Stock Prep Class 3. Today Review No text books or theory P&ID’s for Waste system, #3pm Ticklers, Rejects system, 4 th stage cleaners 3D model Phases of.

Slides:



Advertisements
Similar presentations
Generic Pressurized Water Reactor (PWR): Safety Systems Overview
Advertisements

Antero Punttila Analyzing most typical energy saving measures Energy Efficiency of Steam and Condensate Systems Antero Punttila, Motiva Oy.
Unit 206: Domestic hot water systems
Biological waste water treatment
Intel Water Reclaim Project Final Report 5/25/05.
Household Waste Drainage Systems
UL/FM Fire Pump Systems Lunch & Learn 04/18/05
Cycle Stop Valves 1” through 16” 1 GPM to 10,000 GPM.
9645 TTCSI “I AM” SECONDARY SCHOOLS COMPETITION CHALLENGE 9645.
THE PROCESSING OF PALM OIL MILL MUTOHAROH
Energy Savings from Supplying Drinking Water at Two Pressure Levels - a Retrofit in Las Delicias, El Salvador, EWB-MAP Presented by Adam A. Brostow November.
Scavenging System  To reduce exposure to waste anesthetic gases  Can be active or passive scavenging system Active Scavenging System  Connected to a.
The DB In-Line Pumpout Unit Easy-to-use control panel with one switch to run the unit. 15 AMP reset fuse. 115 AC External water pump and tank drain have.
Unit 206: Domestic hot water systems
Nuclear Cookies Client: Idaho National Lab Project: Salt Removal.
Pump Installation Vigyan Ashram, Pabal.
Pump types and theory.
STEAM CONDENSERS.
HEATING AND AIR-CONDITIONING
Gold Table. Overview Water carries the crushed sample over the table top both disaggregating clumped material and providing a rough density separation.
Fuel Oil Systems Fuel Oil Systems consist of: Storage Tanks Pumps
Current status Arkadiy Klebaner November 21, 2012
COMPACT WASTE RECYCLING SYSTEM-ERS
Foundations of Real Estate Management BOMA International ® Module 3: Building Operations I Domestic Water ®
Distribution System Control Strategies.  Tank Management/Operations  Flushing  Rerouting Water  Others  optimizing existing booster chlorination.
Pump is Blue part (right) - timer is black (left side) New Electrical Outlet This Photo shows where the Re-Cir pump is installed on the Output line on.
STORAGE TANK LABELS Enforcement with Regard to Enhanced Vapor Recovery (EVR) Upgrades.
Glycol Pumps Operating Pressure: 100 to 2000 psi Circulation Rate: 3 to 450 gph.
Week 11. DIAMOND One More Thing to Build Prepare a One-Line Diagram for the electrical energy needs of your mining operation For energy needs met with.
CHAPTER 9 Copyright © 2007 Thomson Delmar Learning 9.1 Water Supply.
COMPACT WASTE RECYCLING SYSTEM-ERS
FILTRATION Presentation on FILTRATION. Introduction What is filtration? Why is filtration important? What are filter media? Can you name different types.
ZERO LIQUID DISCHARGE IN RCF BASED PAPER MILL A CASE STUDY A CASE STUDY VAIBHAV PAPER BOARDS PRIVATE LIMITED Vapi, Gujarat. Presented By Mr. Suresh C.
Presentation on on LIQUID PACKAGING BOARD “”TETRAPAK””” PROCESSING - Recovering Fiber out of Waste By VENKATRAMAN GOKULAKRISHNAN Date: 06 th August, 2015.
CE 3372 Water Systems Design EPA-NET Pumps, Valves, Tanks.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
P&ID’s PIPING & INSTRUMENTATION DIAGRAMS.
Wastewater Treatment. Waste water is collected in a sewer system (a series of underground pipes that carry water to facility) Waste water is collected.
Cryo AIP Muon Campus AIP Review Arkadiy Klebaner January 23, 2012.
CORK GLASS LTD. Introduction Cork Glass have 8 machines that use either fresh or recycled water as a coolant as part of the production process. This created.
Water-Saving Devices For each slide, discuss this question with your partner. What do you think these devices are used for? How does it save water?
Monday – VSP Room weekly checks Visually Check: Hvac system for leaks & valve settings Fresh water system for leaks & valve settings VSP linkage Autopilot.
1 LBT Q Engineering Review PLMG: Plumbing, includes IC system, chiller systems, instrument lab cooling, and LUCIFER cryo-compressor cooling.
Vessel Wash Wastewater Management – Options for Marinas Presented by: Michael J. Danko New Jersey Sea Grant Consortium Virginia Marine Trades Conference.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
Existing System The system originally operated with everyone having 24-hour availability. The village then created a 3-day rotation which improved the.
Electricity | Natural Gas | Water | Wastewater Adding Whey for Denitrification Dale Adams, P.E Managing Engineer, Colorado Springs Utilities September.
Pulp Mill Operator Training Class 3
Pulp Mill Operator Training Class 4. Review Refiner Feed Tank 05-PF Screen Feed Tank 05-PF Washer stock and showers 05-PF Washer.
Stock Prep Summary Stock Prep (HD – Machines) – Phase 1: Secondary refiners to series operation and recirculation Piping, tie ins, order of preparation,
Paper Machines Stock Prep Class 2 P&ID’s Blend Chests Through Machine Chests.
Last Week of Project Terry A. Ring. Project Schedule.
Solving tomorrows problems TODAY VacJetSolving tomorrows problems today Waste Matters Nig Ltd.
Unit 209: Drainage systems
2 nd presentation by Patricia REVERSE OSOMOSIS :the possible solution for water hardness.
Unit 209: Drainage systems
WSHP Systems 1.
ACTIVE SOLAR DESIGN ALTERNATIVE ENEGRY SOURCES.
Review Questions Chapter 5
Oil Pastel Landscape Drawing 1.
Introduction to pipe sizing for high rise buildings
COMPONENTS OF SOLAR WATER HEATER
Private Fire Hydrant. Fire hydrant systems (also known as fire pumps, hydrant boosters, fire water pumps) are high pressure water pumps designed to increase.
Student CD for Commercial Refrigeration for A/C Technicians Chapter 12 Ice Machines.
Heart Lung Machine Lecture (9).
Forced draft cooling tower. NumberingEquipment A-1Storage Tank B-2Temperature sensor C-3Pump D-4Ball valve E-5Rotameter F-6Cooling water from the tank.
CHAPTER 2 Description of Chemical Processes
1 INTERNATIONAL MARITIME COLLEGE OMAN PROCESS TECHNOLOGY & SYSTEMS (TPTS & PT-TPTS) PE (TPTS & PT-TPTS) (Chapter-3) Chapter - 3 Distillation Systems Textbook.
PATENTED FIVE-STAGE AUTOMATIC BLENDER CLEANING!
INTRODUCTION ALAQUA is a US corporation. We manufacture process equipment. Our engineers have over 20 years experience in the engineering of sanitary and.
Presentation transcript:

Stock Prep Class 3

Today Review No text books or theory P&ID’s for Waste system, #3pm Ticklers, Rejects system, 4 th stage cleaners 3D model Phases of installation. Particularly upcoming secondary refiner work

Review Class 1 we covered series and recirc refining in general. P&ID’s of LD chest into each of the 3 refiner lines (3 p&id’s) Class 2 we covered the Blend Chests – Ticklers – machine chests of each machine (6 p&id’s). We also discussed the design and purpose of blending Class 3 – we have remaining p&id’s to cover: Waste, Rejects, 4 th stage cleaners, consistency dilution tank, HD tower

Review Draw stock prep starting at HD What is our naming and why What is our design and why What are main control points of series refiners – Total flow – HPD/T – Level What are flow controls that aren’t refiners – Broke into blend chest – Waste into machine chest

Waste system Waste P&ID Waste needs refining, but needs separate refining #4 sprout becomes waste refiner (with backup valving as #3pm tickler) Think about your total flows on ticklers without recycle Controls, very similar to every other refiner we have discussed. The exceptions are this is 1 refiner, it has dual purpose as back up tickler, it has to feed 2 different tanks (#1, #3 machine chests), it has back up pump capability. Piping and valving gets busy and complicated looking Total tonnage and flow capacities and why What capabilities do we lose 3D model

Rejects System Rejects and 4 th Stage Cleaner P&ID No longer have shives, no shives = no need to refine them separately You have concentrated sand. Run cleaners thinner and get more concentrated sand Add 4 th stage cleaner to further concentrate sand and dump the sand out of the system Thin, thin, dump sand, accepts to broke

4 th stage cleaners Show brochure 2 cleaners side by side, valves in and out and bypass Intermittent dump (2 dump valves like a junk trap on bottom) Dumps into a dry hopper outside

Consistency Water Consistency dilution tank P&ID This converts the current washer feed tank (stock storage tank) into a white water tank 2 vfd pumps. One becomes hd dilution, the other becomes consistency dilution. Both control header pressure with vfd Like a larger version of 1p10 Fill it with multiuse WW

HD tower HD tower P&ID No big news, just review No pulp mill chest, no refining, just transfer from HD to LD

Phases of installation Phase 1 = secondaries – #2,#9 refiners in series and recirc and into machine chest – #3,#1 refiners in series and recirc and into machine chest Phase 2 = #3pm machine chest – Ticklers in series and recirc, remove stuffbox, use new tank/agitator, vfd on machine chest pump Phase 3 = #1pm blend chest,machine chest – Ticklers in series and recirc, remove stuffbox, use 2 new tanks/agitators, vfd on machine chest pump, but still sharing #3pm blend chest

Phase 1 #2 and #9 in series is doable. Do it first – Run feed piping to #2 and keep it running – Run piping from 2 to 9 and then connect it one day – Hook #1 sprout back into old line and it can run by itself #3, #1 in series is a little tougher. Do it second – Run feed piping to #3 and keep it running – Run piping from 3 to 1 area and on to machine chest – Tie in #3 by itself – Demo #1 piping and reconnect it Working through these details now. Piping arrives 4/24, they hire pipe fitters/welder 5/1 or so, Lots of activities and scaffolding coming to the wet ends of the machines in about 1-2 weeks. Daily permits, scaffolding to avoid, downtime, tie ins, temporary operation

3D