Vermont Solar Development Pathways Fifth Stakeholder Meeting December 16th, 2015 Middlebury, VT.

Slides:



Advertisements
Similar presentations
Demand Response: The Challenges of Integration in a Total Resource Plan Demand Response: The Challenges of Integration in a Total Resource Plan Howard.
Advertisements

Project 1.3 Status Monitoring, Disturbance Detection, Diagnostics, and Protection for Intelligent Microgrids Dr Wilsun Xu C. Jiang,
DISPUTES & INVESTIGATIONS ECONOMICS FINANCIAL ADVISORY MANAGEMENT CONSULTING Early Lessons Learned from DOE-EPRI Framework Experience Melissa Chan MA DPU.
Introduction Build and impact metric data provided by the SGIG recipients convey the type and extent of technology deployment, as well as its effect on.
Planning, optimization and regulatory issues
How Technology will make Renewable Energy Competitive 10/17/2013
Document number Finding Financial Solutions & Models for Microgrids Maryland Clean Energy Summit Panel Wednesday, October 16, 2013.
Dynamic Distribution Grids © 2012 San Diego Gas & Electric Company. All trademarks belong to their respective owners. All rights reserved. Neal Bartek.
Vendor Briefing May 26, 2006 AMI Overview & Communications TCM.
ANALYTICS: BRINGING VALUE TO THE UTILITIES IN MITIGATING ENERGY LOSSES José-Manuel LOPEZ Istanbul, May 9, 2014.
From IT to ET: A Critical Time 從 IT 邁向 ET 的關鍵時刻 Jyh-Yih Hsu ( 許志義 ) Professor Department of Management Information Systems Department of Applied Economics.
SmartGridCity™: A blueprint for a connected, intelligent grid community Presented to the Utah Public Service Commission May 13, 2009.
1 Grid Modernization – A Strategic Imperative for 2050 Advanced Energy Conference May 1, 2013 By Carl Imhoff Electric Infrastructure Sector Manager Pacific.
Workforce & Engineering Design Optimization Plenary Session: Enterprise Resource Planning for Infrastructure and Utilities Gurgaon India Feb GIS.
1 Pacific Gas & Electric Company MTS: Evolution of the Electric Distribution System Manho Yeung, Senior Director, System Planning and Reliability PG&E.
Vermont Solar Development Pathways Stakeholder Kickoff Meeting March 6, 2014 Montpelier, VT.
John B. Wharton, PE Technical Executive Baltimore, Maryland October 16, 2013 Perspectives on Grid-Integrated Microgrids Maryland Clean Energy Summit.
Smart Grid & Microgrid R&D
American Electric Power (AEP) Virtual Power Plant Simulator (VPPS) Tom Jones, Manger – Corporate Technology Development American Electric Power Grid-InterOp.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
DOE’s Smart Grid R&D Needs Steve Bossart Energy Analyst U.S. Department of Energy National Energy Technology Laboratory Materials Challenges in Alternative.
Regional Technical Forum End-use Load Shape Business Case Project Project Initiation Meeting Portland, OR March 5, 2012.
Presentation Identifier (Title or Location), Month 00, 2008 West Virginia Smart Grid Implementation Plan Preliminary Results Steve Bossart Director, Integrated.
Common Information Model and EPRI Smart Grid Research
BNL’s Grid and M icro-Grid Efforts and Capabilities Patrick Looney Chairman, Sustainable Energy Technology Long Island Solar BNL.
FERC’s Role in Demand Response David Kathan ABA Teleconference December 14, 2005.
An Overview of the Smart Grid David K. Owens Chair, AABE Legislative Issues and Public Policy Committee AABE Smart Grid Working Group Webinar September.
What’s Next in Transitioning to a Modern Grid Steve Bossart, Senior Energy Analyst IEEE EnergyTech 2013 May 23, 2013 Cleveland, Ohio.
Frankfurt (Germany), 6-9 June 2011  Authors: Reinhard BREHMERWIEN ENERGIE Stromnetz GmbH - Austria Thomas SCHUSTERWIEN ENERGIE Stromnetz GmbH – Austria.
67th NECPUC ANNUAL SYMPOSIUM Whiz Bang New Stuff June 17 th, 2014.
