NESTOR-KM3NET Presented by Ion Siotis National Centre for Scientific Research DEMOKRITOS ECFA meeting, Athens, October 2008.

Slides:



Advertisements
Similar presentations
P. Sapienza, Laboratori Nazionali del Sud (INFN)NOW2004, sept A km 3 detector in the Mediterranean: status of NEMO Motivation for a km 3 detector.
Advertisements

29 November Research Infrastructures in FP7 Jean-Louis Picqué European Commission DG Research.
November 2004 The Research Infrastructures in FP7 DG RTD – Directorate ‘Structuring ERA’
NMP-NCP meeting - Brussels, 27 Jan 2005 Towards FP 7: Preliminary principles and orientations… Nicholas Hartley European Commission DG Research DG Research.
A European Strategy for Marine and Maritime Research
1 RESEARCH INFRASTRUCTURES Synergy in using FP7 and SFs for the development of Research Infrastructures Warsaw, 13 February 2006 Hervé Pero, European Commission.
Trigger issues for KM3NeT the large scale underwater neutrino telescope the project objectives design aspects from the KM3NeT TDR trigger issues outlook.
Jan 2009 U. Katz: Astroparticle Physics 1 What is KM3NeT – the Vision  Future cubic-kilometre sized neutrino telescope in the Mediterranean Sea  Exceeds.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Current & Future Research.
ANTARES and KM3NeT John Carr Centre de Physique de Particules de Marseille IN2P3 / MICINN meeting Madrid, 12 Jan 2009.
The Neutrino – Gamma Ray Connection
Helsinki Sept 2007 S.Galés ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures.
The KM3NeT Project  Objectives  Current membership and funding  Preparatory Phase  The EMSO connection  Structural funds ESFRI Meeting, Brussels,
A. BELIAS, NESTOR Institute, Pylos, Greece TeVPA 2009, July 13-17, SLAC1 KM3NeT, a deep sea neutrino telescope in the Mediterranean Sea KM3NeT objectives.
The KM3NeT Project Design Study for a Deep Sea Facility in the Mediterranean for Neutrino Astronomy and Environmental Sciences Physics Perspectives of.
Status of the KM3NeT Design Study  History and structure  Tasks and progress  The European context  Context of decisions to be taken  Conclusions.
Status of the KM3NeT Project  What happened so far  The KM3NeT Conceptual Design Report  The Preparatory Phase: Towards Implementation 3rd Workshop.
Research Infrastructures The Research Infrastructures in FP7.
Antares/KM3NeT M. de Jong. neutrinos  p Scientific motivation: – origin cosmic rays – birth & composition relativistic jets – mechanism of cosmic particle.
KM3NeT ESFRI/PSE-WG meeting, 3 December 2013, Brussels Maarten de Jong & Paschal Coyle on behalf of KM3NeT 1 The next generation neutrino telescope in.
The KM3NeT Project: A km 3 -scale Mediterranean Neutrino Telescope Oleg Kalekin For the KM3NeT Consortium Locating PeV Cosmic-Ray Accelerators Adelaide,
(Towards) a km 3 detector in the Mediterranean Sea Lee F. Thompson University of Sheffield, UK Neutrino 2004 Conference, Paris, June 18th 2004.
KM3NeT IDM/TeVPA conference 23  28 June 2014, Amsterdam, the Netherlands Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino.
NESTOR – a status report Presented by Petros A. Rapidis National Center foir Scientific Research “Demokritos” Athens, Greece On behalf of the NESTOR collaboration.
FP7 and ILIAS-NEXT Geppo Cagnoli INFN Sez. Firenze University of Glasgow 3 rd ILIAS GW Meeting – 26 th Oct. 2006, ICL.
The Preparatory Phase Proposal a first draft to be discussed.
Paolo Piattelli - KM3NeTIAPS - Golden, 6-8 may 2008 KM3NeT: a deep-sea neutrino telescope in the Mediterranean Sea Paolo Piattelli - INFN/LNS Catania (Italy)
KM3NeT The Birth of a Giant V. Popa, KM3NeT Collaboration Institute for Space Sciences, Magurele-Bucharest, Romania.
1 Research Infrastructures in FP7 EUDET Annual Meeting 19 October 2006, Munich Dr. Gerburg Larsen European Commission, RTD-B.3 - Research Infrastructures.
KM3NeT: Towards a km 3 Mediterranean Neutrino Telescope  Some Physics Arguments  Aiming at a km 3 Detector in the Mediterranean Sea  The KM3NeT Design.
Work Programme for the specific programme for research, technological development and demonstration "Integrating and strengthening the European Research.
C.DistefanoCRIS 2008 – Salina, September The KM3Net Consortium Istituto Nazionale di Fisica Nucleare Laboratori Nazionali del Sud Towards a km3-scale.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Status of KM3NeT (Detector Design Optimisations) Christopher Naumann, CEA Saclay – IRFU / SPP for the KM3NeT consortium 44 th Reconcontres de Moriond,
