How to change a Sponsor ballot vote in myProject Sponsor Ballot – Vote Change Updated : 2 September 2011.

Slides:



Advertisements
Similar presentations
WebHopper, Student Timesheets, and You Students use WebHopper to submit timesheets electronically for approval. Supervisors will use WebHopper to approve.
Advertisements

IEEE P1850 IEEE-SA Sponsor Ballot Primer 5 April 2005 Presented by Andy Ickowicz & Noelle Humenick IEEE Standards Activities.
Overview of the IEEE-SA Process Maintenance of IEEE standards Soo H. Kim, Program Manager, Technical Program Development NPEC Subcommittee SC-3 Jan 24,
P802.16q to Sponsor Ballot: Conditional Approval Request 17 July 2014 IEEE Gdoc.
EC Closing Slides and Motions November 2009 Atlanta, GA.
AFELink AFE Partner Demo. What is AFELink? AFELink automates sending and receiving AFEs / Mail Ballots and responses between operators and partners with:
Mentor ePolls Polling for Groups. 2 What is ePolls? ePolls is the newest feature of Mentor, the IEEE tool for Working Group collaboration. ePolls allows.
IEEE-SA Attendance Tracking Tool Project Wrap Up for 802 Implementation Dallas – November 2008.
IRB Electronic Submission. IRB Definition Committee formally designated to approve, monitor, and review biomedical and behavioral research involving human.
Submitting Your IEEE Standards Project for Approval Consideration RevCom Presentation PE/IC Meeting 9 November 2009 Prepared by Moira Patterson.
IEEE-SA myBallot TM myBallot ™ IEEE Standards Association New Electronic Balloting System Sponsor Tools.
IEEE-SA myBallot TM myBallot ™ IEEE Standards Association New Electronic Balloting System.
Mentor ePolls Polling for Entity Working Groups. 2 What is ePolls? ePolls is the newest feature of Mentor, the IEEE tool for Working Group collaboration.
Managing Student Documents. What we will cover: Document Basics Document Categories Confidential Documents Document Forwarding Document Approval Document.
AFELink Mail Ballot Partner Demo. What is AFELink? AFELink automates sending and receiving AFEs / Mail Ballots and responses between operators and partners.
Doc.: IEEE /0058r0 Submission January 2008 Harry Worstell, AT&TSlide 1 Opening Network Information, Attendance and Documentation for January 2008.
IEEE-SA Public Review IEEE/PES PE/SPDC Committee San Diego, CA May 2015.
Doc.: Submission1 IEEE Motions in July Plenary DCN: Title: Request for Sponsor Ballot Approval for IEEE a.
Doc.: IEEE /0828r0 Submission May 2007 Harry Worstell, AT&TSlide 1 Procedural Clarification Notice: This document has been prepared to assist.
Doc.: IEEE /224r3 Submission May 2001 Tom Siep, TMS ConsultantsSlide 1 TG3 Review Procedure Proposal NOTE: All of these recommendations do not.
Doc.: Submission1 IEEE Motions in March Plenary DCN: Title: Request for EC Unconditional Approval Date Submitted:
Doc.: IEEE /1023r0 Submission September 2008 Bruce Kraemer, MarvellSlide 1 +1 (321) Marvell Lane, Santa Clara, CA, Name Company.
PMIS Introduction to Request New Catalog Item Training Presentation US Department of Health and Human Services.
IEEE Working Group on Broadband Wireless Access (BWA) IEEE /0042r1.
Doc.: IEEE /0392r0 Submission July 2005 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
SDA Formulas Online Webinar Please use the mute button or press #6 on your phones to mute the teleconference line If you have questions or technical problems.
Doc.: IEEE /0023r00 SubmissionApurva N. Mody, BAE SystemsSlide 1 IEEE Motion at the July EC Closing Meeting IEEE P Wireless RANs.
Doc.: IEEE /2458r0 Submission September 2007 Harry Worstell, AT&TSlide 1 Opening Attendance Documentation and Network Info Date: Authors:
Registration form workflow. New registration Visitors should be directed to the following URL:
IEEE PCIC Standards Working Group Officers’ Workshop IEEE-SA Public Review Overview for Sponsor Chairs, Working Group Chairs and Ballot Designees Pat Roder.
E-JPPAP User Guide _ Supplier
Relevant Rules on Recirculation
Month Year IEEE Motions in July, 2017 Plenary
IEEE Standards Association New Electronic Balloting System
To login into the InfoReady system:
IEEE-SA Sponsor Ballot: Comment Resolution
AFELink AFE Partner Demo
AFELink Mail Ballot Operator Demo
IEEE-SA: MyProject Training
Reliance Supplier Corrective Action Process
802.11e Portland Report July 16, 2004 July 16, 2004
AFELink Mail Ballot Partner Demo
IEEE P Motions at the July Plenary EC Meeting
Motion IEEE Standards withdrawals to RevCom
P802.11z conditional approval report to ExCom
MyProject Edit WG Web Site Data.
IEEE-SA Sponsor Ballot: Comment Resolution
Procedural review of initial WG ballot on P802.1CF
Reliance Supplier Corrective Action Process
Introduction to Sponsor Balloting using the myBallot™ system
IEEE Motions in July Plenary DCN:
TG3 Review Procedure Proposal
November 2010 doc.: IEEE /0872r4 November 2010
NesCom PAR Review Period Comment Dialog
Motion – P Rev/D2 to Sponsor Ballot
802.16m Opening (Final) Report
Sponsor Ballot Comment Resolution
Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [A Brief Overview of Draft Approval.
IEEE MEDIA INDEPENDENT HANDOVER
November 2008 doc.: IEEE /1437r1 August 2010
Submission Title: [REVCOM Submission Information]
Overview of WG Letter Ballot Process
Motion #1: TGaq EC Report
Motion – P Rev/D2 to Sponsor Ballot
I’m doing a project; how do I know if I need to go through the IRB?
IEEE MEDIA INDEPENDENT HANDOVER
P802.11aq Waiver Request Introduction
P b to RevCom: Conditional Approval Request
IEEE P Wireless Personal Area Network
SAE Standards Works Training Module - Useful Tabs
Presentation transcript:

