1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x 1.025 in cross sections RF launchers bigger issue.

Slides:



Advertisements
Similar presentations
1 RF Workshop 16 th & 17 th April 2012 Design Layout Alan Grant, STFC.
Advertisements

Frame design Status TB-SWG May 2005 Presented by K. Ioki Prepared by M. Morimoto VV and Blanket Division, ITER Garching ITER.
Study of a Clearing Electrode at KEKB - First beam test - Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2008/3/3-61TLC08 Sendai.
RF Layout 3pi/2 for Discussion. 2 RF Design mtg 14/1/15 Output line from amplifier is lower than the PRY, needs to go high to clear PRY to couple to South.
NCSX Vacuum Vessel Overview Paul Goranson WBS 12 Manager Vacuum Vessel Manufacturing Study Kickoff meeting April 29, 2003.
WBS3 Diagnostics Planning Update Presented by B. Stratton with input from T. Brown, M. Cole, E. Fredrickson, R. Feder, P. Goranson, L. Guttadora, D. Johnson,
SOL Vacuum Vessel FS Shield Gap Thickness (cm) FW Gap + Th. Insulator Winding Pack Plasma ≥  ≥ 149 cm | | Coil Case & Insulator Blanket.
1 Configuration Development for HIF Final Focus Superconducting Quadrupole Array HIF Final Focus Meeting July 2, 2002 Tom Brown Chang Jun Phil Heitzenroeder.
Update of the ARIES-CS Power Core Configuration and Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
The shield block is a modular system made up of austenitic steel SS316 LN-IG whose main function is to provide thermal and nuclear shielding of outer components.
Status of the Power Core Configuration Based on Modular Maintenance Presented by X.R. Wang Contributors: S. Malang, A.R. Raffray and the ARIES Team ARIES.
11/26/2002Edgar L Black IIT MICE Video Conference November 27, 2002 Summary of safety implementation for proposal.
Maintenance Schemes For ARIES-CS X.R. Wang a S. Malang b A.R. Raffray a and the ARIES Team a University of California, San Diego, 9500 Gilman Drive, La.
MICE Collaboration Meeting March 29 - April 1, CERN MICE alignment, tolerances and supports Tuesday March 30 Room Edgar Black/IIT March17-
US ITER TBM Meeting Idaho Fall, Idaho, Aug M Dagher P Fogarty 1.TBM/ITER General Arrangement 2.Equatorial Test port Configuration 3.Test Port.
Update of the ARIES-CS Power Core Configuration and Maintenance X.R. Wang S. Malang A.R. Raffray and the ARIES Team ARIES Meeting Madison, Wisconsin September.
1 Presented at ColUSM by D. Ramos on behalf of the Cold Collimator Feasibility Study Working Group Longitudinal.
ASIPP EAST Overview Of The EAST In Vessel Components Upgraded Presented by Damao Yao.
THE PYTHAGOREAN THEOREM. PYTHAGOREAN THEOREM REAL LIFE EXAMPLE The following is a rule of thumb for safely positioning a ladder: The distance from the.
SCU Layout Concept - Minimal Segmentation Joel Fuerst (ANL) SCU 3-Lab Review Meeting Dec. 16, 2014.
ILC / ILD TPC Requirements of the support mechanics Volker Prahl ILD Workshop 2013 Cracow
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
1 WBS 1 Design Analysis Status NCSX Analysis Meeting Dec 3, 2003.
Defining the Vacuum Vessel Geometry NCSX Project Meeting November 27, 2002 Art Brooks.
1 Update of the injection test 06/2007 nEDM H. Gao, M. Busch, Q.Ye, T. Mestler, X. Qian, W. Zheng, X. Zhu Duke University And others in nEDM collaboration.
January 30, 2007 Exterior Magnets Concept Blanket and Vacuum Vessel Chamber Integration and Maintenance G. Sviatoslavsky, M. Sawan (UW), A.R. Raffray (UCSD),
1 Booster Corrector BPM Status AD/ Instrumentation Jim Fitzgerald.
Hall D Target Design Status Jim Fochtman- February 22, 2012.
DO NOW!!! (1 st ) 1.A rectangular prism has length 4 cm, width 5 cm, and height 9 cm. a) Find the area of the cross section parallel to the base. b) Find.
Andrew Moss ASTeC CM32 9t h February 2012 RAL MICE RF System.
NCSX VACUUM VESSEL PL Goranson Thermal Insulation Final Design Review July 31, 2006 WBS12 NCSX.
Step IV Construction North Side Walls and End Walls May 2015 Stephen Plate, Brookhaven National Laboratory.
November 12, 2001 C. Newsom BTeV Pixel Modeling, Prototyping and Testing C. Newsom University of Iowa.
NCSX VACUUM VESSEL HEATING/COOLING PL Goranson Preliminary Results February 17, 2006 MDL Testing of Coolant Tracing NCSX.
NCSX David Johnson August 18, 2004 Discussion of Co-Wound Flux Loops.
Study Plan of Clearing Electrode at KEKB Y. Suetsugu, H. Fukuma (KEK), M. Pivi, W. Lanfa (SLAC) 2007/12/191 ILC DR Mini Work Shop (KEK) Dec.
ARIES-CS Power Core Configuration Presented by X.R. Wang Contributors: Laila A. Ei-Guebaly, S. Malang, T.K. Mau, Richard Peiperty, A.R. Raffray and L.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
1 Collaboration Meeting 33 - Glasgow 26 th June 2012 Design Layout Andrew Moss for Alan Grant, STFC.
1 NCSX WBS HANDLING/SUPPORT UPDATE PLG 7/23/03 STATUS Study is for 120 degree VVSA field period assembly. Vessel Installation Support Concept.
NCSX B. Nelson for the NCSX Engineering Team NCSX modular coil cooling workshop June 10-11, 2004 PPPL NCSX Modular Coil Cooling Requirements and Initial.
December 13, 2006 Blanket and Shield Design Considerations for Magnetic Intervention G. Sviatoslavsky, I.N. Sviatoslavsky, M. Sawan (UW), A.R. Raffray.
2006 Oct. 19 DES Project -- Vaidas Simaitis, University of Illinois1 DHE – Detector Head Electronics Monsoon 80mm Crate Heat Shield.
June 10, 2004Modular Coil Winding & Cooling WorkshopJ.H. Chrzanowski 1 Modular Coil Cooling Issues With Baseline & Status of Cooling R&D James H. Chrzanowski.
Coordinate Detector: prototype design General idea about the Coordinate Detector (CDET) so far: Three independent vertical planes with 15 cm plastic shield.
1 PFC requirements  Basic requirements  Carbon based  Provisions for adding (interface design included in research prep budget)  NBI armor  Trim coil.
Surface Area Circles. Area of Circles How could we find the area of a circle?
Stellarator Core Machine Configuration NCSX Project Meeting Dec 19-20, 2000 B. Nelson, M. Cole, P. Fogarty P. Goranson, G. Jones, D. Williamson O AK R.
IDS120j WITHOUT RESISTIVE MAGNETS SEMGENTATION STUDIES FOR BP#2 WITHIN FIRST CRYOSTAT AND RIGHT FLANGE OF Hg POOL INNER VESSEL ( 20 cm GAPS AND 15.8 g/cc.
S1-Global status report KEK Norihito Ohuchi 2008/11/171ILC08-GDE-Meeting-Chicago.
1 First wall mods status NCSX SIT Meeting Aug 12, 2002 Points at 0, 30, 60 degrees from Art Points x and 1.00 in cross sections First try at vessel.
Page 1 CRYOMODULE 650 (TESLA Style) Stand Alone Tom Peterson and Yuriy Orlov Collaboration Meeting 25 Jan 2011.
1 NCSX radial build NCSX Project Meeting December 18, Modular coil build assumptions 2.Vessel build assumptions 3.FW/internal build assumptions.
MICE Prototype Coupling Coil Cooling Circuit Design Dan Cheng Lawrence Berkeley National Laboratory Coupling Coil Working Group January 28, 2014 January.
Low Beta Cryomodule Development at Fermilab Tom Nicol March 2, 2011.
1 NCSX VV Assembly Joint Issue B. Nelson 17 Mar 2005.
Installation Walkthrough Image Guide
Updates of the ARIES-CS Power Core Configuration and Maintenance
MQXC Nb-Ti 120mm 120T/m 2m models
Design of the Injection Can
RF Layout 3pi/2 for Discussion
LARP Vertical Test Facility
Requirements of the support mechanics
FP420 Detector Cooling Thermal Considerations
The 11T cryo-assembly: summary of design and integration aspects
Design of Distribution Feedbox at LHC P7
Hall C Down Stream Beam Pipe And Dump Interface Design
DCLL TBM Design Status, Current and future activities
CEPC-650MHz Cavity Cryomodule
IR Beam Transport Status
Presentation transcript:

