Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.

Slides:



Advertisements
Similar presentations
Starting Planning for the 2010 Policy Key Issues Notes for the TAC Executive Committee April 8, 2009 Phil Hattis, AIAA VP for Public Policy.
Advertisements

European COoperation in the Field of Scientific and Technical Research Role and rules of procedure for Management Committee Carine Petit Science Officer.
African Aviation Training Organization
THE STANDARDS DEVELOPMENT PROCESS STEP 1 PUBLIC AND COMMITTEE PROPOSAL STAGE PUBLIC AND COMMITTEE PROPOSAL CLOSING DATE FIRST TECHNICAL COMMITTEE MEETING.
Section 305 Technical Subcommittee Boston, MA: June 14, 2014.
1 E-911 Services Board Meeting General Business Meeting May 23,
Doc.: IEEE Submission March 2015 Motions and Supporting Material for EC Meeting Agenda Items Friday, March 13, 2015 Estrel.
Report on Technical Board (Sept. 2014) Taketo Uomoto Chairman of TB.
E C C National Electrical Code process How did we get from there to here….
Report on Technical Board (Sept. 2014) Taketo Uomoto Chairman of TB.
Letter of intent By to predefined format (Word file, see guidelines) Chair Scientific Committee Coordination EO To all members of.
Implementing ISO/IEC in your workplace (And why should technical communicators care about standards, anyway?) George Hayhoe Mercer University School.
TheRrole of the UN Commission on the Limits of the Continental Shelf Continental Shelf Outer Limit Workshop, Kuala Lumpur The Role of the UN Commission.
Budget Setting Process For 2015 Budget Draft 0.1 Member Forum Date of Meeting: 27th May 2014.
Why Proposed TC Procedures? Define how TC reaches “completion” of what OASIS calls “Committee Specifications” TC procedures lead up to the OASIS process:
IEEE /r3 Submission September 2008 John Notor, Cadence Design Systems, Inc.Slide 1 IEEE IMT-Advanced Review Process Date:
Networking the World TM IEEE: Networking the World.
Report from COEN CAMD Krakow 27 – 28 October 2011 Lars Johansson.
1 Accredited Standards Committee C63 ® - EMC Subcommittee 1: Techniques and Developments Zhong Chen SC1 Chair
0 HITSP Technical Committee 2008 Project Plans September 7, 2008 V1 HITSP Project Document Production Schedules Timeline Overview 2008 Use Case Detail.
DICOM to ISO-DICOM Report to joint ISO TC215/WG2 – DICOM WG10 meeting January 24, 2004, San Diego.
ISO Liaison Report Hidenori Shinoda Charles Parisot.
CISPR/TC77 Joint Task Force Activity Update ACEC meeting in Paris, June 2006 Prepared by Donald N. Heirman Chairman CISPR Subcommittee A.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Report on Technical Board (Oct. 2015) Takafumi Sugiyama Chairman of TB.
Progress Report Performance Audit Subcommittee - PAS INTOSAI Governing Board meeting Mexico City, November 2 and 3, 2006.
Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB.
MM/DD/YYYY Proposed changes to AIAA Bylaws, TAC Charter and Chair Manual Kathleen Atkins, Jeff Hamstra, and Mark Melanson Sci-Tech January 2015.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Middle Fork Project Relicensing Process Plan April 25, 2006.
Under construction SPANISH PRESIDENCY OF THE EU 2010 FRAMEWORK CONDITIONS ROADMAP 4-May-2010.
Doc.: IEEE /0045r1 Report January 2012 Jon Rosdahl, (CSR)Slide 1 1 st Vice Chair Report Date: Authors:
Doc.: IEEE /1157r0 Submission September 2010 Dorothy Stanley (Aruba Networks)Slide 1 September 2010 Closing Report -TGmb Date: Authors:
A Year in the Life Of a State Data Coordinator December, 2013.
APNIC Fee Structure Report APNIC 28 Beijing. APNIC annual revenues and expenses analysis.
PRESENTED BY HENRY RUHNKE WALD, RUHNKE & DOST ARCHITECTS, LLP SIERRA HOUSE & DROP-IN CENTER.
African Aviation Training Organization
ISA-SP99: Security for Industrial Automation and Control Systems
OMA-TP TP5 Future meetings Future meetings
NCWG Terms of Reference NCWG April 2016, IHB, Monaco
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
Proposed Bay TMDL Schedule
All Wales Safeguarding Procedures Review Project
1st Vice Chair Report Date: Authors: January 2012
Goods Packed by Measure
NATA Foundation Building Blocks Process
IEEE RR-TAG September 28th Teleconference Agenda
IEC Maintenance Committee Report
doc.: IEEE <doc#>
IEEE Motions in July Plenary DCN:
TTA′s Transposing Plan Mar
Month Year IEEE Motions in July Plenary DCN:
doc.: IEEE <doc#>
Next Steps Advisory group debrief call Circulate meeting summary
IEEE MEDIA INDEPENDENT HANDOVER
Mexico 8th Meeting of the Steering Committee of INTOSAI Committee on
The Transformation of A Small Company Into A Golden Legend
Generic Revenue Driver Methodology
Submission Title: [WG-TG3b Meeting Report September05]
Working Party on General Safety Provisions (GRSG) General information
ETS WG, 30 January-1 February 2006 Agenda Item
TGn Editor Report Sept 2008 Date: Authors:
EC LMSC Policy and Procedures Update
IEEE MEDIA INDEPENDENT HANDOVER
WNG SC Agenda Date: Authors: November 2018 July 2013
TGad Editor Report Date: Authors: March 2011 April 2007
Proposal for amendments to the Statutes
CONSTITUENT BODY REFORM (CBR)
2015 January February March April May June July August September
Status of discussion after 8th meeting
Presentation transcript:

Report on Technical Board (Sept. 2013) Taketo Uomoto Chairman of TB

Works of TB and TC Technical board was not opened. Three Technical committees have done their works as scheduled and the details of the TC will be explained by three chairmen. The works are (a) revision of ACMC 2006 and (b) drafting of Level 3 documents, (c) statistical data servay. The final meeting of TB will be held on Sept. 11, st Technical Board meeting was in October 2012 in Thailand. New STC among young researchers have been established after EC approved through discussion. 1 st report will be made at TB meeting on 11 th September.

Technical Board ICCMC Working Groups of WG1, WG2 and WG3 is transformed to Technical Committees TC1, TC2 and TC3, respectively. There can be more TCs in the future when necessary. The ACF Technical Board (TB) consists of VP for Technical, Chairs of all TCs and one elected EC member who is an individual member.

Members of Technical Board Members of technical board is composed by 4 categories. 1) Vice-president (technical) 2) Chairmen of technical committees (elected 3 chairmen) 3) Chairman of the Editorial Committee 4) Elected chairman of Technical Board Total of 6 members Editorial Committee Chair was also elected.

Works of TB Technical Board or TB takes care of technical matters with TC (Technical Committee) TB will coordinate problems in different TCs when needed. TC will coordinate problems in different STCs when needed. New (STC) Sub-Technical Committee may be formed under each TC.

Relations of TB and TC Technical Board (TB) TC1 TC3 TC4 TC2 STC11 STC12 (ACMC: design) (level 3 documents) STC21 STC22 (ACMC: construction) (level 3 documents) STC31 STC32 (ACMC: maintenance) (level 3 documents) STC41 STC42 (statistical data) (??) STC11, STC21 and STC31 will take a care of ACMC and level 3 documents like ICCMC’s WG1, WG2 and WG3. STC12, STC22 and STC32 can deal with any issue other than ACMC/level 3. For every issue new STC may be created. For works on statistical survey a body other than TC is formed (see the next slide)

Technical Board and Committee Chairman of TB may convene meetings as deemed necessary with a minimum of one meeting per year. Chairman of TC may convene meetings as deemed necessary with a minimum of one meeting per year. When difficult to meet, simplified meetings can be used through internet. Meeting through s is acceptable.

Revision Plan of ACMC Time FrameTask November - May 2013 TC ’ s draft (including drafting, circulating for comments and revision) End of May 2013Drafts of the revised ACMC submitted to VP (of Technical) June 2013Comments from TB July 2013 Revise based on TB ’ s comments August 2013TB and EC approval September - October 2013 Editorial Committee check By the end of 2013 (November 2013) Publish ACMC2013 (DATA: Minutes of P&VP Meeting, April, 2013)

Level 3 Document Level 3 Document “Thailand Standard” which was presented in the previous meeting will be discussed in the last meeting. → “Thailand Standard for Materials and Construction – Guidelines for materials and construction of concrete structures based on Thai Standard specification”. Masaki san knows the latest situation better than me.

Sub-Technical Committee (STC) New sub-technical committee shall be proposed by a group of members on any specified topic. Chairman of the STC must be approved by the TC and TB, and confirmed by EC. The activities of STC should be completed within a 3-year time period. The term may be extended with maximum of 2-years.

STC of Technical Committees TC1: Design –STC11: ACMC revision, etc. –STC12: Level 3 documents TC2: Materials and Construction –STC21: ACMC revision, etc. –STC22: Level 3 documents TC3: Maintenance –STC31: ACMC revision, etc. –STC32: Level 3 documents, etc. TC4: Statistical Data –STC41: Materials and production Two new STC has been proposed by JCI will be discussed at TB meeting on 11 th September. One new STC may be proposed by KCI.