The VIRGO detection system

Slides:



Advertisements
Similar presentations
Max-Planck-Institut für Gravitationsphysik (Albert-Einstein-Institut) HOMODYNE AND HETERODYNE READOUT OF A SIGNAL- RECYCLED GRAVITATIONAL WAVE DETECTOR.
Advertisements

19. October 2004 A. Freise Automatic Alignment using the Anderson Technique A. Freise European Gravitational Observatory Roma
Dual Recycling for GEO 600 Andreas Freise, Hartmut Grote Institut für Atom- und Molekülphysik Universität Hannover Max-Planck-Institut für Gravitationsphysik.
Status of the Virgo Commissioning G.Losurdo – INFN Firenze/Urbino for the Virgo Collaboration.
September 21, 2005Virgo Status – ESF Workshop1 Status of Virgo B. Mours.
Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Marcus Ng Mentor: Alan Weinstein Co-mentor: Robert Ward
Optics of GW detectors Jo van den Brand
1 Virgo commissioning status M.Barsuglia LAL Orsay.
Optical simulation – March 04 1 Optical Simulation François BONDU VIRGO Tools Goals Example: tuning of modulation frequency A few questions.
Virgo commissioning update - VSR1 first month summary E. Tournefier WG1 meeting, Cascina June 20 th,2007.
VSR1 summary - post VSR1 Commissioning plans E. Tournefier (LAPP-CNRS) LSC-Virgo meeting Oct 22 nd, 2007.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Thermally Deformable Mirrors: a new Adaptive Optics scheme for Advanced Gravitational Wave Interferometers Marie Kasprzack Laboratoire de l’Accélérateur.
1 Gravitational wave interferometer OPTICS François BONDU CNRS UMR 6162 ARTEMIS, Observatoire de la Côte d’Azur, Nice, France EGO, Cascina, Italy May 2006.
1 Virgo commissioning since the end of VSR1 E. Tournefier for the commissioning team ILIAS WG1, Cascina March 5 th,2008.
Virgo Control Noise Reduction
GWADW 2010 in Kyoto, May 19, Development for Observation and Reduction of Radiation Pressure Noise T. Mori, S. Ballmer, K. Agatsuma, S. Sakata,
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
ILIAS WG1 meeting, 19/06/07 IB Faraday Isolator 1 IB in vacuum Faraday isolator E. Genin, S. Hebri, S. Hamdani, P. La Penna, J. Marque EGO.
The GEO 600 Detector Andreas Freise for the GEO 600 Team Max-Planck-Institute for Gravitational Physics University of Hannover May 20, 2002.
Interferometer Control Matt Evans …talk mostly taken from…
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
1 Noise sources at high frequency in Virgo E. Tournefier (LAPP-CNRS) ILAS WG1 meeting, Hannover December 12 th,2005 Recycled ITF sensitivities Noise sources.
LIGO-G D Enhanced LIGO Kate Dooley University of Florida On behalf of the LIGO Scientific Collaboration SESAPS Nov. 1, 2008.
Paolo La Penna The New Virgo Injection BenchN5-WP1 4 TH MEETING, Hannover, 7/04/2005 The New VIRGO Injection Bench Paolo La Penna European Gravitational.
Gabriele Vajente ILIAS WG1 meeting - Perugia Couplings of angular noises into dark fringe Diffused light studies.
07. July 2004 Andreas Freise Status of VIRGO A. Freise For the Virgo Collaboration European Gravitational Observatory.
Environmental noise studies at VIRGO Environmental contributions to Virgo readout noise (C-runs) many sources identified through coherency analyses with.
Status of VIRGO Francesco Fidecaro (after Lisa Barsotti) - University and INFN Pisa – on behalf of the VIRGO collaboration Aspen - January 19 th, 2005.
04. November 2004 A. Freise A. Freise, M. Loupias Collaboration Meeting November 04, 2004 Alignment Status.
GEO600 Detector Status Harald Lück Max-Planck Institut für Gravitationsphysik Institut für Atom- und Molekülphysik, Uni Hannover.
