P ART A - S TANDARDS 2016. A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4.

Slides:



Advertisements
Similar presentations
ODOT Structure Project Manager Seminar Specifications
Advertisements

Workmanship and Tests During Construction Phase Presented by: Er. Bhagawan Shrestha.
DISTRICT FIVE CONSTRUCTION CONTRACT ADMINISTRATION UPDATE TRAINING Submission of Working Schedule Specification SP A.
Capital Improvement Plan Financial Options September 12, 2013 Presented by: City Administration Finance Department.
11 Grant Park Sewer Rehabilitation Project BES Project #E10346 Bid # SCOPE: Rehabilitation, Replacement, or Relocation of Sanitary & Combined Sewers,
Supplemental Specification 802: Constructing and Inspecting Pipe Culverts, Sewers, Drains and Drainage Structures Ted Strickland, Governor Jolene Molitoris,
2013 C&MS Section 500- Structures Changes from 2010 to 2013 Construction and Materials Specifications in Structures Items.
Oklahoma Department of Transportation Susan McClune Regulatory Services.
Supervision and Administration
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Dillon and Christina Project Area Lander Streets and Utilities 2015 Public Meeting No. 2.
Public Information Meeting #6 City of Fargo Flood Risk Reduction Projects Rose Creek Coulee October 9, 2012.
Timely Payment Task Force Conaway Conference 2015 Chris Engle, Director of Public Agencies, Ohio Contractors Association Gary Angles, Administrator Office.
CONSTRUCTION ADMINISTRATION Preconstruction Operations Dr. Alaattin Kanoğlu Spring, 2013 Professional Practice Management I.B.U. Architecture Undergraduate.
DPW General Conditions Articles 32 through 37. Articles Covered Today  32 Owner’s Right to Withhold Payment  33 Owner’s Right to Stop Work and Terminate.
OCR Payment Process Training 01/17/2012. Article 9 – Compensation and Payment General Conditions – Article 9 – 9.1 Preconstruction Stage Compensation.
Marcy Mealy Procurement Specialist CDBG Program
On-Call Signal Contract Options for Discussion March 13, 2015 Cape Cod Joint Transportation Committee.
Acquisition of partial interest EASEMENTS. Does USPAP require a definition of the rights being appraised? Std Rule 1-2(e) Identify the characteristics.
Construction Contract Administration (ENGC 6363) ( FIDIC Chapter 15) EMPLOYER BY TERMINATION Presented by: Mustafa Al tayeb.
ISLAMIC UNIVERSITY OF GAZA FACULTY OF ENGINEERING CIVIL ENGINEERING DEPARTMENT Defects Liability [Construction Contract Administration] Chapter 11.
2015 MASS Re-Issue Changes-Division 50. MASS’s many hats Capital Projects Private Development Private Systems Outside communities Agency Use - ADEC PM&E.
Discussion Topics Construction Contract Administration Lessons Learned Other Construction Issues Questions? / Comments (Anytime)
2015 Traffic Signals 101 Topic 12 Special Provisions.
You Should Know Bulletin No. 135 © ACPA All Rights Reserved.
1 August 12, 2014 Surety Risk Assessment Utility Pipeline Failure Case History – Tyndall, SD Presented by: American Concrete Pipe Association Scott Hofer.
Public Hearing August 30, 2014 Drive-Way Ordinance Please Sign in…
General Conditions of the Contract for Construction Articles 19 through 24 October 6, 2008.
Jeff Shelley, P.E. Project Delivery Team Leader FHWA, Alabama Division 9500 Wynlakes Place Montgomery, AL (334) Fax: (334) Mail.
Encouraging Diversity Growth & Equity 123: Demonstration of Good Faith Todd McGonigle EDGE Program Manager Phone (614) FAX (614)
Project Diary Missouri Local Programs How to Develop and Use the Daily Diary and Payment Diary for LPA Inspectors.
S10 CONS5Q25 Lara Tookey. Review of estimators workings Decision on what margin to apply Bid submission details Submit your Tender.
Kenneth D. Fenton P.S. Clark County Engineer’s Office.
CONSTRUCTION CONTRACTS – MASTER CHART
Florida Department of TRANSPORTATION FLORIDA DEPARTMENT OF TRANSPORTATION THIRD PARTY DAMAGES Rudy Powell, P.E., State Construction Engineer 2014 FTBA.
CONSTRUCTION CONTRACTS DOCUEMENTS
MARCH 9, 2006 Boating Safety and Enforcement Grant Program Regulations Stakeholder Workshop Proposed Conceptual Regulations Department of Boating and Waterways.
7 Plant, Materials and Workmanship. 7.1Manner of Execution The Contractor shall carry out the manufacture of Plant, the production and manufacture of.
Measurement and Payment Module #5 Prepared by Dr. Randy R. Rapp July 2005.
CHANGE WORK ORDER A change work order may be issued by implementing official any increase or decrease in quantities of original work items in the contract.
PUBLIC INPUT SESSION OCTOBER 27, 2015 City of Asbury Sun Valley Dr. and Sun Ridge Ct. Reconstruction Project.
American Recovery and Reinvestment Act of 2009 Energy Efficiency and Conservation Block Grant Program Small City and County Grant Kick-Off Meeting California.
PUBLIC INPUT SESSION NOVEMBER 10, 2015 City of Asbury Birchwood Drive Reconstruction Project.
Contract Specifications Written Set of standards and procedures informing the contractors or remediation professionals of materials & operation necessary.
Stacy Hagenbucher.  Process Improvements  Clarification  Trends  Finals Tracking  Trends  Why Missing Dates  Additional Resource  Issues on sites.
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
WEDGEWOOD COVE HOA STREET PAVING/RESURFACING PROJECT.
Change Orders, Extras and Claims Presented by Geoffrey Cantello, City of Ottawa.
Town of Oro Valley Oro Valley Stormwater Utility Commission Overview.
Table Discussions 2015 SE Meeting. Scenario #1-Project Completion A $1 million bridge replacement project has a completion date of August 1 th. This date.
1 Risk Management Bonding & Insurance Jimmy Porter Risk Analyst City of Atlanta.
Introduction to Procurement for Public Housing Authorities Getting Started: Basic Administrative Requirements Unit 1.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
CONDUCTING BUSINESS WITH THE TOWN OF MIAMI LAKES Construction Services October 28, 2013.
MnDOT AUDIT 2016 COUNTY HIGHWAY ACCOUNTANTS CONFERENCE ANNUAL FEDERAL CITY COUNTY AUDIT DISCUSSION.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
CITY OF BELLEVILLE ROAD IMPROVEMENTS PROGRAM
City of Dayton Department of Planning & Community Development
Agenda Updates to Driveway and Sidewalk specifications and permits
CONTRACT ADMINISTRATION
City of San Jacinto 7th Street Pavement Repairs
Administration of a FIDIC Contract - Project Control
* Topic 12 Special Provisions
Navigating FDOT Specifications and Standards
Municipal Land Use Law C.40:55D-53 - NEW DEVELOPER
Prime Contractor Performance
Construction Considerations
Directed Change Constructive Change
ACEC Designer Training
Presentation transcript:

P ART A - S TANDARDS 2016

A NNUAL ‘A’ B OOK R EVIEW  Conducted by City of Toledo -Division of Engineering Services  Review Typically performed in Q4  Final ‘A’ Book Uploaded to City of Toledo Website in Q1 of 2016 for Contractor Reference.

Coordination of the Contract Documents ORDER OF PRECEDENCE: 1. Addenda. 2. Part B – Bid Book. 3. Plans. 4. Part A – Standards 5. City of Toledo Standard Construction Drawings. 6. Ohio Department of Transportation, Supplemental Specifications. 7. Ohio Department of Transportation, Construction and Material Specifications. 8. Ohio Department of Transportation, Standard Drawings

2016 CHANGES OVERVIEW C.8.a G P H A B C

100 – GENERAL ROVISIONS 107 – Legal Relations and Responsibility to Public 108 – Prosecution and Progress 109 – Acceptance, Measurement and Payment

107: LEGAL RELATIONS AND RESPONSIBILITY TO PUBLIC  Item Protection & Restoration of Property

Standard A 2016: Add after the first paragraph- The Contractor, where possible, shall limit access to the bare minimum to reduce construction dirt and debris and to protect both public and private property. All trees and shrubs not specifically shown to be removed shall be protected at the Contractors expense. In addition, the contractor shall not park any vehicles or store equipment or materials in the grass area within the drip line of any trees.

108: PROSECUTION & PROGRESS  Item Partnering  Part(G) - Dispute Resolution and Administrative Claims Process.

G Standard A 2016: The Step 2 Meeting shall take place within 14 days of receipt of the dispute packet, and the commissioner’s written decision within 14 days after the Step 2 meeting. Add at the end of Section G:

108: PROSECUTION & PROGRESS  Item Partnering  Section (H) - Post Construction Meeting

H The City will conduct a Post Construction Meeting with the Contractor within 30 days after completion of the project. The purpose of this meeting is to document and evaluate the projects challenges, successes and review the completed Contractor Evaluation Form. The intent of this evaluation is to provide feedback from the construction staff to the City Administration as well as provide an opportunity to communicate our expectations as it relates to providing timely, cost-effective, and quality work. Standard A 2016:

108: PROSECUTION & PROGRESS  Item Determining a Time Extension to the Completion Date and Payment for Excusable Delays.

