UPDATE ON STORAGE ISSUES IN ERCOT: MOVING FORWARD? March 1 st, 2016 Cyrus Reed, Lone Star Chapter, Sierra Club.

Slides:



Advertisements
Similar presentations
NARUC The 21 st Century Grid 1 Energy Consumption Ancillary Services Traditional Power Generation Solar Generation Commercial and Industrial Transmission.
Advertisements

Installing Generation - Behind the Meter Chris Rogers Sega, Inc. November 6, KMEA Annual Conference.
A Solar Generation Forecasting System for ERCOT Where Would the Data Come From? Jay Zarnikau | President Steve Wiese | Senior Consultant, Energy Efficiency.
SMUD Sustainable Energy Supply Progress in Carbon Reduction POU 101: CMUA Briefing of Legislative Staff February 26 th, 2015 Obadiah Bartholomy Powering.
Meeting with Rep. _______________ Solar Industry Representatives May 5, 2010.
1 Regulatory Developments and Impacts Involving Electricity Storage in Texas Elizabeth Drews 31 st USAEE/IAEE North American Conference Austin TX, November.
Energy Storage Definitions/Definitions ETWG 18 Feb 2013.
Economic Criteria for Transmission Planning in the ERCOT Region Public Utility Law Seminar DeAnn Walker August 3, 2012.
WECC PCC Meeting Salt Lake City, UT March 26, 2014.
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Susan Covino Senior Consultant, Emerging Markets March 31, 2015
ERCOT PUBLIC 8/19/ LTSA Scenario Results Updates August, 2014.
Advanced Technologies in the Texas Electric Market
North American Electricity Markets APEX Paris, France October 15-16, 2007 Kenneth Laughlin, PJM.
1 Enhancing the Role of Renewable Energy in California Robert A. Laurie Commissioner California Energy Commission Geothermal Resources Council Annual Meeting.
Energy Policy Levers. 2 State as a Taxing Authority Income tax credits or deductions Income tax credits or deductions Residential Alternative Energy Tax.
Energy storage innovation: technology + policy Dr Jonathan Radcliffe University of Birmingham & Centre for Low Carbon Futures.
GE Energy Asia Development Bank Wind Energy Grid Integration Workshop: Issues and Challenges for systems with high penetration of Wind Power Nicholas W.
Long Term Study Task Force Update to ETWG ERCOT Long-Term Study: Scenarios, New Software, and Emerging Technology Assumptions January 27, 2012.
Energy and Economy Transition California’s energy system to a highly efficient, renewables-based system and electrify transportation.
The Policy Voice for Energy Storage Bulk Energy Storage for the Nation’s Electricity Grid Jason Makansi, Executive Director President, Pearl Street Inc.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Overview of the North American and Canadian Markets 2008 APEX Conference in Sydney, Australia October 13, 2008 Hung-po Chao Director, Market Strategy and.
FERC Assessment of Demand Response & Advanced Metering 2006 APPA Business & Financial Conference September 18, 2006 – Session 11 (PMA) Presented by: Larry.
ETAAC Energy Sector Energy Storage Smart Grid July 12, 2007 San Francisco, CA.
ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE Emerging Technology Working Group, September 17 th, 2015 Cyrus Reed, Lone Star Chapter, Sierra.
E P D K 1 Turkish Electricity Market and Recent Developments Cemal Çelik Energy Expert EMRA-TURKEY March ANTALYA.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
The Texas Renewable Energy Program National Governors Association Scottsdale, Arizona April 29, 2004.