1 Virgo commissioning: Next steps December 12 st 2005 Hannover, ILIAS-GWA WG1 Matteo Barsuglia, LAL/CNRS.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Advanced Virgo Optical Configuration ILIAS-GW, Tübingen Andreas Freise - Conceptual Design -
LSC-VIRGO joint meeting - Pisa1 Input mirrors thermal lensing effect Frequency modulation PRCL length in Virgo Some results from a Finesse simulation.
LIGO-G0200XX-00-M LIGO Scientific Collaboration1 First Results from the Mesa Beam Profile Cavity Prototype Marco Tarallo 26 July 2005 Caltech – LIGO Laboratory.
Paolo La Penna Injection optics for Advanced VirgoLSC/VIRGO joint meeting, Cascina, 25/05/ Advanced VIRGO Input optics LIGO-G Z.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
Abstract The Hannover Thermal Noise Experiment V. Leonhardt, L. Ribichini, H. Lück and K. Danzmann Max-Planck- Institut für Gravitationsphysik We measure.
AIGO 2K Australia - Italy Workshop th October th October 2005 Pablo Barriga for AIGO group.
MSC - 18 Oct 071 LOW FREQUENCY SEISMIC NOISE: LOCKING AND SENSITIVITY ISSUE Paolo Ruggi noise meeting.
Paolo La Penna ILIAS N5-WP1 meeting Noise analysis in Virgo Cascina, 7-8 July 2004 Analysis of noise in VIRGO.
Lisa Barsotti - University and INFN Pisa – on behalf of the Virgo Collaboration CASCINA - January 24 th, 2005 ILIAS  Locking of Full Virgo Status of VIRGO.
Status of VIRGO Lisa Barsotti - University and INFN Pisa – on behalf of the VIRGO collaboration ANNECY - December 15 th, 2004  Status of the Commissioning.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
M. Mantovani, ILIAS Meeting 7 April 2005 Hannover Linear Alignment System for the VIRGO Interferometer M. Mantovani, A. Freise, J. Marque, G. Vajente.
Dual Recycling in GEO 600 H. Grote, A. Freise, M. Malec for the GEO600 team Institut für Atom- und Molekülphysik University of Hannover Max-Planck-Institut.
The status of VIRGO Edwige Tournefier (LAPP-Annecy ) for the VIRGO Collaboration HEP2005, 21st- 27th July 2005 The VIRGO experiment and detection of.
1 Virgo Commissioning Status WG1 meeting Potsdam, 21 st July 2006.
Stefan Hild 111th WG1 meeting, Hannover, January 2007 DC-Readout for GEO Stefan Hild for the GEO-team.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
M. Mantovani ILIAS Cascina March 2008 Automatic Alignment system Improvements after the VSR1 M. Mantovani for the Alignment team.
1 Locking in Virgo Matteo Barsuglia ILIAS, Cascina, July 7 th 2004.
Status of Virgo a short update Michele Punturo. A bit of History July 29 – August –C6 run Duty cycle: Locking 89%, Science Mode 86% September.
Caltech, February 12th1 Virgo central interferometer: commissioning and engineering runs Matteo Barsuglia Laboratoire de l’Accelerateur Lineaire, Orsay.
1 DC readout for Virgo+? E. Tournefier WG1 meeting, Hannover January 23 rd,2007 DC vs AC readout: technical noises Output mode cleaner for DC readout.
Sensitivity of Virgo E. Tournefier (LAPP-CNRS) LSC-Virgo week May 23 rd,2007 LIGO-G Z.
ILIAS - Geneve1 Input mirrors thermal lensing effect in Virgo J. Marque.
Automation of the Lock Acquisition of the 3 km Arm Virgo Interferometer F. Carbognani for The Virgo Collaboration ICALEPCS - Geneva 14 October, 2005.
GEO600 – The output mode cleaner Mirko Prijatelj for the GEO600-Team Institute for Gravitational Physics Albert-Einstein-Institute Hannover / Germany.
Back-scattered light noise in Virgo 2nd Science Run data
Homodyne readout of an interferometer with Signal Recycling
Commissioning the LIGO detectors
Virgo – Injection SYStem
Workshop on Gravitational Wave Detectors, IEEE, Rome, October 21, 2004
LIGO Scientific Collaboration
Improving LIGO’s stability and sensitivity: commissioning examples
Status at the Prague meeting
Presentation transcript:

The VIRGO detection system Paolo La Penna European Gravitational Observatory

VIRGO interferometer

Dark fringe (improved shot noise S/N ratio) DETECTION SYSTEM Aim: Detecting the gravitational wave signal by measuring accurately the output power of the interferometer. Principle: Dark fringe (improved shot noise S/N ratio) Schnupp technique (partially transmitted sidebands (6.26 MHz) beating with the carrier) Spatial filtering (isolate the TEM00 mode with the Output Mode Cleaner): Much smaller photodiode dynamics (1 W, 16 photodiodes) Increase the contrast of the interferometer to reach the optimal sensitivity. Additional functions: Interferometer locking Automatic alignment

WHY AN OUTPUT MODE CLEANER Interferometer on the dark fringe to improve the shot noise S/N But: contrast C < 1 (mirror imperfections, different Rcurv, misalignments, …) If contrast C < 1  modulation index m has to become larger to contain S/N losses m larger  more transmitted power (more sidebands T ) In order to keep the losses (S/N)LOSS <10%, with C 10-2 , G Rec.Gain=50  m 1.1  1.4  PTRANS  25%  75% PIN  2.5  7.5 W Limit on PMAX on photodiodes: too many photodiodes are necessary The contrast C has to be improved  Output Mode Cleaner (OMC)

Output Mode Cleaner

VIRGO OMC requirements FP cavity for spatial filtering: C improvement of a factor 100  F  50 Triangular (no feedback back into the ITF) Transmit TEM00 for carrier and sidebands (6.26 MHz) either very long (two contiguous Airy peaks) or very short cavity (same Airy peak) Chosen a short cavity (about 5 cm): more compact,monolithic (less alignment problems)

VIRGO OMC TOWER

VIRGO BEAM SCHEME Four optical benches: The suspended detection bench The external detection bench, The north external bench, The west external bench. Six beams: B1 (OMC transmitted beam), B1p (before entering the OMC), B1s (OMC reflected beam), B5 (beam reflected by the BS second face), B7, B8 (beam transmitted by NE and WE mirrors).

Suspended and External Detection Benches Air Vacuum 10-6 mbar On ground Suspended

Suspended Bench Local Control The OMC suspended bench is controlled locally: Four leds send light to four mirrors on the bench from four different directions The mirrors send the reflections to a CCD camera The CCD software selects the four zones of the spots and reconstructs the bench movements Corrections are sent to the bench coils The leds are leaning on the tower frame (on ground) The CCD is leaning on ground

Suspended and External Benches Layout B1: OMC transmission (DF signal) B1s: OMC reflection B1s B1 B1p B5 B1p: DF before OMC (lock acq) B5: PR cavity power

Suspended Bench Layout (OMC bench) Telescope (L1+L2+M1+M2+prism): separation of the 2 input beams (B1 and B5), adaptation of the spot size (from 2 cm to 1 mm), bench alignment Quadrant photodiodes (DQ1, DQ2): bench alignment with the input beam B5 Lens L3: adaptation of the spot size B1 before entering into the OMC (from 1 mm to 140 μm) OMC: Output Mode Cleaner Faraday: prevents back reflections

B1s B1 B1p Material: fused silica Length  2 cm Optical path  7.5 cm OMC Characteristics B1s Material: fused silica Length  2 cm Optical path  7.5 cm Finesse: 50 FSR  2 GHz  40 MHz RCURV = 30 cm Waist = 140 mm Obtained matching  94% Losses  1% B1 B1p

