Scope There are now two levels of Scope: Site and LTER. Site (as units are submitted) LTER (vetted by the Units committee) A unit will retain its individual.

Slides:



Advertisements
Similar presentations
Extended DISC Online System User Instruction: How to Generate Reports
Advertisements

Extended DISC Online System User Instruction: How to Run a Team Analysis.
HOW TO ACCESS THE WORLDWIDE ROTARACT DIRECTORY. The Worldwide Rotaract Directory can help you build friendships, find partners for international projects,
Copyright © 2005, SAS Institute Inc. All rights reserved. SAS ABM Survey Kit A Sample Usage Scenario: Collecting Numeric Attribute Values.
IEEE P1622 Meeting, Oct 2011 IEEE P1622 Meeting October 24-25, 2011 Overview of IEEE P1622 Draft Standard for Electronic Distribution of Blank Ballots.
Search Engine – Metasearch Engine Comparison By Ali Can Akdemir.
Customer eForms FSA customers may download and use forms with a Level 1 eAuth account; however, obtaining a Level 2 eAuth.
LTER IM Articulation Work: Developing Community Web Recommendations Nicole Kaplan (SGS), Karen Baker (CCE, PAL), Barbara Benson (NTL), Eda Melendez-Colom.
Realtime Equipment Database F.R.E.D. stands for Fastline’s Realtime Equipment Database. F.R.E.D. will allow you to list all your inventory online. F.R.E.D.
DataMine 2.0 Role: Lead State/Test Facility AASHTO’s NTPEP Program presents: NTPEP DataMine 2.0 NTPEP DataMine 2.0.
ACCESS PART 2. Objectives Database Tables Table Parts Key Field Query and Reports Import from Excel Link to Excel.
DataMine 2.0 Role: Manufacturer AASHTO’s NTPEP Program presents: NTPEP DataMine 2.0 NTPEP DataMine 2.0.
Queries and query design What are queries? Questions that can be asked of the data in the tables. Questions can draw on one or more tables and can have.
WebCT CE-6 Assignment Tool. Assignment Tool and Assignment Drop Box Use “Assignment” button under Course Tools (your must be in “Build” mode) to: –Modify.
Build a database IV: Create queries for a new Access database Overview: Ask your data — create queries It’s time to create queries, one of the most powerful.
Pareto Charts In Excel. The first step in putting a Pareto Chart together is to create a Frequency Table. To do this we need to define the categories.
How To Batch Register Your Students
AND SOME MISCELLANEOUS TOPICS CONCURRENT ACCESS AND SORTING Database Objects.
Getting Started With Website Brought to you by GoldenCare USA Mark Randall November, 2009.
Enter User Id and Password Click on Submit Press Place Order Button.
DWINSA 2007 Website. Website Purpose Allow states to track status of questionnaires Allow systems >100K or states to upload project data.
Sam Houston State University's IR Office Organization System.
Albany ePAY online for Introducing the facility to make Bacs payments directly from within your accounting application the easy and efficient way!
Drinking Water Infrastructure Needs Survey and Assessment 2007 Training.
Drinking Water Infrastructure Needs Survey and Assessment 2007 Website.
1 Navigating the Letter of Recommendation Section on AMCAS For Medical School Applicants using the Letter of Recommendation Service provided by Lewis Associates.
VOCAB VTC Jan. 13, VTC Agenda Terms of Reference – take a look Planning: Use-Case and Vocabulary Database Workshop – Feb. –March 2011 Planning:
How to Create A Pie Chart for Your Road Trip By: Tim Brockman.
Network Information System EML status of LTER sites Iñigo San GilSep IM meeting, Estes Park ‘06.
Network Information System EML status of LTER sites Iñigo San GilAug 5th 2005 IM meeting, Montreal ‘05.
Write a report on our meeting Products: – Video – LTERmaps application – ArcGIS Server LNO – Network news/data bits articles – Phase 2: Arcnews.
This is the iInterfolio site: Click on APPLY NOW FOR FREE.
Online Submission and Management Information -- Authors AMS Annual Conference / AMS WMC Click on play to begin show.
James M. Bennett High School Naviance Succeed Staff Presentation School Counseling Department.
1 Navigating the Letter of Recommendation Section on AMCAS For Medical School Applicants using the Letter of Recommendation Service provided by Lewis Associates.
Here is the log in for your control panel. Enter your user name, password and click Login.
Collaborative Project Database Margaret O’Brien, Corinna Gries, Wade Sheldon, Jonathan Walsh, John Porter, Sven Bohm, James Brunt, Suzanne Remillard, Ken.
CPSC 871 John D. McGregor Module 8 Session 3 Assignment.
3.1 CSC 102 Introduction to Information Systems Databases.
Long Term Ecological Research Network Information System LTER EML Status LTER Information Manager’s Meeting 28 July 2004 Mark Servilla
IPAWS Overview: FCC Notice of Proposed Rulemaking Mark Lucero, Chief Engineer IPAWS Division December 16, 2015.
06/17/2004 Simulation Meeting 1 H1 Monte Carlo Bookkeeping System B. Heinemann, A. Mehta University of Liverpool.
Network Information System Advisory Committee NISAC Activity Report 2007 LTER IM Meeting Wade Sheldon (GCE) Committee Co-chair.
UST Connect – Learn how to set up your profile and upload a resume. UST Connect is managed by UST Career Services. (713)
Online Submission and Management Information -- Authors
Wiki Wiki – A collection of web pages that can be edited by a group.
Journal of Mountain Science
NCJA ZoomGrants Overview Presented by: Lindsey Johnson
Huntington Beach High School
Status Report – IMC 2011 Wade Sheldon (GCE) & Sven Bohm (KBS)
Questioning: A Comprehension Strategy
Guides to Reviewerss Journal of Mountain Science Guides to Reviewerss
Questioning: A Comprehension Strategy
Eventbrite Step by Step
Huntington Beach High School
Administrator Created Artifacts
How to Select Colleges to Apply Through Naviance
Office 365 Login Instructions
Huntington Beach High School
Fort Bend ISD Mock Election 2012
Naviance & the College Application Process
Huntington Beach High School
Chapter 1 Introduction.
Kudler Fine Foods Frequent Shopper Program
Creating an account to keep you connected with the world
Huntington Beach High School
Query-by-Example Transparencies
Theory and Practice of Web Pedagogies 2/03/2004
HOW TO REGISTER YOUR ACCOUNT
Open the meeting, agenda, logistics, introductions
Presentation transcript:

Scope There are now two levels of Scope: Site and LTER. Site (as units are submitted) LTER (vetted by the Units committee) A unit will retain its individual site scope even when it is upped to the LTER

Vetting Send the list of custom units back to each site and ask if they still would like these entered in the database. Some sites will want to refine their definitions. Local PI's get input here. Committee of IMs (UDWG) to review all the submitted. A unit is 'vetted' when it takes into account the Best Practices. In the future, every 10 units input into the db, committee meets to vet.

To Do: Put the ~800 into the unitsdb (Oct 31) TODD, MARK Finish Best Practices recommendations - for both attributes and units (Oct 31) TODD, MARGARET, HAP, MARK, KAREN Send 'Test' group [ ARC, HBR, CCE, PAL, PIE, SBC, NTL, AND ] a set of their own units to review and resubmit, and reply with comments on the best practices (Nov 30) JIM, JOHN C, KAREN, MASON,JAMES, HAP, MARGARET, DAVE, SUZANNE. Determine easy method of getting units back from the sites (webform? Excel file?).

And then… Re-factor database for multiple levels of scope on a unit. Alter db schema as needed. MASON, JAMES Repopulate database with any reformed units received from the 'Test' group (same scope)‏ Send units to individual sites once this process is sorted out. EVERYBODY No end in sight - going to keep growing and growing (hopefully)