Jenell Katheiser Doug Murray Long Term Study Scenarios and Generation Expansion Update January 22, 2013.
Current DG Framework for Competitive Areas of ERCOT DREAM TF September 28, 2015.
1 New England Demand Response Resources: Present Observations and Future Challenges Henry Yoshimura Demand Resources Department ISO New England, Inc. Holyoke,
ISO Outlook Summer 2005 and Beyond Senate Energy, Utilities and Communications Committee February 22, 2005 Jim Detmers Vice President of Grid Operations.
K E M A T & D C O N S U L T I N G Power System Conference, Clemson, South Carolina, March 8-11, 2005 Principles and Issues Relating to the Interconnection.
Emerging Technologies Integration in ERCOT 2012 ERCOT Operations Seminar Mark Bruce Principal Stratus Energy Group.
Wholesale Market Subcommittee Texas Interconnection Long-Term Study Update Warren P. Lasher April 8, 2011.
Demand Response: What It Is and Why It’s Important 2007 APPA National Conference San Antonio, Texas June 26, :00 a.m. to Noon Glenn M. Wilson Director.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations May 8, 2012 – COPS Meeting May 9, 2012 – WMS.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
Promoting Distributed Generation Resources Through State Initiatives Ed Ethridge Public Utility Commission of Texas Distributed Resources in Restructured.
Should CDR or SARA be Adjusted to Better Account for EE, DR and DG? Cyrus Reed DSWG September 21, 2012.
Long Term Study Scenarios and Generation Expansion Update October 12, 2012.
ERCOT MARKET EDUCATION Retail 101. Legal Disclaimers and Admonitions PROTOCOL DISCLAIMER This presentation provides a general overview of the Texas Nodal.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
ERS Update – DSWG Presentation September 21, 2012.
Updated 1/28/2011. Renewables Integration Plans and Challenges March 8, 2011 Jay Caspary ·
BI Marketing Analyst input into report marketing Report TitleElectricity in Texas Report Subtitle State profile of power sector, market trends and investment.
Impacts of Environmental Regulations in the ERCOT Region Dana Lazarus Planning Analyst, ERCOT January 26, 2016.
“Managing the Integration of Energy Storage Technologies” Kenneth Ragsdale ERCOT.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
ERCOT PUBLIC 5/20/ LTSA Current Trends Scenario Results May 20,2014.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations June 27, 2012 – ETWG Meeting.
Renewable Energy Innovation In Canberra Jon Sibley Director, Energy and Waste Policy Environment and Planning Directorate.
2016 LTSA Update Doug Murray 6/21/2016. Agenda Introduction Scenario Retirement Process Scenario Summary Results Appendix.
1 Energy Storage Settlements Consistent with PUCT Project & NPRR461 ERCOT Commercial Market Operations November 2, 2012 – RCWG Meeting.
This project has received funding from the European Union’s Horizon2020 research and Innovation programme under grant agreement No
RENEWABLES AND RELIABILITY
2018 LTSA Workshop August 2017 RPG Meeting Welcome to.
Asia-Pacific Energy Regulatory Forum
Energy storage = flexibility
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
A Midsummer Night’s DREAM
Energy Storage Settlements Consistent with PUCT Project & NPRR461
31st USAEE/IAEE North American Conference
The Need for Compensatory Standby Rates
Solar Energy Commercialization
July update JANUARY 2019.
Presentation transcript:

