Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui.

Slides:



Advertisements
Similar presentations
Pixel Chip Testing S. Easo, RAL Current Status of the Pixel Chip Testing. Plans for an LHCb Test Setup at CERN.
Advertisements

6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
UNIVERSITA’ DEGLI STUDI DI NAPOLI FEDERICO II Luigi Cimmino November 12 th, Tokyo INTERNATIONAL WORKSHOP ON MUON & GEO-RADIATION PHYSICS FOR EARTH.
EXL/R3B Calorimeters- Readout from ASIC to DAQ Ian Lazarus STFC Daresbury Laboratory.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Developing the Timepix Telescope Planning a Future Timepix Telescope Richard Plackett – VELO Testbeam Meeting CERN, 7th October 09.
MICE Electronics Update Mice Target Workshop – Dec 2010 P J Smith James Leaver.
6 June 2002UK/HCAL common issues1 Paul Dauncey Imperial College Outline: UK commitments Trigger issues DAQ issues Readout electronics issues Many more.
1 Design of the Front End Readout Board for TORCH Detector 10, June 2010.
Using FPGAs with Embedded Processors for Complete Hardware and Software Systems Jonah Weber May 2, 2006.
-1- Current Telescope Strengths High resolution (~2.5um) Adaptability Ease of use – Currently borrowed by SPS collimator group Weaknesses Small number.
Development of Readout ASIC for FPCCD Vertex Detector 01 October 2009 Kennosuke.Itagaki Tohoku University.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
MR (7/7/05) T2K electronics Beam structure ~ 8 (9?) bunches / spill bunch width ~ 60 nsec bunch separation ~ 600 nsec spill duration ~ 5  sec Time between.
PMF: front end board for the ATLAS Luminometer ALFA TWEPP 2008 – 19 th September 2008 Parallel Session B6 – Programmable logic, boards, crates and systems.
FEE Electronics progress Mezzanine manufacture progress FEE64 testing and VHDL progress Test mezzanine. Trial mechanical assembly 10th November 2009.
AIDA FEE64 development report August 2010 Progress after Texas CAD work Manufacturing 25th August
Understanding Data Acquisition System for N- XYTER.
7 Nov 2007Paul Dauncey1 Test results from Imperial Basic tests Source tests Firmware status Jamie Ballin, Paul Dauncey, Anne-Marie Magnan, Matt Noy Imperial.
A Readout Electronics for MAPMT Matteo Turisini – E. Cisbani Italian National Institute of Health – INFN Rome 1 JLab/CLAS12 RICH Meeting - 16/Nov/2011.
C.Schrader; Oct 2008, CBM Collaboration Meeting, Dubna, Russia R/O concept of the MVD demonstrator C.Schrader, S. Amar-Youcef, A. Büdenbender, M. Deveaux,
Timepix Telescope Plans Proposed Work Packages for the Timepix Telescope Richard Plackett CERN, 8 th December 09.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixtures FEE64 commissioning A few of the remaining tasks 16th July 2009.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
News on GEM Readout with the SRS, DATE & AMORE
IPHC - DRS Gilles CLAUS 04/04/20061/20 EUDET JRA1 Meeting, April 2006 MAPS Test & DAQ Strasbourg OUTLINE Summary of MimoStar 2 Workshop CCMOS DAQ Status.
SRS Activities at IFIN-HH: VMM2 Hybrid, FECv6 Firmware, High- Density Optical ATCA-SRS Mezzanine Sorin Martoiu, Michele Renda, Paul Vartolomei (IFIN-HH.
Barcelona 1 Development of new technologies for accelerators and detectors for the Future Colliders in Particle Physics URL.
Specifications Asic description Constraints Interface with PDM board Schedule Summary.
AFE Meeting June 5, 2001 SIFT UPGRADE Marvin Johnson.
1 Calorimeter electronics Upgrade Outcome of the meeting that took place at LAL on March 9th, 2009 Calorimeter Upgrade Meeting Barcelona March 10th-11st,
Visit to CALICE ECAL testbeam (by Shinshu) at DESY, 16 th – 19 th October 2012 Samir Arfaoui & Erik van der Kraaij 30 th October 2012.
ASIC Activities for the PANDA GSI Peter Wieczorek.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
Slide 1Turisini M. Frontend Electronics M.Turisini, E. Cisbani, P. Musico CLAS12 RICH Technical Review, 2013 June Requirements 2.Description of.
ILD/ECAL MEETING 2014, 東京大学, JAPAN
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
11 October 2002Paul Dauncey - CDR Introduction1 CDR Introduction and Overview Paul Dauncey Imperial College London.
BPM stripline acquisition in CLEX Sébastien Vilalte.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
Scott Mandry, EUDET JRA1 Meeting, DESY 30 th January ISIS1 Testbeam EUDET JRA1 Meeting, DESY 30 th January 2008 Scott Mandry LCFI Collaboration.
Update on the New Developments & Analysis from Hawaii Larry Ruckman & Gary Varner Instrumentation Development Laboratory (ID-Lab) University of Hawaii.
HaRDROC performance IN2P3/LAL+IPNL+LLR R. GAGLIONE, I. LAKTINEH, H. MATHEZ IN2P3/IPNL LYON M. BOUCHEL, J. FLEURY, C. de LA TAILLE, G. MARTIN-CHASSARD,
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Jan. 25, 2011 Status of the Aerogel RICH Readout Trig/DAQ Meeting in Beijing 1 S. Nishida (KEK) S. Nishida Status of the Aerogel RICH Readout Belle II.
KM3NeT Offshore Readout System On Chip A highly integrated system using FPGA COTS S. Anvar, H. Le Provost, F. Louis, B.Vallage – CEA Saclay IRFU – Amsterdam/NIKHEF,
Update on works with SiPMs at Pisa Matteo Morrocchi.
August 24, 2011IDAP Kick-off meeting - TileCal ATLAS TileCal Upgrade LHC and ATLAS current status LHC designed for cm -2 s 7+7 TeV Limited to.
AHCAL Electronics. Status of Integration Mathias Reinecke for the DESY AHCAL developers AHCAL main and analysis meeting Hamburg, July 16th and 17th, 2009.
DOM Electronics (Digital Optical Module) 1 WPFLElectronics PPMDOM ElectronicsF. Louis.
Specifications Asic description Constraints Interface with PDM board Planning Summary.
1 Programming of FPGA in LiCAS ADC for Continuous Data Readout Week 4 Report Tuesday 22 nd July 2008 Jack Hickish.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
SKIROC status Calice meeting – Kobe – 10/05/2007.
MADEIRA Valencia report V. Stankova, C. Lacasta, V. Linhart Ljubljana meeting February 2009.
Giovanna Lehmann Miotto CERN EP/DT-DI On behalf of the DAQ team
PRAD DAQ System Overview
Baby-Mind SiPM Front End Electronics
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
KRB proposal (Read Board of Kyiv group)
VELO readout On detector electronics Off detector electronics to DAQ
Status of n-XYTER read-out chain at GSI
Felix Sefkow CALICE/EUDET electronics meeting CERN, July 12, 2007
Example of DAQ Trigger issues for the SoLID experiment
SKIROC status Calice meeting – Kobe – 10/05/2007.
SKIROC status CERN – CALICE/EUDET electronic & DAQ meeting – 22/03/2007 Presented by Julien Fleury.
Readout Systems Update
Red Pitaya with EPICS Andraz Pozar EPICS Collaboration Meeting
Presentation transcript:

Notes on visit to Rome 28/04/2014 Christian Joram Szymon Kulis Samir Arfaoui

Great welcome, enthusiastic team – 2 senior physicists (Stefano, Franz) – 3 students (1 new, 2 are done) – 2(?) electronic engineers We were shown a few presentations on – overall system design – software – operation Lab visit, demo of DAQ

S. Veneziano (designed by Rome team ≠ Omega evaluation board)

EASIROC + Zedboard

Only 1 EASIROC version from Omega External trigger – to externally trigger the chip we have to provide the hold signal (as a TTL signal) must be adjusted to come as the signal from slow shaper peaks alternatively, implement delay of the input if hold signal comes too late ADC sampling frequency: 2 MHz – affects multiplexing – “ultimate” readout rate: 2 / 32 = ~ 50 kHz Analogue probe output very useful – can select nodes to probe on the EASIROC, e.g. after preamp, after shaper, … Rome observed fragility of EASIROC input with bias voltage (70V), killed a chip – future PCB design may include choice between AC or DC coupling

ZedBoard – commercial, off-the-shelf – costs a few hundred euros – FPGA Zynq 7020 (with embedded ARM processor) Data packet transport rate: ~kHz – however a packet may contain many triggers Zero-suppression foreseen, not yet implemented Readout of several boards in parallel is on Rome's agenda, but not yet tested – Can use Gigabit Ethernet switch to connect to several boards – How can synchronisation be guaranteed? – How would one combine it e.g. with a beam telescope DAQ in a test beam? BUSY logic not yet implemented

What we would need to get started ? – ~10 PCBs with updated design from Rome (320 ch.) – all the on-board components, mounting at CERN workshop – 10 EASIROC chips (from Omega) – 10 ZedBoards (off the shelve, from industry) – Linux PC – DAQ software packages (from Rome) – FPGA firmware (from Rome) The software is quite well documented in 2 theses (1 in English, 1 in Italian)

S. Veneziano

Conclusions The FPGA based readout system of the EASIROC developed in Rome is very versatile and flexible (it was originally conceived for the readout of a PIN diode array) but also a relatively complex. Thanks to the embedded CPU the system contains lots of (currently unused) potential (e.g. zero suppression, online data processing, …). Used as a black box, the system could be operational at CERN in about 2- 3 months. The configuration of the EASIROC, the data acquisition and transfer require the interplay of a number of busses, protocols etc. This has been solved, but expert knowledge of the system will be needed in case of extensions or debugging. --> The Rome system of the EASIROC ASIC seems to have most of the functionality needed for the readout of a few 100 SiPM channels in a lab (source, cosmics) or test beam. Measurement of time needs to be studied. It's a viable solution provided that 1 or 2 persons familiarise themselves with the system to do debugging and adaptation work.