Paper Machines Stock Prep Class 2 P&ID’s Blend Chests Through Machine Chests.

Slides:



Advertisements
Similar presentations
ODOT BULK FUEL MAINTENANCE PLAN WHAT TO EXPECT THE DAY THE VENDOR TAKES A SAMPLE.
Advertisements

PRESENTATION FOR CWEA TRAINING Keys to Successful Pipeline/Infrastructure Projects Pipeline Flow Diversion Presented by: Tom Epperson, PE, Tetra Tech.
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
BeginningNext SlideBack End Program AVADAL 1 of 21 SK-1 Roller Apron Segment Overview.
Engineer Training XL1200 Ink System. Engineer Training XL1200 Ink System Confidential 2 Ink System The XL1200 Ink System consists of the following elements:
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
Unit 7.2. Respirator fit testing TB Infection Control Training for Managers at National and Subnational Level.
Growing Fish in a Recirculating System: Advanced Teacher’s Workshop An Inexpensive Recirculating System Blan Page & PJ Waters.
City of Black Hawk Water HammerSeptember 2002 Arber Water Hammer Travis Meyer, P.E. Richard P. Arber Associates.
Compressed Gas Cylinder Training Subject to damage from other activities in the vicinity Cylinder laying in a horizontal position Electrical cord in.
Caged Tanks for Pesticides: Terminology, EPA Regulations and Pesticide Labels Rinsing and Recycling Caged Tanks Nancy Fitz Chemical Engineer U.S. EPA Office.
1. The installations of grinder pumps and lines from residences on private property to M.D. collection lines is the final link in finishing a project.
CIMExcel Software Inc. Slide 1 Advanced Drystock Control (ADC) to reduce the ‘residual’ basis weight, moisture, and caliper profiles CIMExcel Software.
HEIS INSTALLATION PROCESS 1. DEMARCATION IN FIELD 2.
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
Dennis Sabre Fire Appliances
The Piping and Instrumentation Diagram Schematic of a control system –more detailed than process flow diagram –does not include values of parameters Used.
Chapter 11 Simulating Wireless Control. Simulate Parameter – Analog Input Block  The current or digital outputs of these transmitters and switches are.
How to draw a cube using isometric paper.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
Covering Your Textbook. Procure full size paper bag from Kroger, Food Lion, Martin’s, etc.
1 CTC 450 Review Water Quality Water Quality. 2 CTC 450 Water Distribution Systems Water Distribution Systems.
FSRUG Presentation – January 2014 Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 3 Reactor Feed Water (FW) Clean Up Piping Break.
Placing Vapor Distribution Systems and Appliances into Operation MODULE 8 System Tests.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
March 9, 2011 Report on Construct & Equip Wells (Moniter, 6400 South, 1330 East)
P&ID’s PIPING & INSTRUMENTATION DIAGRAMS.
Quadna Field Installation Expert Field Installation Including Start-up and Commissioning Field Service Quadna Field Installation Expert Field Installation.
Model 2537A Training Course Detailed Instrument Description Rev: Nov
ComColor Ink passage Mechanism (Revised version)
1 NSTX Outage - Plan 1. 2 NSTX Outage – Diagnostic considerations 2 1.Erik Perry will be the manager of the construction activities in the Test Cell.
Toolbox Talk 2016 Struck by an Object.
Raw Water System Flush By introducing fresh water into the cooling system, growth of sea life is reduced or eliminated keeping the raw water cooling pipes.
Heat Pumps In a heat engine, heat is converted to mechanical energy by taking advantage of the fact that heat flows from hot to cold. The heat is taken.
Maintenance Training Series INDUSTRIAL HYDRAULICS A training program designed for individuals who want a comprehensive study of industrial hydraulics.
NSTX Upgrade Test Cell Initial Schedule Vent vacuum vessel by 9/19 No vessel entry at this time Period of removals prior to start of outage: 9/19 – 10/14.
Optimization of Fiber Properties Using Single Pass Refining v/s Recirculation- A Case Study.
Status of the ATLAS ID Evaporative cooling system JCOV 25 Nov P. Bonneau TS/CV/Detector Cooling CONTENTS Overall statusOverall status Cooling plant.
Building 180 NORMATEF TEST FACILITY Demineralized cooling water station upgrade R. Bozzi / EN-CV.
Pulp Mill Operator Training Class 3
Pulp Mill Operator Training Class 4. Review Refiner Feed Tank 05-PF Screen Feed Tank 05-PF Washer stock and showers 05-PF Washer.
CSE 425: Industrial Process Control 1. About the course Lect.TuTotal Semester work 80Final 125Total Grading Scheme Course webpage:
Stock Prep Summary Stock Prep (HD – Machines) – Phase 1: Secondary refiners to series operation and recirculation Piping, tie ins, order of preparation,
Stock Prep Class 3. Today Review No text books or theory P&ID’s for Waste system, #3pm Ticklers, Rejects system, 4 th stage cleaners 3D model Phases of.
INGAA Quality Management Systems White Paper Supporting Pipeline Construction.
An Update on Consistency Transmitter Measurement Technology & Process Considerations Mike Hendricks Applications Manager BTG Americas Inc.
Poultry Equipment Used On Broiler Farms Ag. Ed. Computer Workshop June 27, 2002 Pictures and Program Prepared by John Sutton Georgia Agriculture Education.
ROLL NO.ENROLLMENT NO.NAME MAKVANA DISHA R. GUIDED BY : PROF. R. JADAV.
Anhydrous Ammonia Storage and Handling Original Power Point Created by Brandon Ritter Modified by Georgia Agricultural Education Curriculum Office June.
Fun with Paper Hosted by Seri Lesson 18. Folding a silver bell.
Filing the FCC Form 471 E-rate Program Applicant Training
Turnkey Capabilities.
10 12 and 14 TR Advanced Glycol Chiller
INDUSTRIAL TROUBLESHOOTING Chapter 10
ERT 213 INTRODUCTION TO PROCESS INSTRUMENTATION
Athletic Training Facilities
MDX-R3 INSTALLATION PROCESS NON-ADJUSTABLE CONCRETE POOLS
HIGH PERFORMANCE PRESSURE SYSTEMS.
B.V.Patel Institute of Technology-Diploma studies
Activities at PPT Related to Fluid Dynamics – A Short Review
Test #3; Symbology; Process Diagrams – Part 1 - Agenda
Pump House wall before installation.
A practical approach for process control optimization during start-up
CHAPTER 2 Description of Chemical Processes
Spoken Word Poetry continues…
Key green = pipe flow > 240L/s up to 360L/s
STOCK PREPARATION.
Any path along which electrons can flow is a circuit.
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

