J.C. Sheppard, SLAC Americas Region February 7, 2007 1 ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C.

Slides:



Advertisements
Similar presentations
February 7, 2007-Beijing (Zisman-DR) Global Design Effort 1 Damping Ring EDR Plans Michael S. Zisman, Jie Gao, Susanna Guiducci, Andy Wolski DR Area System.
Advertisements

Wednesday July 19 GDE Plenary Global Design Effort 1 Instrumentation Technical System Review Marc Ross.
Friday 28 th April Review of the aims and recommendations from the workshop L. Rinolfi.
JCS e + /e - Source Development and E166 J. C. Sheppard, SLAC June 15, 2005.
E166 Collaboration J.C. Sheppard SLAC, October, 2003 E166 Background Test Simulations: Overview-what do we need J. C. Sheppard.
E166 “Polarized Positrons for Future Linear Colliders” John C. Sheppard E166 Co-spokesman SLAC: August 31, 2004.
BDS GDE context LC-ABD2 : WP4 - Beam Line Design 12 th April 2007, LC-ABD Plenary, RHUL Deepa Angal-Kalinin ASTeC, The Cockcroft Institute.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
European Design Study Towards a TeV Linear Collider WP 2 : Beam Delivery System Co-ordinator: Deepa Angal-Kalinin CCLRC, Daresbury Laboratory.
Global Design Effort BDS KOM Opening remarks/comments from EDR Project Management SLAC Marc Ross / Nick Walker.
Undulator Based ILC Positron Source Studies Wei Gai Argonne National Laboratory CCAST ILC Accelerator Workshop Beijing, Nov 5 – 7, 2007.
J.C. Sheppard, SLAC Americas Region January 31, ILC Reference Design Report Status 2nd ILC Positron Source Collaboration Meeting IHEP, Beijing,
Global Design Effort Push-pull studies How to proceed LCWS07 June 1, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi.
8/28/07RTML EDR KOM1 Cornell Plans for RTML EDR Work G. Dugan Cornell LEPP.
DR Kick-Off Meeting CI, 5 Nov 2007 Global Design Effort 1 Damping Rings Update (after the RDR) Andy Wolski.
RDR Report Writing Nan Phinney SLAC for RDR team of editors.
Controls & LLRF ILC Controls Telecon August 17, 2006 John Carwardine RDR Report Writing.
Global Design Effort Beam Delivery System => EDR LCWS07 June 2, 2007 at DESY Andrei Seryi for BDS Area leaders Deepa Angal-Kalinin, A.S., Hitoshi Yamamoto.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
S2E optics design and particles tracking for the ILC undulator based e+ source Feng Zhou SLAC ILC e+ source meeting, Beijing, Jan. 31 – Feb. 2, 2007.
RDR Report Writing Nan Phinney SLAC. 7/20/06 VLCW06 Global Design Effort 2 GLC Report Working model is the 2003 GLC Report ch 4-7
Project Management Mark Palmer Cornell Laboratory for Accelerator-Based Sciences and Education.
EUROTeV WP4 Report Polarised Positron Source Jim Clarke, on behalf of the WP4 team DESY Zeuthen STFC (Daresbury and RAL) University of Durham University.
Global Design Effort - CFS ILC Accelerator Design and Integration Meeting 1 ILC AD&I MEETING CONVENTIONAL FACILITIES AND SITING GROUP UPDATE V.
Electron Source Configuration Axel Brachmann - SLAC - Jan , KEK GDE meeting International Linear Collider at Stanford Linear Accelerator Center.
Global Design Effort 1 Sources Parallel Session Summary Jim Clarke STFC Daresbury Laboratory.
20 April 2009 AAP Review Global Design Effort 1 The Positron Source Jim Clarke STFC Daresbury Laboratory.
Report of 2 nd ILC Workshop (Snowmass) Working Group Kiyoshi KUBO references: Slides of the plenary talks in the workshop by P.Tenembaum and.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Meeting 1: Oxford ILC GDE Activities Update and Undulator Scheme Status.
J.C. Sheppard, SLAC Americas Region September 27, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford Introduction Discussion J. C. Sheppard.