Brussels Workshop Use case 3 11/09/2015 Mario Sisinni.
Frankfurt (Germany), 6-9 June 2011 Iiro Rinta-Jouppi – Sweden – RT 3c – Paper 0210 COMMUNICATION & DATA SECURITY.
2011 International Wind-Diesel Conference March 9, 2011 Remote System Architecture: Designs and Concepts Jito Coleman TDX Power.
Vermont Solar Development Pathways Fourth Stakeholder Meeting October 6th, 2015 Montpelier, VT.
DREAM November Meeting. Agenda Introduction and Expectations Path to becoming a Resource Node – ERCOT Registration process for non-modeled resources –
Overview and Status of Distributed Energy Resources Policy Docket Jay Griffin, Chief of Policy and Research Hawaii Public Utilities Commission August 4,
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Page 1 Pacific Northwest Smart Grid Demonstration Project  Largest Smart Grid Demonstration.
Dinosaurs, Death Spirals and Digitization: The utility world as we know it is ending – Or is it? Dave Warren Energy Services Director Washington PUD Association.
Office of Electricity Delivery & Energy Reliability Consumer Engagement in an Advanced Grid Joseph Paladino NASUCA 2015 Annual Meeting Austin, TX November.
Vermont Solar Development Pathways Second Stakeholder Meeting April 3, 2015 Rutland, VT.
CEC Project “Distribution System Aware Vehicle to Grid Services for Improved Grid Stability and Reliability” Sunil Chhaya Principal Investigator.
Smart Grid Schneider Electric Javier Orellana
Transforming the Distribution Grid
More Than Smart – A Distribution System Vision © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. Dave Geier – VP Electric.
Active Network Management 1 Grid Modernization Solutions.
CEC Public Workshop Order Instituting Informational and Rulemaking Proceeding (08-DR-01) March 3, 2008.
Metering Americas April 24, 2006 Advanced Metering.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
Institutional Support Vladimir Koritarov Argonne National Laboratory April 2016.
Connecticut Department of Energy and Environmental Protection.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
Portland State University Smart Grid Class Enabling active consumer participation 20 April 2009 Presentation: History Politics Economics Technology.
© 2015 Electric Power Research Institute, Inc. All rights reserved. Haresh Kamath Program Manager, EPRI Building California’s Flexible Grid October 27,
DER Provide Grid Services for the 21 st Century Electric System Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy More Than Smart Conference.
Workshop February 4, Idaho Power Smart Grid Vision At Idaho Power, our smart grid vision remains focused on seven major characteristics : 1.Enhance.
A smart grid delivers electricity from suppliers to consumers using two-way digital technology to control appliances at consumers' homes to save energy,
Locational Net Benefit Analysis Working Group
August ICA Agenda Time Topic 8:00 – 8:15
STANDARDS AND THE FUTURE OF DISTRIBUTED ELECTRICITY
Subteam 1a Competitive Solicitations Framework Working Group Meeting
The Management of Renewable Energy
Q Action on Grid Modernization, Energy Storage, and Utility Reform
Sahar Rahim MS-Electrical Engineering Supervisor: Dr. Nadeem Javaid
Opportunities in the Changing Energy System
H.O.M.E. Home Organization and Monitoring of Energy
Karen Bartleson, President, IEEE Standards Association
Integrated Distribution Planning Process
2500 R Midtown Sacramento Municipal Utility District
DC National Grid Modernization Trends NC DEQ Clean Energy Plan Workshop #3 April 22, 2019 Autumn Proudlove Senior Manager of Policy Research NC Clean.
The Status of State Grid Modernization Efforts
Presentation transcript:

Vermont Solar Development Pathways Fifth Stakeholder Meeting December 16th, 2015 Middlebury, VT