How to change a Sponsor ballot vote in myProject Sponsor Ballot – Vote Change Updated : 2 September 2011

Background As you may know, IEEE-SA Standards Board Operations Manual states: In order for a Do Not Approve vote to be changed to an Approve or Abstain vote, the Sponsor shall obtain and provide to RevCom written confirmation from each voter (by letter, fax, or electronic mail) that indicates concurrence with any change of his or her vote. Therefore, to automate the vote change, we are implementing a new feature in myProject that allows a balloter to change his or her vote after the Initial ballot or Recirculation ballot has closed.

Vote Change Features This feature allows a balloter to change his or her vote from Disapprove (with or without comment) to Approve or Abstain. The system notifies the Sponsor through and the vote change automatically becomes part of the ballot documentation. Automating the vote change process will eliminate the need for additional paperwork to be submitted to RevCom by the Sponsor when RevCom Submittal is automated in myProject. Until then, the Sponsor will need to save the notifications of any vote changes and submit them to the RevCom Administrator as part of the RevCom Submittal Package. Please refer to the enclosed screen shots of the new process.

Voter – change vote Once the ballot closes, the Disapprove voters will see a “Change Vote” link. Note: Approve and Abstain voters will not see this link.

Vote Change

Confirm Vote Change

Voter Notification A notification will be sent to the voter, WG Chair, and Standards Representative.

The vote change notification can be used as part of RevCom Submission. NOTE: When RevCom submission is automated, the will automatically be included in the RevCom submittal package.

Ballot Summary View The chair (sponsor, standards rep and/or ballot designee) will be able to easily identify a changed vote in the Ballot Summary View. Clicking on “Flipped” will open the file.

Comments and/or questions should be sent to Christina Boyce