Global Design Effort Accelerator System Kick-off Meeting e- source SLAC Marc Ross.
DR 3.2 km Lattice Requirements Webex meeting 10 January 2011.
Nick Walker – SA meeting KEK Treaty Points and Costing Guidance Nick Walker 1 st System Area Managers Meeting KEK –
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
9/24-26/07 e- KOM Slide 1/20 ILC Polarized e- source RDR Overview A. Brachmann.
Introduction: Tasks of “Information for simulations”, hardware specs K.Kubo
ILC/CLIC e + generation working group Jim Clarke, STFC Daresbury Laboratory and Louis Rinolfi, CERN.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
10/9/2007 Global Design Effort 1 Optical Matching Device Jeff Gronberg / LLNL October 9, 2007 Positron source KOM - Daresbury This work performed under.
13 September 2006 Global Design Effort 1 ML (x.7) Goals and Scope of Work to end FY09 Nikolay Solyak Fermilab Peter Tenenbaum SLAC.
Review of e- source for the low power Option and status update Axel Brachmann, John Sheppard BAW2, SLAC 1/18/2011.
October 25, 2007 A. Brachmann Slide 1 ILC polarized Electron Source EDR Work Packages ALCPG/GDE Meeting Fermilab, October 25, 2007 Axel Brachmann.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
22 th October 2010 IWLC Sources working group J. Clarke, T. Omori, L. Rinolfi, A. Variola Summary of Sources working group WG1 with contributions from.
Tor Raubenheimer KEK Mtg Goals KEK January 19 th, 2006.
Simulations - Beam dynamics in low emittance transport (LET: From the exit of Damping Ring) K. Kubo
WG3a Sources Update Jim Clarke on behalf of WG3a GDE Meeting, Frascati, December 2005.
ILC 2007 Global Design Effort 1 Planning Damping Rings Activities in the Engineering Design Phase Andy Wolski Cockcroft Institute/University of Liverpool.
November 20, 2008 A. Brachmann Slide 1 Sources Session Summary LCWS 2008 A. Brachmann, J. Clarke.
김 귀년 CHEP, KNU Accelerator Activities in Korea for ILC.
J.C. Sheppard, SLAC Americas Region September 28, ILC Positron TDR and R&D Collaboration Meeting 1: Oxford GigaZ and Polarization Upgrade Discussion.
29/10/09 Positron Workshop 1 Working Assumptions for Low Energy Operations Jim Clarke ASTeC & Cockcroft Institute Daresbury Laboratory.
February 4, 2007 Global Design Effort 1. February 4, 07 Global Design Effort IR&MDI: 2 Tuesday’s discussion EDR organization Work Package distribution.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim Posipol Workshop, Orsay, France May 23-25, 2007 Work performed.
Global Design Effort RTML KOM Close-out Ross, Walker.
Positron Source Report Jim Clarke STFC Daresbury Laboratory/Cockcroft Institute.
ILC Positron Production and Capturing Studies: Update Wei Gai, Wanming Liu and Kwang-Je Kim ILC GDE Meeting DESY May 30 – Jun2, 2007 Work performed for.
1 Positron Source Configuration Masao KURIKI ILC AG meeting at KEK, 2006 Jan. Positron Source Configuration KURIKI Masao and John Sheppard  BCD Description.
Baseline Technical Review – Central Region Accelerator Systems
Integration Ideas for the Central Region Some old some new
R&D Topics for FOA Funding Proposals
Status and Plan of GDE Design Work (Including Road Map for RDR)
ILC/CLIC e+ generation working group
Accelerator Physics Technical System Group Review
Electron Source Configuration
A. Brachmann and J. C. Sheppard SLAC April 4, 2006
J. C. Sheppard SLAC September 29, 2006
CLIC damping rings working plan towards the CDR
ATF project meeting, Feb KEK, Junji Urakawa Contents :
Reliability, MPS, Operations and Tuning Work Packages
Presentation transcript:

J.C. Sheppard, SLAC Americas Region February 7, ILC Source Systems Work Packages and EDR Discussions ILC GDE Meeting IHEP, Beijing, China J. C. Sheppard SLAC February 7, 2007

J.C. Sheppard, SLAC Americas Region February 7, Combined Source Systems Leaders Electrons: A. Brachamnn, SLAC Postrons: J. Clarke, CCLRC; M. Kuriki, KEK, J. Sheppard, SLAC Met with S5 RDB Leader: E. Elsen, DESY-H Two Meetings: February 5 and again in February 6 GDE Breakout In addition, there was an ILC Positron System Collaboration Meeting January 30-February 1, 2007 here at IHEP, Beijing Towards the EDR ILC Positron Effort beyond Beijing Meeting

J.C. Sheppard, SLAC Americas Region February 7, EDR pre-requisite R&D –Source Laser System –DC – gun development –Demonstrate ILC bunch train extraction from Cathode Available polarization ~ 85 %, ~ 90 % with R&D seems possible EDR –Sharing of subsystems with other area systems –System integration and develop technical descriptions E- source summary A. Brachmann, SLAC

J.C. Sheppard, SLAC Americas Region February 7, M. Kuriki, KEK

J.C. Sheppard, SLAC Americas Region February 7, M. Kuriki, KEK

J.C. Sheppard, SLAC Americas Region February 7, February-April 2007: Complete RDR and supporting documentation Update BCD to reflect current design February-June 2007: Develop Engineering Design Report (EDR) Work Plan: A Coordinated Global Effort Needs Definition of Deliverables Must include: R&D goals System Engineering Physical Layouts Cost /Schedule for Construction June 2007: Hamburg GDE/LCWS Meeting to finalize global EDR plans More than simply the ILC GDE R&DB Towards the EDR ILC Positron Effort beyond Beijing Meeting

J.C. Sheppard, SLAC Americas Region February 7, John Sheppard’s opinion Did not develop a group consensus, a language problem perhaps: work packages, bidding, R&D, systems engineerirng,… A question of resource allocation: TS and GS in addition to AS(?) A question of resource availability:…more or less than for RDR A question of organization: R&DB, ERDB(?), GDE EC,….. Did agree to meet regularly via telephone to get this going First meeting on February 27, 2007 when M. Kuriki is at SLAC Towards the EDR ILC Positron Effort beyond Beijing Meeting

J.C. Sheppard, SLAC Americas Region February 7, Optics: Full decks Target  initial capture  discrete lattice  dr injection simulation package Physical layout priorities Realistic layouts (fields, element locations,…) Transmission profile Phase space along beamline Component tolerances: optics, diagnostics, rf Tuning requirements, beamline setup and operation, autosteer, autophase, autoenergy, autolaunch,…. Undulator Scheme Optics Topics for Consideration 1-of-3

J.C. Sheppard, SLAC Americas Region February 7, Space Charge Effects SC issues (or not) in the lower energy section of the e- SC booster linac. Collimation: Full modeling: devices, activation, performance DR loss criteria: chronic and acute Spin Transport: Positrons Electrons Undulator Scheme Optics Topics for Consideration 2-of-3

J.C. Sheppard, SLAC Americas Region February 7, Optics Topics for Consideration Electron Dilution: Wakefields: resistive wall, surface roughness, bellows/apertures,…. Synchrotron radiation: incoherent, coherent, undulator Magnet errors Ion cloud Electron spin dilution (related to spin transport Undulator Radiation: Improved simulations to include electron beam phase space and undulator errors (strength and alignment) Undulator Scheme Optics Topics for Consideration 3-of-3