UPDATE ON STORAGE ISSUES IN ERCOT: MOVING FORWARD? March 1 st, 2016 Cyrus Reed, Lone Star Chapter, Sierra Club

STORAGE MAKING STRIDES IN ERCOT AND USA  Storage Growing Nationwide  New Laws and Rules in Texas  New Federal and State Funding  Technology & Costs Improving  Ancillary Services – from Fast Regulation Services to Fast Frequency Response? Enhanced vs. Future AS?  Synchronous Inertia Service?  Latest Long-Term Assessment points out storage future  DREAM Update for Storage  The Real McCoy – As Reliability Feature in Transmission Planning?  Next steps ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 3

PROJECTS OPERATING ACROSS THE U.S. 4 Several MW-scale projects have 5+ years of operations Source: DOE Global Energy Storage Database

CURRENT TRENDS IN THE US MARKET ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 5 Annual installation expected to reach 850 MWs by nd Quarter 2015 highest ever; in Texas – AEP and Duke projects make up most of capacity Source: GTM Research US Energy Storage Monitor

COSTS EXPECTED TO CONTINUE FALLING 6 Navigant: 4-hr battery install cost as low as $700/kW by 2020 Oncor: $350/kW install cost by 2020 Morgan Stanley: battery- only costs as low as $125/kW to come Tesla: Li-ion battery-only cost $110/kWh already Source: Energy Storage Association, 2015

STUDIES SUGGEST STORAGE GRID PARITY IS ALREADY CLOSE TO PEAKER PLANT  Citigroup January 2015 Study expect battery storage to fall to $230/MWh by 2020 and $150/MWh by 2030  Other studies are more optimistic in falling costs  Lazard November 2015 Storage Analysis finds current battery technology (zinc, lithium-ion and flow batteries) are currently at $220 to $320 per MWh, while Compressed Air Energy Storage technology currently can generate a MWh for $190  Lazard report suggests lithium-ion batteries will decrease capital costs by 47% and flow-batteries by 38% within five years (2020), and levelized cost at $190 per MWh.  PNLL 2013 National Assessment of Energy Storage found that flywheels, salt batteries, pumped hydro and demand response competitive with peaker plants now, and that lithium and flow batteries would beat peakers by 2020 in ERCOT and Western Grid as more renewables come on-line as balancing resource  BNEF forecasts that total installed energy storage in US will reach 3 GW within 7 years, while Navigant forecasts up to $3 billion industry by 2022  Brattle study for ONCOR suggested up to 5,000 MWs of storage possible in ERCOT ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 7

CURRENT/PROCURED UTILITY-SCALE STORAGE Utility/CompanyAmountUse Southern Ca. Edison260 MWsVariety, including 100 MW Transmission-Tied to provide 3-4 hour peak replacement AEP4 MWPresidio Texas emergency needs at end of line Duke Energy (NoTrees)36 MW Lead-Acid Battery but being replaced with Lithium-Ion Mainly for fast regulation service - co-located with wind farm Austin Energy1.3 MWs Lithium-Ion BatteryTo be tied to community solar farm AES Energy Storage20 MWProposed in DallasAirport area – mainly ancillary services but also some energy use Austin EnergyUp to 170 MWs RFIRFI to see potential of utility- scale storage for peak shaving, capacity, ancillary services, etc APEX317 MWs Compressed Air Energy Storage Proposed for ancillary and capacity in Anderson County – has interconnection agreement ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 8

SOME MUNICIPAL UTILITY EFFORTS  See Previous page for Austin Energy  CPS ENERGY issued RFP for up to 50 MW of local storage  Pedernales beginning On-Bill Financing “to qualifying residential and commercial members seeking to install photovoltaic and battery storage systems connected to the Cooperative's distribution system.”  Denton City Council has told Denton Municipal Electric to hire a third- party consultant to review the Denton Renewable Plan – a 70 percent renewable, 13% quick start gas unit plan – and also assess alternatives to quick start gas plants, including storage and DR ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 9

 “Given the significant benefits that storage can bring to the system as a whole, enabling cost-effective investments in energy storage will require a regulatory framework that helps investors capture both the wholesale market values and the T&D system values associated with the storage devices.”  The Value of Distributed Electricity Storage in Texas, prepared by Brattle Group for Oncor, November 2014Value of Distributed Electricity Storage in Texas 10 CONCLUSIONS FROM THE TEXAS MARKET

CURRENT LEVELIZED COST OF ENERGY FROM LAZARD TechnologyLow-Cost, 2015 ($s/MWh)High-Cost, 2015 ($s/MWh) Solar PV-Thin Film Utility Scale 5060 Solar Thermal with Storage Wind 3277 Energy Efficiency 050 Battery Storage, Flow Battery Battery Storage, Lithium-Ion Battery Storage, Sodium Battery Battery Storage, Zinc Battery Storage, Lead-Battery 4191,247 Compressed Air Energy Storage Diesel Reciprocating Engine Natural Gas Reciprocating Engine Gas Peaking ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 11