Antoine Kouchner Université Paris 7 Laboratoire APC - CEA/Saclay for the ANTARES collaboration Neutrino Astronomy: a new look at the Galaxy Astronomy Neutrino.
Piera Sapienza – VLVNT Workshop, 5-8 october 2003, Amsterdam Introduction and framework Simulation of atmospheric  (HEMAS and MUSIC) Response of a km.
V.Bertin CPPM / ANTARES Coll. - Moriond ANTARES : A deep-sea 0.1 km² neutrino telescope Vincent Bertin - CPPM-Marseille on behalf of the Antares.
Results of the HPC in Europe Taskforce (HET) e-IRG Workshop Kimmo Koski CSC – The Finnish IT Center for Science April 19 th, 2007.
1 Support for New Research Infrastructures in the EU 7 th Framework Programme for Research Elena Righi European Commission SKADS Workshop, Paris, 4 September.
ESTELA Summer Workshop, 26 June 2013 The EU-SOLARIS project.
KM3NeT Neutrino Telescope- Prospects for Dark Matter Detection Paschal Coyle, Centre de Physique des Particules de Marseille IDM08, Stockholm, 2 August.
Antares Neutrino Telescope Jean-Pierre Ernenwein Université de Haute Alsace (On behalf of the ANTARES collaboration) Rencontres de Moriond, 13/03/2005.
S&T cooperation Mediterranean and EU countries Spanish proposal Casablanca, 17th November 2009 Dr Angeles Rodríguez-Peña Deputy European Programmes Ministry.
EPOS - Rome meeting, September 1 EC + ESFRI Recommendations Elisabeth Kohler CNRS-INSU.
1 Joint Research Centre (JRC) Annual Meeting of the EGTC Platform The EGTC-ready to use - Beyond cohesion policy Ulla Engelmann Interinstitutional and.
ERA-NET Supporting Cooperation for research infrastructures in all S&T fields 7 th FP Call Capacity Work Program: Infrastructures Deadline May 2 nd 2007.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 Meeting with NuPECC 9 March 2006 Presentation by Daniel Pasini, DG Research.
CEA DSM Dapnia - L. Moscoso - KM3NeT23/06/ KM3NeT L. Moscoso DAPNIA/SPP CEA/Saclay.
M editerranean I ndex on operational oceanography and pilot A pplication for what-if predictions A proposal for a Specific Support Action submitted to.
Presented by E.G. Anassontzis University of Athens on behalf of NESTOR COLLABORATION 5-8 October 2003 NIKHEF - Amsterdam Title Mechanics for “km 3 ” neutrino.
R. Coniglione, VLVnT08, Toulon April ‘08 KM3NeT: optimization studies for a cubic kilometer neutrino detector R. Coniglione P. Sapienza Istituto.
Bureau for International Research and Technology Cooperation Herlitschka 1 Warsaw FP6 Launch Conference - 26 Nov Small and Medium Enterprises -
This project has received funding from the European Union’s Seventh Framework Programme for research, technological development and demonstration under.
1 RESEARCH INFRASTRUCTURES RESEARCH INFRASTRUCTURES in FP7 CARE Collaboration Meeting CERN, Switzerland, November 2005 Presentation by Daniel Pasini,
ERANETMED is funded by the European Commission’s 7th Framework Programme EURO – MEDITERRANEAN COOPERATION THROUGH ERANET JOINT ACTIVITIES AND BEYOND ERANETMED.
H. PERO, E uropean Commission European policy developments and challenges in the field of Research Infrastructures.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
Towards the TDR KM3NeT-DS WPx Meeting, Paris, Feb , 2009 Uli Katz ECAP / Univ. Erlangen  My private views  Basis for discussion  Decisions taken.
André Hoddevik, Project Director Enlargement of the PEPPOL-consortium 2009.
KM3NeT Neutrino conference 2-7 June 2014, Boston, U.S.A. Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino telescope in.
2012 a year of transition Paschal Coyle, Mauro Taiuti, E. de Wolf IB-meeting, 29 January 2013, CPPM.
Research & Innovation Preparatory Phase and Early Phase Support under the WP * of Horizon 2020 Harry Tuinder Research Infrastructure Unit DG Research,
Shebli Anvar – CEA Saclay, Irfu On behalf of the KM3Net Consortium
Concluding remarks E. Migneco
KM3NeT: where are we and where do we go
DRIVER Digital Repository Infrastructure Vision for European Research
DG Environment, Unit D.2 Marine Environment and Water Industry
Overview of Euro-Argo Preparatory Phase and status
SOCIAL DIALOGUE WITHIN THE SCOPE OF EUPAN
Experience of the implementation of FP6; preparations towards FP7
Presentation transcript:

NESTOR-KM3NET Presented by Ion Siotis National Centre for Scientific Research DEMOKRITOS ECFA meeting, Athens, October 2008

Last ECFA meeting in Athens – March 2001 NESTOR presentation by L.K.Resvanis OUTLINE NESTOR 2001  2005 transition NESTOR-KM3NeT 2005  today KM3NeT Design Study – KM3NeT Preparatory Phase future (NUBE) KM3NeT 2011  2014

2005 N E S T O R Neutrino Extended Submarine Telescope with Oceanographic Research a variable geometry collaboration – see publications

Also a very versatile and convenient area

5 The Cable Deployment: June 2000 ElectroOptical cable to shore (18 fibers +1 conductor) Deployed in June 2000 by the cableship MAERSK- FIGHTER (ALCATEL- TELEDANMARK) Cable was damaged during laying because of ship’s problems. Cable landing has been completed and first three km have been buried 2 m inside the bottom sand. NESTOR Star Deployment (March 2003)

6 32 m diameter 30 m between floors NESTOR TOWER 144 PMTs Energy threshold as low as 4 GeV m 2 Effective Area for E>10TeV

8 Hamamatsu PMT R (15”) Benthos spheres μ-metal cage power supply The 2003-Detector

9

Coincidence rate for OMs as measured at a depth of 3800m with 1pe thresholds The points represent the data, the solid line the Monte Carlo estimation including background and the dashed line the Monte Carlo estimation for the contribution of the atmospheric muons. 4 fold rate is 0.25 Hz for this 12 PMT node.

11 single p.e. LED Run single p.e. pulse height distribution two p.e. s pulse height distribution dark current pulse height distribution sum of the above Data from a depth of 3800 m PMT Pulse Height Distribution Calibration K 40 Background: A stable calibration source

12 Event 1785 – Run 81 – BFile 3 c

13 Event 1785 – Run 81 – BFile 3 c

The measured vertical muon intensity I 0 and the index , at a depth of 3800 m water equivalent, are