The cavity is monolithic: OMC Characteristics The cavity is monolithic: The input beam has to be elliptical to match the cavity. Matching prisms are used to match the cavity waist

OMC Locking OMC locking on TEM00: Via temperature control. Three signals are used to reach and keep a stable lock: The spot shape (a non-gaussian shape means that other modes are transmitted), The power transmitted by the OMC (the power is maximum when the cavity is resonant for the TEM00), The Pound-Drever signal (this signal is achieved thanks to a piezo excitation of the cavity at 28 kHz, on the upper face).

OMC assembling

TEM00 OMC temperature is scanned (2°=1 FSR in 1000 sec) OMC Locking TEM00 OMC temperature is scanned (2°=1 FSR in 1000 sec) Peak detection: a CCD compares the image with the expected TEM00 2 test is performed (10 times/sec) When 2 is below a threshold, starts the linear temperature feedback (less than 0.1 Hz bandwidth)

Alignment and matching is performed once OMC alignment Alignment and matching is performed once Q1 and Q2 quadrants are used as a reference with B5 beam Alignment is performed automatically when Q1 and Q2 asymmetry exceeds a threshold

The External Detection Bench

Final External Detection Bench 16 photodiodes, 1 CCD camera for B1 2 quadrant photodiodes for automatic alignment 2 photodiodes, 1 CCD camera for B1p/B1s/B5

Beams with recycled interferometer Present EDB Setup Beams with recycled interferometer Input power  700 mW (10% attenuation of Pin) B5 3.18 mW B1p 11.9 mW B1 2.7 mW B1s 0.18 mW

Locking procedure: OMC is locked after the ITF locking: OMC and ITF control Locking procedure: OMC is locked after the ITF locking: B1p (before OMC , 1% of Dark Fringe) is used for locking acq After ITF locking, the OMC is locked on the TEM00 (beam B1) After OMC locking, the ITF control is moved to B1 (OMC transmission) OMC has been locked with The Second Stage of Frequency Stabilization (ITF common mode feedback to laser frequency) PR locking Full hierarchical control

The detection system is very reliable and robust: Performances The detection system is very reliable and robust: The lock is acquired within 10 minutes (usually a few minutes) Switch to B1 control does not cause any problem Automatic procedures have been implemented for realignment and relocking when golden state condition is lost or close to be lost Lock is robust: no OMC unlock happens Length precision: about l/60,000 (10-11 m, rms on 1 h ; requirements is l/3,000)

Difference with lock on OMC VIRGO is not limited by shot noise yet: some HF difference is due to the fact that B1p 0.5% of the dark fringe (more amplification, more electronic noise) Sensitivity with switch on B1 (Feb 21 2004) Sensitivity with switch on B1p (Feb 21 2004)

Low frequency B1 and B1p spectrum are different at low frequencies for several reasons: B1p contains higher order modes The low frequency angular motions couple to B1 through the OMC and are reinjected by the control as length noise L : This length noise slightly cancels the effect of angular noise on B1 This length noise is measured by B1p B1_ACp might not measure the real L: B1p can be better estimate of L The real L must be between B1 and B1p estimate B1p_ACp B1_ACp

Summary The OMC of VIRGO is a small triangular monolithic cavity; The cavity is mounted in vacuum on a suspended bench; The bench is locally aligned The OMC is locked with thermal actuators; The OMC has worked satisfactory in the CITF and in VIRGO; The recycled VIRGO has been locked using the OMC transmission; No major problem with the OMC has been detected yet: the system is robust and reliable, and it is operated routinely with automatic procedures; Since VIRGO is still limited essentially by control noise and not by shot noise, no significant improvement in using the OMC locking is visible yet; However, the signal and the beam are clearly cleaner and the cleaning effect of the OMC is evident.