ENERGY STORAGE AS FLEXIBILITY RESOURCE 12

ENERGY STORAGE AS CAPACITY RESOURCE 13

STORAGE IN ERCOT READY FOR PRIME- TIME  LEGISLATURE  SB 943: Texas Legislature enacted legislation (Utility Code ) in 2011 that clarifies that energy storage facilities that wish to participate in competitive market are “generation assets” that must register with PUCT  Entitles such Energy Storage facilities to interconnection, to obtaining transmission service and participating in wholesale energy market  2009 and 2013 Separate legislation created new fund as part of TERP – Texas Emissions Reduction Plan – that allow grants for storage projects connected to renewables in air quality affected counties  Funded one round in ; Another round coming up in 2016 with applications due February 16, 2016  Austin Energy 1.3 MW battery/community solar project being funded partially with TERP funds ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 14

WHAT IS DRIVING STORAGE IN ERCOT  PUC  Project no  (1) PUC Substantive Rule  Wholesale storage is exempt from transmission service rates and wholesales storage load is excluded from ERCOT’s 4CP demand calculations (2) PUC Substantive Rule (m) Defines Wholesale Storage –and states that the wholesale storage is wholesale load Treated as other generation facilities in the sale of energy and ancillary services at wholesale Energy acquired to charge a storage facility is wholesale – not subject to retail tariffs, rates or fees or with other ERCOT charges and credits because of ancillary obligations or load share ratios Settlement prices at the Node if transmission-connected, and at the nearest electrical bus node if distribution level connected If wanting to go between ERCOT and another ISO need FERC statement that will not impact ERCOT independence ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 15

PUC & ERCOT PAST CONTINUED  Project No  Allows ERCOT to conduct pilot projects and grant temporary exceptions from ERCOT rules  ERCOT  NPRR No. 410 (2011) – Definition of ESR (Energy Storage Resource) and Creation of an Energy Storage Load Zone for Each ESR of 1 MW or more in a way similar to DC ties  This NPRR did not move forward due to some opposition and the belief that separate PUC rule had dealt with issue  NPRR No. 461 (2012)– Implements PUC Rulemaking by allowing batteries, flywheels, CAES, pumped hydro and capacitors to enjoy Wholesale Storage Load provisions  NPRR 560 (2013) -- created a definition of Energy Storage Resource and specifies values for the various caps and floors used in the mitigation and make-whole calculation processes for such Resources.  NPRR 581 (2013) – Created a new ancillary service subset of Regulation Service known as Fast Responding Regulation Service ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 16

FEDERAL GOVERNMENT ALSO CHIPPING IN WITH LOAN GUARANTEES AND GRANTS  Through Energy Efficiency and Renewable Energy Office at DOE there are literally hundred of grants and loan opportunities   Recent SHINE Grant – gave out $15 million to utilities looking at pilot programs to combine distributed solar with storage Austin Energy just received $4.3 million to pilot two battery storage facilities with onsite solar in Mueller development in Austin. ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 17

ENERGY STORAGE CAN BE MANY THINGS 18

NUMEROUS APPLICATIONS ON THE GRID 19 Source: DOE/EPRI Handbook

CURRENT DISCUSSION ON STORAGE IN ERCOT’S ANCILLARY SERVICES  NODAL PROTOCAL REVISION REQUEST 752 –ENHANCED ANCILLARY SERVICES  More modest proposal than 667 – does include Fast Frequency Response though maintains a 1:1 Ratio  Maintains Fast Regulation As Well allowing for trading among QSEs  Nodal Protocol Revision Request 667 – Future Ancillary Services FAST would open up space by dividing responsive reserves into several products, and continuing an emphasis on fast regulation and fast responsive service (Fast Frequency Response) Brattle Group analysis found battery storage would take up to some 7 % of FFR market by 2024 Creates a ratio between primary frequency and fast frequency response that is up to 2.2 to 1. Continues Fast Regulation Service Creates new contingency and supplemental reserves that replace more traditional spinning and non- spinning for capacity ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 20

