channel of clock and bias) tests ok Second version (full specification) in design – intend to submit in Dec. 08 Board development – –FEB – BEB version 1 Discrete, non-compact 2 channel design demonstrated digitization performance (microVolts) at the level required for LSST –FEB – BEB version 2 Utilize prototype ASPIC / SCC devices, 8 channels (one CCD) – end of this year –FEB – BEB version 3 To use version 2 ASPIC and SCC, full density (24 channels) raft prototypes

LSST Camera8 Key technical development activities - II Cabling – –Inside Cryostat Kapton CCD  FEB, capacitance, flexibility, connectors Kapton FEB  BEB, flexibility, space “Standard” cable RCM  Flange, routing, space, performance –Outside Cryostat (mostly in Utility Trunk) Harness design, routing, maintenance Power – –Conditioning at entry to UT –AC  DC conversion Space, noise, reliability, repairability –DC  DC conversion Space, noise, reliability, repairability

LSST Camera9 Test requirements/equipment at each phase Early Prototype Phase – –Point test tools and equipment not yet integrated with CCS or BNL CCD test tools or much of anything else – standard lab equipment Prototype Phase – –Incorporate CCS tools as they become available (especially the SDS for data output) – lab equipment plus LSST specific test objects (e.g. CCD simulators) plus real CCD signals. Pre-Production Phase – –Full suite of CCS tools (control / monitor plus data flow) –Full raft / tower mechanical and cooling structures working with raft level CCD metrology and optical test

LSST Camera10 Task interdependencies with other subsystems Electronics CCDs Cryostat Mechanics Cryostat Thermal SDS (Data Management) CCS Control

LSST Camera11 Task interdependencies with other subsystems Electronics is driven by CCD (and science) requirements –Noise –Cross talk –Stray capacitance –Speed –CCD clock and bias specifications –Cleanliness (e.g. no outgassing of black gook) Electronics has to be compatible with: –Data Management -- high speed data output –Camera Control System – control registers, programming model –Cryostat mechanics – space, cabling, assembly and repair seq. –Cryostat thermal – magnitude of heat load, uniformity of load, heat flow

LSST Camera12 Electronics system self-protection plans and features Obvious dangers are: –Overvoltage – regulators to have clamps or OVP –Overcurrent – regulators to be current limited –Overheating – loss of cooling needs to cut power to electronics – this is a danger to the camera not really to the electronics (electronics fine at >100C) – an example of a cross task boundary problem – What are the non-obvious dangers we need to protect against?