Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04.

Slides:



Advertisements
Similar presentations
National Radio Astronomy Observatory June 13/14, 2005 EVLA Phase II Proposal Review EVLA Phase II Computing Development Bryan Butler (EVLA System Engineer.
Advertisements

Bill SahrEVLA M&C Transition System Software CDR December 5-6, EVLA Monitor & Control Transition System Software Overview.
EVLA Computing Schedule, Staffing, Testing, Tracking.
ADASS XI Sept30-Oct3, 2001 The ALMA Common Software (ACS) as a basis for a distributed software development G.Raffi, G.Chiozzi (ESO), B.Glendenning (NRAO)
CSI315 Web Applications and Technology Overview of Systems Development (342)
EVLA Computing Overview Gareth Hunt EVLA Advisory Committee 2002 June
Author George Peck EVLA System PDR December 4-5, EVLA Monitor and Control Hardware.
Tim CornwellEVLA System PDR Dec 5-6, EVLA: Data Management EVLA sub-contracts data management to NRAO Data Management group –End-to-end processing.
ALMA Software B.E. Glendenning (NRAO). 2 ALMA “High Frequency VLA” in Chile Presently a European/North American Project –Japan is almost certainly joining.
Mark McKinnon EVLA Advisory Committee Meeting May 8-9, Project Overview Mark McKinnon Project Manager.
Doug Tody E2E Perspective EVLA Advisory Committee Meeting December 14-15, 2004 EVLA Software E2E Perspective.
Overall Data Processing Architecture Review EVLA Monitor and Control Interfaces July , 2002EVLA Data Processing PDR Bill Sahr.
Bill SahrEVLA Advisory Committee Meeting May 8-9, EVLA Monitor & Control.
Bill Sahr EVLA M&C EVLA Advisory Committee Meeting December 14-15, EVLA Monitor & Control.
Project Overview and Status EVLA Advisory Committee Meeting, March 19-20, 2009 Mark McKinnon EVLA Project Manager.
K. Y. LoEVLA Advisory Committee Meeting September 6-7, 2007 Charge to the Committee K. Y. Lo.
Author George Peck EVLA Hardware Monitor & Control PDR March 13, EVLA MONITOR AND CONTROL HARDWARE REQUIREMENTS.
EVLA Transition to Science Operations: An Overview EVLA Advisory Committee Meeting, March 19-20, 2009 Bob Dickman AD, NM Operations.
Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, 2006 EVLA Computing Software Overview.
EVLA Software Bryan Butler. 2007May22EVLA SAGE Meeting2 Requirements and Goals of EVLA Software Maximize scientific throughput of the instrument At a.
Long Term Transition Plan Gareth Hunt EVLA M&C PDR 2002 May 15.
R MoeserCorrelator f2f Meeting1 MCAF (Metadata Capture and Formatting) Rich Moeser.
2007Sep06 EAC Butler - Software Overview 1 Software Overview Bryan Butler.
SAGE meeting Socorro, May 22-23, 2007 EVLA Science Operations: the Array Science Center Claire Chandler NRAO/Socorro.
P. NapierEVLA Advisory Committee Meeting September 8-9, EVLA Advisory Committee Project Overview P. Napier, Project Manager Management, Schedule,
P.NapierEVLA Advisory Comm, 14 Dec 2004 Project Overview Peter Napier, EVLA Project Manager Status 2003 Committee Response.
14 June, 2004 EVLA Overall Design Subsystems II Tom Morgan 1 EVLA Overall Software Design Final Internal Review Subsystems II by Tom Morgan.
Introduction to EVLA Software Bryan Butler. 2006Dec05/06EVLA M&C Transition Software CDR2 EVLA Computing (Terse) History The original EVLA Phase I proposal.
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing Organization/Development.
EVLA Computing Software Overview. Gustaaf van MoorselEVLA Advisory Committee Meeting May 8-9, Contents History Organization and staffing Staffing.
Tim CornwellEVLA Advisory May 10-11, EVLA: Data Management EVLA has sub-contracted data management to NRAO Data Management group End-to-end processing.
Mark McKinnon NSF Mid-Project Review May 11-12, Baseline Project Definition Mark McKinnon Project Manager.
EVLA Monitor & Control Software PDR E2E Interfaces: Observation Scheduling Complaints to: Boyd Waters John Benson, Barry Clark, Tim Cornwell, Rich Moeser,
Bryan ButlerEAC meeting 2003-Sep-091 Computing Issues: Scientific Requirements Bryan Butler EVLA Project Scientist for Software (starting 2003-Oct-01)
RupenEVLA Advisory Committee Meeting May 8-9, Software Requirements Michael P. Rupen EVLA Project Scientist for Software rev. 3may06.
N. RadziwillEVLA Advisory Committee Meeting May 8-9, 2006 NRAO End to End (e2e) Operations Division Nicole M. Radziwill.
UlvestadEVLA Advisory Committee Meeting September 6-7, Future EVLA Operations Jim Ulvestad.
Project Management Plan. Project Organisation DVA-1 Board n One member for each stakeholder n Oversees execution of DVA-1 on time and within budget n.
M. McKinnonEVLA Advisory Committee Meeting September 6-7, Project Overview Mark McKinnon Project Manager.
EVLA Monitor & Control Software PDR Status. May 15, 2002EVLA Monitor & Control Software PDR Bill Sahr 2 Requirements, Schedule Requirements (High Level,
Gustaaf van MoorselEVLA Advisory Committee Meeting December 14-15, 2004 EVLA Computing End-to-end (E2e) software.
Software Requirements for the Testing of Prototype Correlator Sonja Vrcic Socorro, December 11, 2007.
Bill SahrNSF Review May , EVLA Monitor & Control.
P.NapierEVLA Advisory Committee, 10 June, EVLA ADVISORY COMMITTEE PROJECT OVERVIEW Scope Organization Schedule Budget, personnel.
Overall Data Processing Architecture EVLA timeline and priorities.
Master Correlator Control Computer (MCCC) Requirements & Status Sonja Vrcic Socorro, December 12, 2007.
Software Overview Sonja Vrcic
The North America ALMA Science Center
Bryan Butler EVLA Computing Division Head
EVLA Archive The EVLA Archive is the E2E Archive
EAC Butler - SSS Software
EVLA Overall Software Design
EVLA Computing Software Overview.
Antenna Monitor & Control Subsystem Engineering Requirements
EVLA System PDR System Overview
Software Requirements
EVLA M/C Software PDR, 14 May 2002
Scheduling Toolkit Observation Scheduling Boyd Waters, NRAO
VLA to EVLA Transition Plan
EVLA Monitor & Control Software PDR
Bryan Butler (for Bill Sahr)
EVLA Computing Reorganization
Software Requirements
Gustaaf van Moorsel September 9, 2003
Software Requirements
Mark McKinnon EVLA Project Manager
Background Information P.Napier
EVLA Advisory Committee Meeting, March 19-20, 2009
Observatory Science Operations
Observatory Science Operations
Presentation transcript:

Computing Introduction Gareth Hunt EVLA System PDR 2001 December 04

1 Proposal Preparation and Submission 2 Observation Preparation Software 3 Observation Scheduling Software 4 Control and Monitor System 5 Antenna 6 Feed 7 Receiver 8 IF System 9 Local Oscillator 10 Fiber Optics Transmission System 11 Correlator 12 Image Pipeline 13 Data Archive 14 Data Post-Processing NRAO Data Management Group Canadian Partner EVLA Project Primary Data Flow Monitor and Control data EVLA data flow

Gareth HuntEVLA System PDR 2001 December 05 3 Computing Components End-to-end (e2e) –Proposal handling –Observation preparation –Observation scheduling M&C –Observation execution and monitoring End-to-end (e2e) –Image pipeline –Data archive –Data processing

Gareth HuntEVLA System PDR 2001 December 05 4 Development Philosophies Spiral, iterative development –Schedule allows for re-evaluation at the end of each cycle EVLA will not be deployed with 10 year old computer hardware –Budget allows for computer upgrades during construction Design for a distributed architecture –Individual components must be replaceable/upgradeable

Gareth HuntEVLA System PDR 2001 December 05 5 Some Concerns Clear delineation of deliverables –e2e ►M&C ►e2e –M&C ►Widar ►M&C and e2e “Stitching” of correlated data –Combining Widar LTA outputs –Merge with meta-data Duplication of effort Adoption of hardware platforms and software tools –GUI development MIB upgrades and MIB software portability

Gareth HuntEVLA System PDR 2001 December 05 6 Progress Mostly still at the stage of gathering requirement specifications –e2e Project book –M&C Scientific, operational, and technical requirement documents Most technology decisions are still in the future –Gigabit Ethernet between M&C and antennas –Gigabit Ethernet at the correlator back-end –No decision yet on Platforms Compilers Software development tools GUIs Third party software (e.g., from ALMA, GBT, DRAMA, etc.) etc.