LBT Q4 2007 Engineering Review PMCD. 21-DEC-2007LBT Q4 2007 Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except.

Slides:



Advertisements
Similar presentations
Administrative issues Hanna Tolonen EHES JA Kick-off meeting, 21 January 2010, Luxembourg.
Advertisements

LBT Q Eng/SW Review ALPC – Primary Mirror Aluminum Shooting.
LBT Q Engineering Review ALPC – Primary Mirror Aluminum Shooting.
Federal - Provincial -Territorial On-Farm Food Safety Recognition Program A presentation to COFFS WG on November 28, 2007 Germain Brazeau, Development.
© Nintendo Game Document Game Development - Spring
Team Name Critical Design Review Team Members Date Fall 2011 Rev A
OJT 2. 50% Coding Defense  Dec (schedule to be posted soon)  Start of user’s manual.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
Sacramento Local Agency Formation Commission (LAFCo) UPDATE ON PROPOSED SMUD ANNEXATION Presented to Yolo LAFCo September 19, 2005.
CSE9020 Schedule, / 1 The Suggested Schedule Week Content/Deliverable 1. 4/3Unit Overview, Project Description, Meetings, Group Formation 2. 11/3Project.
1 Introduction to Engineering Second Semester Overview Agenda Team Assignments and Information Exchange Course Overview.
LBT Q Engineering Review Swing Arms (SWA) Apr-04LBT Q Engineering Review Highlights (Q4/2007) The PF SAs lost their cable trays The.
LBT Q Eng/SW Review TEL – TELEMETRY Tony Edgin.
MPO Operating Manual  Manual is …about 95% Complete  Manual is not …collection of new regulations/procedures …meant to be all inclusive  Today, lets.
WLE Operations Team Planning Meeting 2 nd February 2015, Water’s Edge.
Sacramento Area Council of Governments ITS Partnership Meeting February 2, 2005.
LBT Q Engineering Review DYB. 21-Dec-2007LBT Q Engineering Review Highlights (Q4/2007) Currently in Commissioning Phase Currently in Commissioning.
LBT Q Engineering Review Instrument Cooling.
LBT Q Engineering Review SAB Static Balancing.
LBT Q Eng/SW Review CM – Configuration Management Stephen Hooper.
1 expect the best Lemuel C. Stewart, Jr. CIO of the Commonwealth Information Technology Investment Board February 9, 2006 CIO Status.
Graphical Detailing in Construction and the Built Environment
LBT Q Engineering Review ESW Engineering Software.
1 LBT Q Engineering Review PWR: Site electrical power, includes power install on levels 1, PEPSI bridge, and 4, and power monitoring.
1 LBT Q Engineering Review ECS: Enclosure Control System, includes the dewpoint sensor, CA system upgrades, grounding, enclosure track performance.
Doc.: IEEE /0792r0 Submission July 2008 Adrian Stephens, Intel CorporationSlide TGn Editor Report July 2008 Date: Authors:
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
The Blockheads Status Presentation I. Week 1 Changes were made to our timeline and program based on the meeting held with Dr. Snell on Thursday, January.
® Sponsored by GroundWaterML2 SWG 97th OGC Technical Committee Sydney, Australia Bruce Simons 02 December 2015 Copyright © 2015 Open Geospatial Consortium.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Status of the Planning Working Group’s (PWG) Efforts
SCHEDULE Nov 1st - Assembly Table Complete
Project Name Company Name Presenter Name
Simplification of Lighting and Light-Signalling Regulations
Save these dates! October 14, 15 and 16, 2010 ASU Student Union
WG Composition: WG Convener: W. A. Radasky
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Submission Title: [Task Group 4 Low Rate WPANS Closing Report]
Progress Report on APMP. M
13-block rotation schedule
SPR&I Regional Training
Due Dates subject to change. Watch for dashboard updates.
ARMY ROTC BOARD DATES year High School Application Opens for SY 18-19 12-Jun-18 1st High School Selection Board Deadline for Documents 1-Oct-18.
Information Management & Financial Analysis for HR Managers
Rock O’ The Range ListenUP
Liaison Report from Date: September 20, 2012 September 2012
doc.: IEEE /479r0 Mika Kasslin TGh chair
Value-Based Payments.
IEEE Working Group for Wireless Personal Area Networks (WPANs)
IEEE IMT-Advanced Review Process
IEEE 802 IMT-Advanced Technology Proposal Process
EC Update on LMSC Policy and Procedures
ETS WG, 30 January-1 February 2006 Agenda Item
IEEE TGmc September 2013 Agenda
TGba January 2018 Closing Report
Tge draft ballot information
TGn Editor Report Sept 2008 Date: Authors:
DG Environment, Unit D.2 Marine Environment and Water Industry
IEEE 802 IMT-Advanced Technology Proposal Process
May June 30 Aug 31 Sept-Dec Jan 04 Feb 04 March 04
IEEE LRLP TIG Long Range Low Power January 2016 Closing Report
Next Steps on the §309 Regional Technical Support Document April 2003
KPLT Meeting Friday, June 21, 2019
Native American Webquest
ANAB AQMS Activity 2011 ~ to date July 2011
Calendar Overview – Phase I – REVISED April 2019
Value-Based Payments.
Working Party on Noise (GRB) General information and WP.29 highlights
KPI and KVI Review Approach & Plan
Presentation transcript:

LBT Q Engineering Review PMCD

21-DEC-2007LBT Q Engineering Review Highlights (Q4/2007) Draft of System Overview and O&M manual complete except for minor edits. Draft of System Overview and O&M manual complete except for minor edits. Steward Internal review held Dec 20 th. Steward Internal review held Dec 20 th. Document Tree database complete and drawings are being reviewed for correct format and revised where necessary. Document Tree database complete and drawings are being reviewed for correct format and revised where necessary. Document Tree being reformatted into hierarchical form. Document Tree being reformatted into hierarchical form. Current Completion Date is February Current Completion Date is February 2008.

21-DEC-2007LBT Q Engineering Review Open Issues Technical Technical None None Schedule Schedule Current due to availability of LBT Engineering Group to participate in final review. Current due to availability of LBT Engineering Group to participate in final review. Financial Financial None None Resource Resource None None

21-DEC-2007LBT Q Engineering Review Progress (Q4/2007) Complete System Overview and O&M Manual Draft and Submit for Review (Planned Dec) (Draft complete except for minor edits will submit for review in January) Complete System Overview and O&M Manual Draft and Submit for Review (Planned Dec) (Draft complete except for minor edits will submit for review in January) Complete Drawing Tree and Drawing Revisions (Jan) (Still planned for January) Complete Drawing Tree and Drawing Revisions (Jan) (Still planned for January) Complete Final docs (Jan) (Still planned for January) Complete Final docs (Jan) (Still planned for January)

21-DEC-2007LBT Q Engineering Review Planning (Q1/2008) Complete System Overview and O&M Manual Draft and Submit for Review (Jan) Complete System Overview and O&M Manual Draft and Submit for Review (Jan) Complete Drawing Tree and Drawing Revisions (Jan) Complete Drawing Tree and Drawing Revisions (Jan) Complete Final docs (Jan) Complete Final docs (Jan) Final Review meeting Feb, 13 th. Final Review meeting Feb, 13 th.