A Standard A 2016: A. General. The Department will only extend the Completion Date if an excusable delay, as specified in B or D, delays Work on the critical path shown on the accepted progress schedule and impacts the Completion Date. The critical path is defined as; the longest path of activities in the project that determines the project schedule completion date. The activities that make-up the critical path of activities are the ‘Critical Activities.’ Any extension of the Completion Date will be executed by a change order. Any extension of the completion date will be agreed to on a change order, then executed through a supplemental agreement to the contract. Replace with the following:

109: ACCEPTANCE, MEASUREMENT & PAYMENT  Changes and Extra Work. B.2 Negotiated Prices

B.2 Standard A 2016: B.2Delete the first sentence and replace with- Average unit price awarded for the item(s) B.2State–wide average unit price awarded for the item or items as listed in the Departments annual ‘Summary of Contracts Awarded.’ These prices may be adjusted for inflation using factors issued by the Office of Construction Administration. No markup for subcontractor work is allowed.

109: ACCEPTANCE, MEASUREMENT & PAYMENT  Changes and Extra Work. C.6 Subcontract Work

C.6 Standard A 2016: C.6Delete and replace with- For work performed by an approved subcontractor, the City will pay an amount to cover administrative costs of 5% as provided in C.2 through C.5. No additional mark-up is allowed for work of a subcontractor or trucking services employed by a subcontractor.

109: ACCEPTANCE, MEASUREMENT & PAYMENT  Changes and Extra Work. C.8.a Trucking not subjected to Prevailing Wage

C.8 Standard A 2016: C.8.aDelete and replace with- For work performed by an approved subcontractor, the City will pay an amount to cover administrative costs of 5% as provided in C.2 through C.5. No additional mark-up is allowed for work of a subcontractor or trucking services employed by a subcontractor.

600 - INCIDENTALS 611 – Pipe Culverts, Sewers, Drains & Drainage Structures 613 – Low Strength Mortar Backfill 614 – Maintaining Traffic

611: PIPE CULVERTS, SEWERS, DRAINS & DRAINAGE STRUCTURES  (P) Laying Conduit.

Standard A 2016: P. When a sewer conduit is installed by the boring method, a continuous steel casing pipe shall be used per The casing shall be of large enough diameter to provide a minimum clearance of 2 inches between the pipe bell and the inside of the casing, to allow the conduit to be blocked and/or wedged to prevent flotation. The casing shall then be filled with LSM commencing in a manner to expel air until the entire casing is filled. Standard A 2015: P. Where it becomes necessary to lay sewer conduit by the boring method, for whatever reason, a continuous steel casing shall be required meeting the specifications of ODOT Item The casing shall be of large enough diameter to provide a minimum clearance of 2 inches between the pipe bell and the inside of the casing, to allow the conduit to be blocked and/or wedged to prevent flotation. The casing shall then be filled with LSM commencing from the lower end until the entire casing is filled.

611: PIPE CULVERTS, SEWERS, DRAINS & DRAINAGE STRUCTURES  Performance Inspection

Standard A 2016: Performance Testing. Perform deflection testing on all flexible conduit for Sanitary & Storm Sewers. Test all sections between structures (i.e. manholes, catch basins, inlets, chambers, headwalls, etc.). Deflection shall not exceed 5% of the pipe diameter. Test pipe at least 30 days after pipe installation. Standard A 2015: Performance Testing. Perform deflection testing on al flexible conduit for Sanitary & Storm Sewers. Test all sections between manholes. Deflection shall not exceed 5% of the pipe diameter. Test pipe at least 30 days after pipe installation.

613: LOW STRENGTH MORTAR BACKFILL  Mix Proportioning.

Standard A 2015: Standard A 2016: Provide mixes with an unconfined compressive strength between 50 and 100 pounds per square inch at 28 days when tested according to ASTM D Ensure that the long term (12- month) unconfined compressive strength is less than 100 pounds per square inch. Delete “250 lbs/yd 3 ” of Fly Ash, Class F for Type 1 and replace with “175 lbs/yd 3 ”

614: MAINTAINING TRAFFIC  Traffic Control - General

Standard A 2016: Openings and/or trenches in residential roadways need to be temporarily filled to the surface with compacted granular material over granular backfill as specified until the permanent pavement is placed. Openings and/or trenches in roadways other than residential streets will require a minimum of (3”) temporary asphalt (or cold patch material) over compacted granular backfill as specified until the permanent pavement is placed. The contractor shall monitor and repair temporary patches as needed. All work to install, maintain and remove said patches shall be at no additional cost to the City of Toledo. Failure to properly maintain these patches will result in liquidated damages of $300 per calendar day.

700 – MATERIAL DETAILS 703 – Aggregate

703: AGGREGATE  Suitable Materials for Embankment Construction.  Section C: Granular Material Types  3. Granular Material Type C

Standard A 2016: Delete entire section and Replace with the following- Furnish a mixture consisting of 60% material meeting Size No. 1 & 2 per table under A and 40% material meeting Item 304 per table A

QUESTIONS? ASK TRACY MARTIN