In parallel with NESTOR activities 2001  2005 KM3NeT Design Study preparation and Proposal submission Preparation Amsterdam, October 2003 – VLVNT workshop – 3. KM3NeT co-ordination meeting Munich, November 2003 – ApPEC Design Study Workshop – 4. KM3NeT co-ordination meeting Athens, January 2004 – KM3NeT writing group meeting Rome, February 2004 – KM3NeT meeting(s) before Design Study deadline Submission Brussels, 4. March 2004, 17:00 MET DS deadline! Approval-Start Approved, September 2005 Start-Kickoff February 2006  end November 2009

Objectives and Scope of the Design Study Establish path from current projects to KM3NeT:  Critical review of current technical solutions;  New developments, thorough tests;  Comparative study of sites and recommendation on site choice (figure of merit: physics sensitivity / €);  Assessment of quality control and assurance;  Exploration of possible cooperation with industry;  Investigation of funding and governance models. Total budget for KM3NeT DS 20 Meuro EC contribution 10 Meuro Half way deliverable CONCEPTUAL DESIGN REPORT (CDR)

Conceptual Design for a Very Large Volume Neutrino and Sea Science Observator in the Mediterranean Sea KM3NeT Consortium 39 institutions (5 EL) from 10 EU countries ~250 participants (~25 EL) University of Aberdeen, United Kingdom / University of Amsterdam, the Netherlands / APC, Paris, France / University of Athens, Greece / University of Bari and INFN Sezione Bari, Italy / University of Bologna and INFN Sezione Bologna, Italy / University of Catania and INFN Sezione di Catania, Italy / CEA Saclay, France / CNR – ISMAR, Ancona, Italy / CPPM, Marseille, France / CSIC, Spain / University of Cyprus / DIAS, Dublin, Ireland / University of Erlangen, Germany / University of Genova and INFN Sezione Genova, Italy / Universit é de Haut Alsace GRPHE, Mulhouse, France / HCMR, Greece / HOU, Greece / IFREMER, France / INGV, Catania, Italy / IPHC DRS,Strasbourg, France / ISS, Bucharest, Romania / University of Kiel, Germany / KVI and University of Groningen, the Netherlands / University of Leeds, United Kingdom / University of Liverpool, United Kingdom / INFN LNF, Frascati, Italy / INFN LNS, Catania, Italy / University of Napoli and INFN Sezione Napoli, Italy / NCSR Demokritos, Athens, Greece / NIKHEF, Amsterdam, the Netherlands / NOA NESTOR inst, Pylos, Greece / University of Pisa and INFN Sezione Pisa, Italy / University of Roma 1 and INFN Sezione Roma, Italy / University of Sheffield, United Kingdom / Tecnomare, Venice, Italy / University of Utrecht, the Netherlands / University of Valencia, Spain / Universidad Polit é cnica Valencia, Spain KM3NeT Design Study funded by FP6 ~10 Meuro (~2.5 Meuro to EL groups)

KM3NeT CONCEPTUAL DESIGN REPORT Delivered to EC and published April KM3NeT CDR DESIGN GOALS Topics addressed Lifetime Environmental Impact Energy Range Zenith Angular Acceptance Angular Resolution of Detector Time and Position Resolution Charge Dynamic Range Two-hit Time Separation Coincidences To optimise the physics potential of the neutrino telescope, design goals for these topics have been quantified for the technical implementations. Work is now continuing towards Technical Design Report (TDR)

FP7 Preparatory Phase for projects on the ESFRI roadmap ftp://ftp.cordis.europa.eu/pub/esfri/docs/pse-report-roadmap-wg-2006_en.pdf KM3NeT PP proposal endorsed with total budget ~10 Meuro, EC support 5 M € 3 year project March March 2011 Objectives: Definition of legal structure & governance Political convergence: site issue & funding Strategic issues: new partners, extendability of detector,.. Operational phase: organisation & user communities Pre procurement with industrial partners System prototyping

