1 Planning DCS WS 13 - 14.3.06 L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.

Slides:



Advertisements
Similar presentations
JCOP FW Update ALICE DCS Workshop 6 th and 7 th October, 2005 Fernando Varela Rodriguez, IT-CO Outline Organization Current status Future work.
Advertisements

AMORE - AliRoot Detectorv4-18-Rev12 ACORDE EMCal FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T00 TOF TPC TRD V00 ZDC v4-18-Rev13v4-18-Rev14v4-18-Rev15v4-18-Rev16.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
1 Responsibilities & Cost ALICE DCS Review 14 Nov 05 For the DCS Team L.Jirden.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
LHC Gas Control System Stefan Haider EP-TA1-GS ALICE DCS workshop, S.Haider2 Outline Introduction and working philosophyIntroduction and working.
1 DCS TDR Key technical points & milestones TB 15 Dec 2003 L.Jirdén.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
1 Cost of controls TB L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
André Augustinus 9 October 2006 Interlocks update.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
DCS Software Installation computing, network, software guidelines, procedures Peter Rosinsky, Peter Chochula, ACC team ALICE DCS Workshop, CERN, 5-6 March.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
André Augustinus 21 June 2004 DCS Workshop Follow-up from last workshop.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
14 November 08ELACCO meeting1 Alice Detector Control System EST Fellow : Lionel Wallet, CERN Supervisor : Andre Augustinus, CERN Marie Curie Early Stage.
Gas System Construction Status Oct FH. General Construction is proceeding well, (nearly on-schedule). Testing of Racks is longer than foreseen Testing.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
Totem Gas Systems ( T1, T2 ) F. Hahn and S. Haider PH / DT1.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
The (prototype) C&V Framework component used for the SPD Cooling Control A.Tauro, G.De Cataldo.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
1 COSTING DCS WS L.Jirdén. 2 LAN WAN Storage Configuration DB, Archives FSM servers Terminal servers, ACR consoles, etc Experimental equipment.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
(Alice COsmic Ray Detector) Status Report
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
Gas system Commissioning procedures and status
Gas System Commissioning
Experience between AMORE/Offline and sub-systems
Safety Group Program Timeline
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Text for section 1 1 Text for section 2 2 Text for section 3 3
Safety Group Program Timeline
2012 Safety Group Advantage Program Timeline
2012 Safety Group Advantage Program Timeline
2013 Safety Group Advantage Program Timeline
Presentation transcript:

1 Planning DCS WS L.Jirdén

2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2 CR4ACR DCS Back-end CR3 CERN Backbone network DCS network DC Console SG PC PLC PC MUON FE PC Pre-commissioning at P2 What sub-systems will you install? How many PC’s? What Back-end services and what support do you need from ACC?

3 Final installation Apr NETWORK PC + BASE SYSTEM CONTROL CABLES AND DEVICES INST COMM INST COMM MayMarJune Hand-over weeks COMM INST COMM DCS PROJECT DETECTOR INST D- 4D- 2D TODAY

4 Detector installation DETECTORSFrom (D time) To PHOS, TOF, TRD, HMPID, ACORDE 10 July1 Sept TPC4 Sept2 Oct SDD, SSD (ITS Barrel)3 Oct8 Nov FMD, T0, V0 on C-side9 Nov28 Nov SPD, SDD, SSD29 Nov10 Jan 07 TOF, TRD31 Jan 076 Mar 07 FMD, T0, V0, PMD on A-side4 Apr 0723 Apr 07

5 Final installation: PHOS, TOF, TRD, HMPID, ACORDE Apr NETWORK PC + BASE SYSTEM CONTROL CABLES AND DEVICES INST COMM INST COMM MayMarJune Hand-over COMM INST COMM DCS PROJECT DETECTOR INST 12 Jun10 Jul TODAY 26 Jun Latest

6 Gas Systems planning u CERN DT1/GS section is responsible for the construction of eight gas systems: TPC, TRD, TOF, HMPID, CPV, PMD, MuTracker, MuTrigger u All gas racks are planned to be installed by end May u Cable status: u Cables from SG to Plug and from Plug to UX are installed already. u Connectors still missing u Piping schedule: u SG to Plug : end APRIL u Plug to UX : END JULY u Commissioning and fine tuning from about May to September (depending on the progress of detector installation) S. Haider PH/DT1

7 Project: ALICE DCS week u For whom u All detector DCS contacts and/or designers u Aim u To guide and assist the detector users to prepare their DCS applications and to assure the delivery of coherent projects in time. The aim is also to boost the Detector DCS work. u Program u Special ALICE DCS course/hands-on exercise u Framework tools & components recap u Alarm handling u Configuration Dbase3 days u Access control u FSM introduction u ALICE DCS guidelines/standards/rules1 day u Work on own detector applications1 day u Pre-requisites u PVSS & Framework course u When u 24 – 28 April