Detuning of T18 after high power test Jiaru Shi 18.04.2012.

Slides:



Advertisements
Similar presentations
Breakdown Rate Dependence on Gradient and Pulse Heating in Single Cell Cavities and TD18 Faya Wang, Chris Nantista and Chris Adolphsen May 1, 2010.
Advertisements

Single-Cell Standing Wave Structures: Design
CLIC08 workshop Structure production: CERN activities and Master Schedule G. Riddone, W. Wuensch, R. Zennaro, Contributions from C. Achard, S. Atieh, V.
Single cell standing wave tests data analysis Jiaru Shi Sep 27, 2011 LCWS11, Granada, Spain.
PETS components and waveguide connections CLIC Workshop 2007 David Carrillo.
5th Collaboration Meeting on X-band Accelerator Structure Design and Test Program. May 2011 Review of waveguide components development for CLIC I. Syratchev,
Choke-mode Damped X-band Structure for CLIC Main Linac Hao ZHA, Jiaru SHI CERN Sep 27, 2011 Jiaru Shi, LCWS11 Workshop, Granada1.
Choke-mode damped accelerating structures for CLIC main linac Hao Zha, Tsinghua University Jiaru Shi, CERN
CLIC drive beam accelerating (DBA) structure Rolf Wegner.
Normal-Conducting Photoinjector for High Power CW FEL Sergey Kurennoy, LANL, Los Alamos, NM, USA An RF photoinjector capable of producing high continuous.
Report from KEK High gradient study results from Nextef (+ other related activities) LCWS2011, Granada Sep. 27, 2011 T. Higo.
Status of KEK production July 11, 2008 at SLAC KEK T. Higo et al., Accelerator div. T. Takatomi et al., Mech. Eng. Center.
X-band Structures Test Results at NLCTA Faya Wang Chris Adolphsen, Christopher Nantista 9-Feb-11.
T24_vg1.8_disk 11WNSDVG1.8 CLIC_G GHz measurements versus simulations A.Grudiev CERN
Recent 30 GHz CTF2 M. Gerbaux, S. Döbert, Jan Kovermann, R. Zennaro.
1 X-band Single Cell and T18_SLAC_2 Test Results at NLCTA Faya Wang Chris Adolphsen Jul
Vasim Khan X-Band RF Structures, Beam Dynamics and Sources Workshop, Cockcroft Institute /13 CLIC_DDS study
Design of Standing-Wave Accelerator Structure
Cell-Coupled Drift Tube Linac M. Pasini, CERN AB-RF LINAC4 Machine Advisory Committee 1 st meeting CERN January 29-30, 2008.
R&D For Accelerating Structures H. Padamsee. TESLA Niobium, one meter length, rf = 1.3 GHz Copper, 53 cm, rf = 11.4 GHz.
324MHz FETS RFQ RF measurement and components By Aaron Cheng 18 December 2006.
Different mechanisms and scenarios for the local RF
Alessandro Cappelletti for CTF3 collaboration 5 th May 2010 RESULTS OF BEAM BASED RF POWER PRODUCTION IN CTF3.
Zenghai Li SLAC National Accelerator Laboratory LHC-CC13 CERN, December 9-11, 2013 HOM Coupler Optimization & RF Modeling.
Course B: rf technology Normal conducting rf Part 5: Higher-order-mode damping Walter Wuensch, CERN Sixth International Accelerator School for Linear Colliders.
TD24 R05 N1 after high-power test analysis plans A. Degiovanni, M. Aicheler, N. Mouriz Irazabal, A.T. Perez Fontenla, R. Wegner CLIC RF Structure Development.
Clustered Surface RF Production Scheme Chris Adolphsen Chris Nantista SLAC.
Overview of CLIC main linac accelerating structure design 21/10/2010 A.Grudiev (CERN)
Higher-Order Modes and Beam-Loading Compensation in CLIC Main Linac Oleksiy Kononenko BE/RF, CERN CLIC RF Structure Development Meeting, March 14, 2012.
L-band (1.3 GHz) 5-Cell SW Cavity High Power Test Results Faya Wang, Chris Adolphsen SLAC National Accelerator Laboratory