SUMMARY so far Science case of KM3NeT shown: Neutrino (astro)physics Marine and Earth sciences DS Conceptual Design Report KM3NeT published DS Technical Design Report foreseen in October 2009 PP Working towards start of construction in 2011 KM3NeT will be a new generation facility: Point source sensitivity ~50 times that of ANTARES Point source sensitivity ~3 times that of IceCube Will complement IceCube in field of view New opportunities for marine and earth sciences New groups are more than welcome

Key Issue: Siting For many future Research Infrastructures of Pan European interest siting is a key issue. Example : European Spallation Source ESS. 3 candidates Bilbao (Spain)-Debrecen (Hungary)-Lund (Sweden) Same applies to KM3NeT though site criteria are different. Anticipated in DS proposal. "...The selection of the optimal site for the infrastructure presents a unique challenge to our scientific community due to the intricate interplay between scientific, technological, financial and socio-political / regional considerations. It is our intention to deliver a clear prioritisation of site qualities based on scientific, technological and financial aspects only. However, depending on the strength of this prioritisation, the final site selection may well be determined by socio-political / regional considerations. Whether weak or strong, this Design Study prioritisation will provide a sound, rational basis for decision-makers..."

Timescale for site decision. At time of writing KM3NeT DS proposal this was end 2009-early Original EC proposal for FP7 called for ~ 2.2 Beuro to be invested in early construction phase (engineering phase) of new RI ’ s (20-25% of cost). In final FP7 budget no funds for EC participation in RI construction Commission Final Council FP7 Proposal FP7 Decision (keuro) (keuro) Research Infrastructures Research for the benefit of SMEs Regions of Knowledge Research Potential Science in Society Activities of International Cooperation Coherent development of research policies Total “ Capacities ”

Final FP7 Council decision “… Support for new research infrastructures: ---Construction of new infrastructures and major upgrades of existing ones focussing mainly on preparatory phases, to promote the emergence of new research facilities, in accordance with the principle of ‘ variable geometry ’, building primarily upon the work conducted by ESFRI … As far as the construction of new infrastructures is concerned, the potential for scientific excellence of the convergence regions as well as the outermost regions should be taken into account, whenever appropriate. An efficient coordination of the Community financial instruments, in particular the Seventh Framework Programme and the structural funds, will be ensured. ” Such an efficient coordination HAS NOT been ensured Problem: Structural Funds (ERDF) 2007  2013 Budget must be finalized by end 2008 KM3NeT DS timetable for prioritization of site qualities out of sync with ERDF timetable

Greece Letter of the Greek Secretary General for RTD (Ministry of Development) to Commissioner Potocnik, in copy to the Greek Minister of Development Mr.C Folias, dated informing him of the Greek “…Government's decision to host the Cubic Kilometer Neutrino Telescope (KM3NeT), a European Research Infrastructure on the ESFRI Roadmap, and fund it from 2009 on with 20% of the total cost with a ceiling of 50 Million euro if it were located in Pylos.” This decision has been repeatedly reiterated since then and will be communicated to the EC Research Ministers at their meeting in Brussels on December 2, 2008.

HENAP report following OECD Mega(now Global)Science Forum Workshop held in Taormina in 1997 “ High Energy Neutrino Observatories ” ; Report of the High Energy Neutrino Astrophysics panel to PaNAGIC Committee: HENAP REPORT 1-July 2002 HENAP Physical and Geographical criteria for optimal site The deeper the better The site should be close to the coast The site should be a safe distance from shelf breaks and underwater canyons The site should exhibit good optical underwater properties The sedimentation rate at the site should be as low as possible Underwater currents should be small and have stable direction Site Criteria

Also a very versatile and convenient area

in addition to HENAP KM3NeT list of parameters relevant to choice of site Deployment harbour Logistics Shore premises Data connections Local and regional support Operational support Cost and timescales of all this The dossiers should also describe the deep-sea site characteristics (at least depth, location, proximity to shore, maximum size of extended deep-sea infrastructure) ---> See HENAP criteria At the EU Research Ministers’ meeting on December 2 nd, the Greek case for Pylos will address both the HENAP criteria and the KM3NeT parameters.