European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015.

Slides:



Advertisements
Similar presentations
Experience with an IT Asset Management System
Advertisements

ATC Conference Call January 10, 2008 Thank you for joining the call. We will start the call shortly. Please enter * 6 to mute your line and # 6 to unmute.
Electronic Systems Support LV PS Procurement - Status February 28, 2005.
Skyward Server Management Options Mike Bianco. Agenda: Managed Services Overview OpenEdge Management / OpenEdge Explorer OpenEdge Managed Demo.
FESA 3 Implementation Status Stephane Deghaye BE/CO On behalf of the FESA team and many users.
TALOS Total ATM Life-cycle operational Solution. The Cost equation Life cycle costs are high Life cycle costs are complex Life cycle costs involve all.
LabVIEW Basic I with RADE introduction A. Raimondo (EN/ICE)
European Organization for Nuclear Research PLC services Jerónimo Ortolá, Jacky Brahy EN-ICE Workshop 23 April 2009.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
STTC 20/08/2002 Eva Sánchez-Corral 1 ST Division W2000 Migration status report Organisation and Management Strategy and Planning Review of experience Status.
Isabelle Laugier, AT/VAC/ICM Section February 7 th 2008.
Tripwire Enterprise Server – Getting Started Doreen Meyer and Vincent Fox UC Davis, Information and Education Technology June 6, 2006.
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
LCG Milestones for Deployment, Fabric, & Grid Technology Ian Bird LCG Deployment Area Manager PEB 3-Dec-2002.
Current Job Components Information Technology Department Network Systems Administration Telecommunications Database Design and Administration.
U.S. Department of Agriculture eGovernment Program July 23, 2003 eAuthentication Initiative Agency Responsibilities and Funding Discussion eGovernment.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
Barriere O, Le Roux P
CERN Accelerators Topology Configuration and Change Management Engineering Department Thomas Birtwistle, Samy Chemli – EN/MEF/DC.
Supporting Services in Schools ICT Service Level Agreement Howard Lazarus - ICT Support Manager Martin Morgans - Datacentre Manager.
© Siemens AG All rights reserved. openlab III Board of Sponsors 3-4 May 2011 at CERN Joint Report Siemens - CERN.
Ethernet IP solution for ATLAS IBL and CMS Pixel detectors CO 2 cooling plants Lukasz Zwalinski PH/DT/DI.
การนำระบบไปใช้ Implementation อ.พัฒนพงษ์ โพธิปัสสา.
* Critical in the sense of fast intervention SIEMENS – CERN EN/ICE annual meeting Nuremberg, December the 13 th 2012 Industrial Controls Engineering Department.
LHC Database Developers ’ Workshop (2D) January 24 – , CERN.
Scott Butson District Technology Manager. Provide professional to all district staff Professional development has been provided on a regular basis to.
GloCARE A Unified Customer Service Solution for Gloco Team5® Lillian Lee Eric Miller Gabriele Fariello Mark Legere GloCARE for Gloco by Team5 1.
20th September 2004ALICE DCS Meeting1 Overview FW News PVSS News PVSS Scaling Up News Front-end News Questions.
Status and first objectives 14/06/2012Jean-Christophe Garnier1.
INFSO-RI NA2 Status Update ETICS2 third AHM Isabel Matranga Engineering Ingegneria Informatica SpA Budapest, June 2009.
Corporate Technical Infrastructure Management From MP5 to a Corporate Technical Infrastructure Management System.