Paper Machines Stock Prep Class 2 P&ID’s Blend Chests Through Machine Chests

Today Review Stock Prep Theory P&ID’s for Blend chests, Ticklers, Machine Chests (both Machines) 3D model Phases of installation

Review Recirculation Refining – Flow control – HP control – Level control – HPD/T control – Consistency control – VFD feed pump – Our refiners – What ties it all together. What develops the stock.

GP Papermaking 2002 Class The following is stock prep standard practices Pasted from training document Industry standards, Textbook standards, Audit results from other mills Think and Talk through your equipment: stock prep, tanks,

P&ID Notes P= pressure, L=Level, T=Temperature, F=Flow, J=Power/Hp, N=consistency, _T = _ transmitter PT=pressure transmitter _I = _ indicator LI = Level indicator _IC = Controller LIC=Level Controller _V = _valve FV= flow control valve Dotted lines connect you from control points to the valve or whatever is controlling it

P&IDs We covered LD to the Blend Chest in last class (any questions or review?) #1pm Blend Chest (21-PF ) #1pm Ticklers (21-PF ) #1pm Machine Chest (21-PF ) #3pm Blend Chest (23-PF ) #3pm Ticklers (23-PF ) #3pm Machine chest (23-PF )

3D Modeling

Phases Stock Approach (HD – Machines) – Phase 1: Secondary refiners to series (June) – Phase 2: #3pm new machine chest online (August) – Phase 3: #1pm new blend and machine chests online (September) – Remainder is in final outage

Review What Feeds the Blend Chest? #1pm, #3pm

Review What Feeds the Blend Chest? #1pm – #3, #1 refiners (PM1 refiner line) – Broke from 15 ton broke chest pump – Recycle (piping/valves but we don’t plan to put it there except when it is unrefined)

Review What Feeds the Blend Chest? #3pm – #1, #2 DD refiners (PM3 refiner feed line A) – #2, #9 refiners (PM3 refiner line B) – Broke from 15 ton broke chest pump – Recycle (piping/valves but we don’t plan to put it there except when it is unrefined)

Review What is different about your ticklers?

Review What is different about your ticklers? – Stock will go to #6 first then to #5 – Recirc piping and control – #3pm plans to only use #7, #8 – You have a tank after them (no rush like today, you have time to valve) – Operate lower consistency – They will not have recycle in the ticklers. It is all broke (broke has recycle) and virgin

Review Why do we put recycle in the Machine Chest? Is that Good or Bad?

Review Why do we put recycle in the Machine Chest? – So it will not be damaged by the tickler refiners

Review Why do we put recycle in the Machine Chest? Is that Good or Bad?

Review Why do we put recycle in the Machine Chest? Is that Good or Bad? – It is not correct- you shouldn’t blend in the Machine Chest – You shouldn’t control consistency in the Machine Chest (it should already be stable, a control valve may swing it more) – But we do not want to damage long softwood fibers. If we are able to not use much Tickler HP then we may choose to put recycle in the Blend Chest. This will come through trials

Review What is the goal of Stock Prep?

Review What is the goal of Stock Prep?

Review What will we see next in construction / startup? – Installing piles for new #3pm Machine Chest That will become base/ concrete, then tank building – Valve out River Side Tile Tank Catwalks, structure, access, move equipment, build a floor, tile work, new agitator for bottom, modify top agitator – Phase 1 piping where you get #3,#1 refiners piped together and recirced, and #2,#9 refiners piped together and recirced (JUNE)