1 First wall mods status NCSX SIT Meeting July 1, 2002 Points at 0, 30, 60 degrees from Art Points x in cross sections RF launchers bigger issue than trim coils

2 Model RF launcher locations, typ 6 places FW panels, 360 deg shown Modular coil partial assembly Vessel with insulation

3 Plan cross section 10 deg 0 deg 20 deg 30 deg 40 deg 50 deg 60 deg RF launcher locations Trim coils

4 Cross section at 0 degrees  Trim coils intersect this section  Almost all points are inside first wall

5 Cross section at 10, 20 degrees  Points not available yet  Trim coils intersect 10 deg section 20 deg 10 deg

6 Cross section at 30 degrees  Trim coils do not intersect this section  Closest approach to first wall

7 Cross section at 40, 50 degrees  Points not available yet  RF launchers intersect these sections 40 deg 50 deg Co-ax Faraday shield

8 Cross section at 60 degrees  Field joint and limiters are around this section  RF launchers on either side  Almost all points are inside first wall

9 Cross section at 60 degrees  Cross section changes abruptly  Limiter visible in this view  RF launchers on either side of this section mostly hidden by limiter limiter

10 RF launcher options  Reduce number of launchers to 4 instead of 6 per section  Less power?, unless strap lengths can be increased  Reduce coax to 4 inches instead of 6, maybe smaller  Move feeds farther out by running strap through “tunnels” to get straight-in shot at feed, but need more than 3 cm behind FW in these areas.

11 PFC panel / rib detail  Details for one concept for panel attachment developed with BFG Aerospace Plasma Vacuum vessel Heated / Cooled Rib Thermally insulated connection to vessel Panel installed Panel ass’y retracted