ANCILLARY SERVICES CONTINUED  FAS is more favorable to storage than Enhanced, but both would open up some space for storage  ERCOT favors 667 in part because they see need for faster acting resources with our current market and the future integration of large amounts of wind and solar  One area that has not been addressed is inertia service – a concern as coal plants come down and is largely replaced by renewables  Synchronous Inertial Response Service is a proposal yet to be fully developed  Definition:” Synchronous Inertial Response (SIR) is an instantaneous response that is continuously self-deployed from synchronous machines following disturbances” from ERCOT white paper ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 21

LONG-TERM SYSTEM ASSESSMENT CONTINUED  ERCOT has finished draft current trends for 2016 and it is surprising  Current Trends Assumes No Major Storage Component but shows potential for underserved hours and potentially inertia and frequency problems  One of the scenarios being developed does include storage in general, as well as integration of EVs  Important to note that initial opposition to NPRR 667 was in part based on Brattle Analysis of Old Current Trend Scenario that did not find major issues in 2024… and found combined cycle plants would largely replace reduced output from coal  New analysis however would have led to different result in Brattle Study ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 22

LONG-TERM SYSTEM ASSESSMENT: INITIAL 2016 RUN OF CURRENT TRENDS LED TO ERCOT CONCERNS Added PTC and ITC plus lower cost solar and wind remove chance for any large thermal builds - Solar additions – 21,400 MWs - Wind additions – 100 MWs - CT additions – 3,420 MWs Total fixed retirements – 18,349 MWs – 2,581 MWs retire before 2016 Fixed retirements are replaced mostly with solar resources Largest MW shortage is 10,629 MWs with many hours over 5,000 MWs 125 scarcity hours most occur between 6 pm and 8 pm Fixed retirement ages: Coal – 55 years NG – 50 years Wind – 25 years July 17, 2031

DREAM (DISTRIBUTED ENERGY RESOURCE AND ANCILLARIES MARKET) ON!  Distributed level storage resources could participate more fully in DER- Light or DER-Heavy Scheme under ERCOT White Paper Proposal Significant work needed but storage has particular issues potentially with settlement  Particular focus could be extent to which EVs could be integrated into a DER ancillary or energy market offer  Aggregation of storage with other resources like solar  TAC has authorized DREAM to keep working, but significant issues remain going forward  Allowing aggregation within a load zone could be very important to getting storage plus other DER to participate in market  Issues on do you need to be associated with a Resource Node, Congestion Rights, etc. ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 24

CAN STORAGE PROVIDE RELIABILITY SERVICES  Brattle Oncor proposal (to allow TDUs to build storage, charge ratepayers and then have third-parties operate them for energy and ancillary services) would require PUC and LEG change, but…  TDUs today can potentially use storage as reliability product today (ie AEP Presidio battery)  Capacitors already accepted as a transmission reliability device  ERCOT should place storage as an alternative that is assessed as part of discussion of RMR, Constraints and Needs report and annual Regional Transmission Plan  The RTP “shall identify reliability needs and transmission upgrades and additions required to meet the system needs per criteria set in the ERCOT Planning Guide Sections 3 and 4 and NERC TPL reliability standard”  Storage devices should be assessed as part of this process  RMR decision-making should also incorporate storage as a potential alternative ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 25

NEXT STEPS ON STORAGE  Continue discussion on 667 vs. 752 – assess benefits of FFRS and of having a sliding ratio based upon conditions  Develop separate inertia ancillary service – ETWG could help sponsor this  Develop rules for distributed storage and energy resources participation, including aggregation  Expand planning rules so that in addition to capacitor banks, RTP process looks at storage devices as alternative to new transformers and lines, or a way to downsize  When assessing RMRs, look at storage as an alternative to having to run older uneconomic plants  This group could take on any of these tasks…. ERCOT ENERGY STORAGE MARKETS & POLICY: PAST, PRESENT & FUTURE 26