LCG Generator Meeting, December 11 th 2003 Introduction to the LCG Generator Monthly Meeting.
1 UNICOS PVSS Evolution Cryogenics Control Enrique BLANCO Industrial Controls & Electronics Group.
Management Tools K. Pommès. Management Tools - The Project Planning Design Purchasing Production Installation To follow the project through its phases.
Chiller control system Specification meeting Lukasz Zwalinski – PH/DT.
12/8/2015PLC Software Configuration WG - CCB1 PLC Software Configuration WG Members Philippe Gayet Fréderic Havart Renaud Barillère [Mathias Dutour]
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
The Building 180 Cryogenic infrastructure water cooling system Stefano Moccia, EN-CV Coordination meeting 26/09/14.
CERN General Infrastructure Services Department CERN GS Department CH-1211 Geneva 23 Switzerland Db Futures Workshop
UNICOS Roadmap 2015 Enrique Blanco On behalf of the UNICOS team EN-ICE 1 March 2015 CERN March 27, 2015 GSI - CERN Collaboration.
State of Georgia Release Management Training
Electronic Design Change Process Paul Tobin Jr.- PKMJ Technical Services.
European Organization for Nuclear Research DCS remote control in NA62: Equipment & Control Integration. Mathias Dutour NA62 Collaboration 9th December.
Feedbacks from EN/STI A. Masi On behalf of EN-STI Mathieu Donze` Odd Oyvind Andreassen Adriaan Rijllart Paul Peronnard Salvatore Danzeca Mario Di Castro.
Industrial Control Engineering Infrastructure: EN/ICE needs Wrap up Mandate: WG Infrastructure to establish the needs for an ICE server pool and study.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
CERN - IT Department CH-1211 Genève 23 Switzerland t Operating systems and Information Services OIS Proposed Drupal Service Definition IT-OIS.
TE-MPE-EM: Subcontracting Raphaël Berberat
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Federal Acquisition Service 4 th Annual Government Transportation Forum TransPort Integrator Overview.
ITEC 275 Computer Networks – Switching, Routing, and WANs Week 12 Chapter 14 Robert D’Andrea Some slides provide by Priscilla Oppenheimer and used with.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
CV works in the non- LHC accelerator complex during 2008 and plans for 2009 ATOP days 2009.
Vacuum Controls framework for the LHC and its injectors Sebastien Blanchard CERN TE-VSC Integration of controllers in SCADA using OPC Server Goal: Improve.
1 Determining a client’s peripheral requirements  Determine current business practices  Determine peripheral requirements  Analyse and document existing.
ITEC 275 Computer Networks – Switching, Routing, and WANs
Digital Campus: Foundation Projects
UNICOS Application Builder Architecture
CV PVSS project architecture
Maintenance Ticketing Gateway (MTG) CEMR/MEDIACC Replacement
Database Services at CERN Status Update
Service presentation Problem: Modifying systems in production is risky
UCPC RP Presentation for GSI
Olof Bärring LCG-LHCC Review, 22nd September 2008
Common components for OPC-UA developments at CERN: An enhanced OPC-UA toolkit Ben Farnham.
Low temperature chiller Market Survey
GUAPI working group meeting June 26th 2013
Experience with an IT Asset Management System
Progress on Standardization
PSS0 Configuration Management,
Presentation transcript:

European Organization for Nuclear Research Industrial Controls Engineering Department GUAPI working group meeting May the 6th 2015

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department AGENDA EN/ICE report. Report from Schneider. Report from Siemens. VersionDog. Service proposal presentation. Presentation from users. “Introduction to the Vacuum Controls framework for the LHC and its injectors” by S. Blanchard.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department EN/ICE Report Market survey for a new contract on PLC suppliers to be started this year. Siemens support cancelled via as of January Use or Siemens web interface. Automation seminar about “Specification-based test case generation”. Internal TIA Portal seminar. Possible training needs at CERN. Migration document available. TIA portal in CMF cancelled due to major constraints. Old equipment give-away campaign successful.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department EN/ICE Report UNICOS: UNICOS CPC version for S (light) and S in preparation. (TIA Portal openness used). Schneider Magelis touch panels available. Reverse engineering tool in preparation. Time synchronisation problem introduced by EN/ICE in all UNICOS applications detected and fixed.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department Report from Siemens Technical contact replaced. (Patrick Leidi) New contact: Michel Avondet Commercial contact not available. Waiting for replacement. No annual meeting in Germany organised in Foreseen for summer Strong collaboration with the development department to report TIA Portal issues. TIA Portal V13 SP1 released and stability improved. Ready to use. Strong collaboration on the improvement of the Linux softnet libraries (PLC agent, TSSP OPC UA wrapper). S7 300 Serial CP not compatible with S71500 CPUs.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department Report from Siemens S7 400 CPU hardware version 6 failure. Cause: Communication ASIC (application-specific integrated circuit). Sensitive memory to bit flip event. Solution: New firmware in June Hardware affected : All CPUs S7 400 and S7 400H HW Version 6. 6ES HM06-0AB0 No impact on redundant switch over mechanism.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department Report from Siemens CERN solution Return impacted CPUs. Credit note. Free exchange of impacted CPUs by CPUs HW Version 5. Wait until next firmware version. Siemens referenceProductTypeUNITSIn ProductionSparesPurchaser nameApplication Contact Person Comments 6ES7412-2EK06-0AB0StandardCPU 412-2PN14 EN/CV CV EDG. RaimondiCPUs to be returned. No replacement 6ES7416-5HS06-0AB0H-SystemCPU 416-5H22 TE/EPC SVC BEQ2J.M. de Paco Soto CPUs not to be returned. Waiting for Firmware new version 6ES7414-5HM06-0AB0H-SystemCPU 414-5H1 1 EN/CVHVAC_PSH. JenaCPUs to be returned. To be replaced by V5 6ES7414-5HM06-0AB0H-SystemCPU 414-5H22 EN/CVHVAC_PSH. JenaCPUs to be returned. To be replaced by V5 6ES7414-5HM06-0AB0H-SystemCPU 414-5H422GS/ASE Access ControlF. HavartNo reply 6ES7417-5HT06-0AB0 H-SystemCPU 417-5H633 F. Havart B. Morand PS Access System (PASS) F. Havart B.MorandCEGELEC 6ES7414-5HM06-0AB0 H-SystemCPU 414-5H13103 F. Havart B. Morand PS Access System (PASS) F. Havart B.MorandCEGELEC

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department VersionDog. Service proposal The problem: Updating applications in production goes sometimes out of control. Many people involved. Lack of methodology or discipline to apply it. Existing tools based on local databases: e.g. PARADIS. VersionDog. Automated Back-up and version control.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department VersionDog. Timeline TE/ABT proposal in Oct AutoSave. Market survey. MDT’s AutoSave and Auvesys’ VersionDog. Evaluation of both tools in VersionDog selected in September Purchase procedure started in November Price negotiations between CERN procurement and Auvesy started in January Price agreement in April Purchase request to be sent before 25 th of May. Service foreseen operational for July 2015.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department VersionDog. Infrastructure

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department VersionDog. Service proposal Automated back-up, comparison and versioning of applications in production ONLY. Common infrastructure CERN-wide. 2 Servers (ensure availability) + Agents maintained by EN/ICE. Main Administration done by EN/ICE. Local administrators for each group with special permissions. Every group manages independently its own components and jobs (back-up and compare). Capacity: 2000 back-ups and 6000 components (PLC or Touch Panel projects). It can be extended depending on the needs.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department VersionDog. Service proposal Initial license fee and annual license fee in charge of EN/ICE. Users contribution to initial fee cancelled provided DR accepted. Service usage regulation depending on the amount of components.

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department VersionDog. Usage EN/ICE gives admin rights to one person from every group of users. Every administrator manages The registration of the device in the VersionDog database. The users of his group. (e-groups) The jobs configuration schedule. (back-up and compare). The users: Can manage projects concerning the device Can Execute compare and back-up. Need to install the VersionDog Client (web client available soon).

GUAPI Meeting May 6th 2015 Industrial Controls Engineering Department VersionDog. Users involved Confirmed users: TE/ABT (P. Van Trappen) EN/STI (A. Masi) TE/MPE (M. Zerlauth) TE/VSC (P. Gomes) BE/RF (L. Arnaudon) EN/ICE Not interested: TE/EPC (M. Dudek) DGS/RP (G. Michet) They might be interested in the future. Very interested but not yet confirmed: EN/CV (R. Barillere) TE/CRG (M. Pezzeti) GS/ASE (F. Havart) No reply: BE/BI (G. Focker)