ENGINEERING DESIGN AND FABRICATION OF X-BAND DAMPED DETUNED STRUCTURE V. Soldatov¹, D. Gudkov¹, A. Samoshkin¹, G. Riddone², A. Grudiev², S. Atieh², A.
Group 6 / A RF Test and Properties of a Superconducting Cavity Mattia Checchin, Fabien Eozénou, Teresa Martinez de Alvaro, Szabina Mikulás, Jens Steckert.
PBG Structure Experiments, AAC 2008 Photonic Bandgap Accelerator Experiments Roark A. Marsh, Michael A. Shapiro, Richard J. Temkin Massachusetts Institute.
Summary of progress towards CLIC goals and next steps for structure testing 6 th X-band collaboration workshop, April 18 th- 20 th 2012 Steffen Döbert,
KEK workshopWalter Wuensch18 April 2012 Status and objectives of the CLIC X-band and high- gradient activity.
1 Al Moretti, APC, Fermilab MAP- Winter Meeting February 28 - March 4, 2011 TJNAF Newport News, VA.
Sensitivity of HOM Frequency in the ESS Medium Beta Cavity Aaron Farricker.
10/2007 M.Taborelli, TS-MME M.Taborelli Structure fabrication: dimensional tolerances Contributions of : G.Arnau-Izquierdo, A.Cherif, D.Glaude, R.Leuxe,
Summery of the power coupler session at the LCWS13 workshop E. Kako W.-D. Möller H. Hayano A. Yamamoto All members of SCRF WG November 14, 2013.
Hybrid designs - directions and potential 1 Alessandro D’Elia, R. M. Jones and V. Khan.
Nextef results CLIC09, Oct T. Higo (KEK). Contents Quadrant high gradient test status – Initial processing and power limit – VAC characteristics.
TD18 High Power Test Results Faya Wang Chris Adolphsen May 3, 2010.
Status of high gradient experiments at Nextef Kazue Yokoyama, Toshiyasu Higo, Yasuo Higashi, Shuji Matsumoto, Shigeki Fukuda Accelerator Laboratory, KEK.
Tolerances coming from RF Alexej Grudiev 24 Nov 2014 X-band accelerating structure review.
Review of the rf working group of the ICFA Mini Workshop on Novel Accelerators and Colliders which was associated with the Bob Siemann Memorial Symposium.
BINP geometry (= cavity inner dimensions which define the boundary) is based on CERN geometry (as of August 4, 2008) with some adjustments made in order.
Some information from Nextef For poster session in IWLC T. Higo.
CLIC Workshop 2008 TBTS status. PETS testing program and installation status. Igor Syratchev & Germana Riddone for the CLIC team.
Accelerating structure prototypes for 2011 (proposal) A.Grudiev 6/07/11.
RF Modeling of the LHC Crab Cavity Zenghai Li SLAC Zenghai Li LARP CM20 April 8-10, 2013.
RFQ coupler S. Kazakov 07/28/2015. Requirements: Coupler requirements Expected problems: Heating (loop, ceramic window, etc.) Multipactor Solutions: Appropriate.
High Power Crab Cavity Testing Ben Woolley HG2016 Argonne National Lab. 8 th June 2016.
Test Accelerating Structures Designs, Objectives and Critical Issues
RF Dipole HOM Electromagnetic Design
XFEL beamline loads and HOM coupler for CW
New test structures for CLIC (RF design)
RF Power Generation and PETS Design
CLIC_DDS study
Physics design on Injector-1 RFQ
Review of rf structure test results
SPARC RF gun status by P. Musumeci Review committee
12 GHz High Power RF components requirements for CEA activities
Alberto DEGIOVANNI CLIC Workshop CERN
Summary of the test structure design
CEPC injector high field S-band accelerating structure design and R&D
Update of CLIC accelerating structure design
CEPC 650MHz High Efficiency Klystron R&D
A.Lounine, T.Higo H60VG3K1 Couplers Design. MDK-2001 CERN Switzerland.
Progress in the design of a damped an
5th X-Band Structure Collaboration Meeting
Presentation transcript:

Detuning of T18 after high power test Jiaru Shi

Outline RF measurement of CERN-Build T18 – Comparison before and after high power test – Detuning Analysis Old results – (From Juwen Wang and Toshiyasu Higo) Related simulation Geometry Change and analysis

RF measurement Before high power test after high power test CERN built T18

Faya SLAC

After high power testBefore high power test Increased standing wave Regular cells are fine

Analysis using the code for tuning from bead-pull data See detuning of input matching cell The detuning of last two cells are calculated from the standing wave patter, or the reflection from the output matching. Details next slides. (Note: while tuning, these two cells are tuned to correct the standing wave).

Standing wave pattern  Reflection (both phase and amplitude) The imaginary part of this reflection can come from detuning of the last regular cell cell(N-1). Decrease of frequency Or the matching cell: Cell(N) Increase of frequency: Important note: the phase advance between the last two cells is ~100deg. Not 120 deg! Note: imag part of reflection comes from detuning, while real part of reflection comes from unmatched coupling before last regular cell (N-1) before Matching cell (N)

Amplitude Measurement of T18-SLAC #1 Before and After High Power Test MHz at 21.32°C, N2 Before high Power test MHz at 20.4°C, N2 After high power test Juwen SLAC 1350 hours

MHz at 21.32°C, N2 ore high Power test MHz at 20.4°C, N2 After high power test Phase Measurement of T18-SLAC #1 Before and After High Power Test Juwen SLAC

Amplitude Measurement of TD18-SLAC Before and After High Power Test MHz at 21.46°C, N2 Before high Power test MHz at 21.1°C, N2 After high power test Juwen SLAC

Phase Measurement of TD18-SLAC Before and After High Power Test 16.5° MHz at 21.46°C, N2 ore high Power test MHz at 21.1°C, N2 After high power test Select bead pulling frequencies based on the same measurement condition for both before and after high power test Juwen SLAC

Amplitude Measurement of T18-SLAC #1 Before and After High Power Test MHz at 20.02°C, N2 Before high Power test MHz at 20.4°C, N2 After high power test T24 Juwen SLAC

Phase Measurement of T24-SLAC Before and After 800 Hours High Power Test Select bead pulling frequencies based on the measurement condition to get 2π/3 phase advance for both before and after high power test 6º MHz at 21.1°C, N2 After high Power test MHz at 21.2°C, N2 Before high power test Juwen SLAC

Similar Standing-Wave pattern for T(D)18 T18-CERN T18-SLAC TD18-SLAC T24-SLAC

Summary of the detuning T18 SLAC N1TD18 SLACT24 SLACT18 CERN N2 Measured atSLAC CERN Output matching Standing Wave (SWR) (reflection)0.03, -30dB0.1,-20dB0.025, -32dB0.05, -26dB Estimate df if one cell detuned 2MHz7MHz2.5MHz3MHz from standing wave pattern cell or cell cell or cell Regular cells Total phase shift-16 deg+6 deg ~df+1 MHz-0.3 MHz Note: T(D)18 structures have similar design where the phase advance between last two cells is ~100 deg. Making it hard to tell at Nth or at N- 1th cell. It seems at the last cell.

RF measurement before/after baking T24 12G N1 – Same configration – Temperature df calculated

Phase S21 Delta f ~10kHz

S21 mag df ~30kHz

T24 12G N2, leak fix at mode launcher – With and without wire, no direct comparison – Phase compare N/A because change of RF flange adapter – df < 50kHz, Reflection increase 100k grid

CERN PSI N2 after baking, df<100kHz – (same situation)

TD18 TD18 post-HPT (High Power Test) analysis – 1. Chamfer From: Markus Aicheler

TD18 Chamfer 100 um  -1MHz Chamfer TD18 Fill the 100um Chamfer  +1MHz

T18 chamfer 100 um  -0.5MHz

Electromagnetic field Scaled to 150 MV/m Eacc P = (-epsilon0 E^2 + mu0 H^2)/4 static simulation Material: Copper E = 110GPa Max deform: 0.06um, very small. 0.06um  12kHz not the right direction HFSS result: Iris deform 10um  ~ 2MHz Circular Wg Matching cell E field pull B field push

Asymmetry heating? Circular Wg Matching cell Surface heating  expansion?

The source of detuning is not clear, but we find that. The MHz detuning corresponds to a geometry change that can be measured! The structure is cut open and critical dimensions are measured

T18 CERN N2 Cut

1: measure the profile of tuning bump, compare with the tuning history Tuning bump visible by eye

Height of tuning bump v.s. recorded tuning Good agreement “< +/- 1MHz”

T18 CERN N2 Cut 2: measure the distance between irises.

Distance between irises (gap) Half-A Half-B Error +-3 um. Three points are measured: “left” and “right” close to the cell wall, “center” close to the iris region Last cell is longer in “center”.

Simulation with deformed output matching iris in HFSS Single cell simulation gives 3MHz detuning from ~15 um “iris deform”. Full structure simulation shows similar standing wave pattern.

Summary (1) It’s a critical issue for the reliability and the lifetime of the accelerating structures. Almost every structure has an increased reflection from output, causing a standing wave pattern. For the same type of structure, the patterns are very similar. Geometry measurement on the T18 (CERN N2) shows deformation on the output matching iris This explains the increased reflection. (Most probably, this is also the case for the other 3 structures) In CLIC nominal design with compact coupler from the side, there will be no iris with such field asymmetry. Input side, cut into halves? Or take it iris by iris. Measure the profile of the whole input matching iris multiple-physics-coupled simulation: the deform of matching iris and the asymmetrical pulsed heating.

Summary (2) Frequency change of regular cells is observed in several structures, in TD18, but not in T18s; in T24s. in TD24? To be analyzed in near future: TD24 taken out from TBTS. – RF measurement, Cut, and dimensional control.