1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by.

Slides:



Advertisements
Similar presentations
Open Powerpoint and go to Slide Show in the top menu. Click VIEW SHOW. Then type in the white boxes. Type Name Date:
Advertisements

Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
On MICE Coordinate System Yury Ivanyushenkov RAL.
March 30, 2004 TJR1 MICE Upstream Particle Identification Tom Roberts Illinois Institute of Technology March 30, 2004.
MICE Engineering Integration Update August 13, 2003 Edgar L. Black IIT.
1 On MICE Coordinate System Yury Ivanyushenkov RAL MICE Collaboration CERN, 29 March - 2 April 2004.
The CKOV support By P Lau. Hall space available to the Ckov & TOF 0 Beam line 3.
MICE Collaboration Meeting March 29 - April 1, CERN MICE Integration Edgar Black/IIT March Room.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
1 RF Power infrastructure Andy Nichols, STFC – RAL MICE Collaboration Meeting, Harbin, 13-17th January 2009.
1 Infrastructure at RAL Iouri Ivaniouchenkov, RAL MICE Collaboration CERN, 29 March 2003.
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
UK Costs Beam & Infrastructure Coils Tracking Detector.
Phone meeting on PID Detectors 25 Jan 2006 Implementation of PID detectors in the general MICE layout By Wing Lau, Oxford.
MICE Collaboration meeting RAL 21 – 24 Oct 2005 Summary of Design & Safety review progress By Wing Lau – Oxford University.
MICE Collaboration Meeting at Frascati, Jun 26~29, 2005 PID Support Design Stephanie Yang.
Figure Figure 18-1 part 1 Figure 18-1 part 2.
Detector Systems Update MICO Feb 25, MICE Detector Systems  CKOV u CKOV installation planned during March shutdown u Cable issues resolved. Geneva.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
May 12, 2004 TJR1 Effects of Downstream Iron Shield Position on MICE Good- Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
1 times table 2 times table 3 times table 4 times table 5 times table
Main progress on Design & Safety Review: EmCAL -- Received the revised TRD write up from Ludovico Design & Safety Audit sheets need to be revised to correspond.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
Some of the best books of  &mid= A23D2FC75CD A23D2FC75CD7.
MICE PID & trigger Detectors MICE CM11, LBL Feb 12, 2005 for the PID team Bonesini, Cremaldi, Gregoire, Kahn, Roberts, Sandstrom, Summers, Tilley, Tonazzo,
‘Dude where's my muon?’ Trigger Efficiency of the Single Station. Edward Overton 1.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
A STEP BY STEP GUIDE TO ORGANIZING YOUR PAPERLESS NOTEBOOK FOR COLLABORATION Setting Up Your Digital Binder in OneNote.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
$100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300.
WHAT IS WORK?. Work when you exert a force on an object that causes the object to move some distance Work is done when the object moves in the same direction.
Tables Learning Support
ACCESS RESOURCES ON STUDENT SHARED USE CORBETT MATHS TO ACT ON TARGETS MAKE SUMMARY NOTES USE ADDITIONAL ONLINE RESOURCES Each AP has a matching revision.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
1 Project Infrastructure for steps I-III Tim Hayler, STFC – RAL MICE Collaboration Meeting, RAL, nd October 2008.
G.Barber: Summary of Mice Fibre Tracker Meeting FermiLab 8-12 March Developments during Tracker workshop Contents:- Revised Fibre Pitch Fibre Optic.
1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.
1 Implementation at RAL Iouri Ivaniouchenkov on behalf of Elwyn Baynham, Tom Bradshaw, Tony Jones, Jim Rochford Engineering Department, RAL MICE Collaboration.
Status of the MICE Construction Project
MICE PM Report Progress with the Infrastructure A few problems
Table Amortized cost: $3 Insert 5 Actual cost: $1.
Times Tables.
Click to add name of firm
برنامه‌ريزي منابع انساني
Click to add name of firm
Mexico 24 Hours Advance Manifest
Tables Revision Quiz Year 11.
Bear Project Title Name Class Date
Click Summary Value Button to Show Source of Integral or Time
CLICK TO START.
3 times tables.
6 times tables.
CLICK TO START.
Modified at -
Valentines Flip Book Presentation!
Thing / Person:____________________ Dates:_________________
Certification Individual Report
Lab Computer (5) Dr / Khaled Abd El Hamid.
Certification Individual Report

Call Now : Click : -
Call Now : Click : -
Call Now : Click : -
Presentation transcript:

1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by

2 Work carried out so far: Design audits: Beam line & target (needs further revision) Fibre tracker (TRD to be modified to insert book marks) Cherenkov 2 (complete) Iron Shielding (TRD to be modified to insert bookmarks) Safety audits: Cherenkov 2 (Done) Iron Shielding (Done) Beam line & target (needs further revision)

3 Work expected to be done before the next MICE Collaboration Meeting: Design audits: Engineering infrastructures Safety audits: Engineering infrastructures Fibre trackers

4 Example of the work done so far: For the table summarising the work done to date, click: For the example on Cherenkov 2 Design audit, click: on the corresponding box in that table.