Today’s Agenda 1)Welcome, Introductions9:00 – 9:15 Christine Donovan, Moderator 2)Priority Analyses 9:15 – 10:30 David Hill, Principle Investigator 3)Break10:30 – 10:45 4)GMP’s Solar Map10:45 – 11:45 Kim Jones and Dan Belarmino 5)Next Steps and Adjourn11:45 – 12:00 Christine Donovan, Moderator

Vermont Solar Development Pathways Priority Analyses

Distribution Circuits and Capacity: Capacity transparency and NEM interconnection processes What metrics are used to establish capacity limits and reliability? How are they used and/or shared with users? How is available capacity reflected application process? How is an incremental cost of expanding capacity estimated? Do customers have the option to address capacity constraints or reliability issues? –Strategic locations –Advanced inverter capabilities –Storage –Load shaping services Green Mountain Power 2015 Solar Map

1.How do utilities differ in how they estimate and apply capacity limits? Are there cases where cap isn’t met but specific applications raise a problem? Are types of feeders differentiated by type, management priorities, etc.? Are circuits differentiated by location, proximate substations, voltage, system stiffness, etc.? 2.What tool do utilities use to support their capacity limits analysis? Would a case study be useful to test the validity of tools be useful? Photo by Patrick Finnegan. South Prairie Substation, LV side. Distribution Circuits and Capacity: Capacity transparency and NEM interconnection processes

Demand Response and Storage Customer end user 1.Demand Response (appliances, home energy systems, etc.) 2.Storage (electrochemical – e.g. Powerwall) Distribution circuit – smart inverters Substation level – grid scale storage Utility level 1.Weather forecasting (e.g. Deep Thunder) 2.Rate structuring 3.Advanced metering infrastructure (AMI) 4.Systems communication (e.g. OpenADR, SEP 1.1 & 2.0) ISO level 1.DERPs – CA – Distributed Energy Resource Providers Tesla Motors. A Computer Generated Image of the Tesla Powerwall. Digital image. Wikipedia. N.p., 1 May Web. 8 Dec Poffenberger, Aaron. Smart Meter. Digital image. Flickr. N.p., 5 Nov Web. 8 Dec Luzier, Margaret. The Seneca Pumped Storage Generating Station reservoir. Digital image. Wikipedia. N.p., 18 Oct Web. 8 Dec

Demand Response and Storage Classification Distributed Energy Resources (DERs) Generation Demand Response Dispatchable Non- Dispatchable Storage Dispatchable Non- Dispatchable

Demand Response and Storage Discussion

GMP Solar Map Project by:

Challenges in DG Siting

Objective and Goals Transparent DR Interconnection in GMP’s electrical distribution system by making the technical grid information available to developers  The Project will:  Enable optimal siting of DR while reducing interconnection cost and project lead time  Improve GMP’s efficiency and accuracy on DR interconnection analysis

Solar Map

Automated DR Screening

Automated DR Screening and Solar Map  Visual display of all GMP distribution circuits with table showing pertinent grid information, necessary for evaluation of interconnection.  Complete Capacity load flow analysis for each protective zone in a circuit; screening specific locations to assist developers in determining the maximum generation that can be added for potential interconnection.

Other Potential Benefits  GMP Planning and Operations  Identify circuits/areas with infrastructure constraints (i.e. interconnection capacity)  Infrastructure upgrade deferral  Microgrid implementation  Quantify the benefits of Distributed Energy Resources

Vermont Solar Development Pathways Next Steps

Finalize scope of priority analyses Research and analysis in small teams Presentation of results at next large meeting in late March

For More Information General questions on project Objectives, scope, timing and scenario modeling David Hill: Damon Lane: Focus area logistics, issues or topics Focus Area Leads Suzanne Elowson: Carl Linvill: David Roberts: Ingrid Malmgren: Peter Schneider: Jake Marin: Li Ling Young: Ethan Goldman: Nick Lange:

Thank You!

Shawn Enterline, GMP

Vermont Demand Net of Solar