1 Update on Power Supplies TB 16.3.06 L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.

Slides:



Advertisements
Similar presentations
AMORE - AliRoot Detectorv4-18-Rev12 ACORDE EMCal FMD HMPID MCH MTR PHOS PMD SDD SPD SSD T00 TOF TPC TRD V00 ZDC v4-18-Rev13v4-18-Rev14v4-18-Rev15v4-18-Rev16.
Advertisements

Xavier Le Gouard Rich Power Supplies Monitoring and Control RICH Power Supplies Monitoring and control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
1 DCS Installation & commissioning TB 18 May 06 L.Jirden Central DCS Detector DCS Status.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
LHCC referee meeting – 03/07/2007 LHCC referee meeting – 03/07/2007 Status of the TRD at CERN as of July 2007 TRD Group Physikalisches Institut Universität.
Status at P2 C. Lippmann Jan. 22, 2007 TRD DCS workshop at PI, Heidelberg.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
Hans-Åke GustafssonLHCC review January 31, ALICE meets LHCC referees 31/01/ :00  Milestones report H-A Gustafsson  FMD questions H. Boggild.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Recall: u target devices & possible solutions u Outstanding actions.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
1 Status & Plans DCS WS L.Jirdén. 2 DCS Planning FINAL INST COM- MISS BEAM OP PRE- INST DET DCS URD ENG. SOLUTIONS PROTOTYPE SUBSYSTEM.
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
André Augustinus 10 September 2001 Common Applications to Prototype A two way learning process.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
1 LV Power Supplies L.Jirden* u Detector solutions u Contracts u Tests u Outstanding issues *Presented by André Augustinus.
1 Low Voltage Power Supplies for ALICE ALICE week June 04 L.Jirden u Detector requirements u Target Devices u Procurement u Actions.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
1 Status and Plans DCS workshop L.Jirdén u Budget u Status u Planning u Goals for end 2002.
1 Responsibilities & Planning DCS WS L.Jirdén.
André Augustinus 6 October 2005 Cabling, Interlocks, Racks Some remarks.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
Technical Board Meeting, 14/06/07 Kristján Gulbrandsen, NBI 1 Progress on and Status of the Forward Multiplicity Detector Kristján Gulbrandsen Niels Bohr.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
Status of NA62 straw electronics Webs Covers Services Readout.
October 9th 2006ALICE WEEK - DCS WorkShop1 DEVICE USER SUPPORT OVERVIEW - Presentation - First Line Support - Reference System - Current Developpement.
18/6/03GS/ALICE Forum1 LVPS - Grounding Meeting of LVPS TF on Tuesday 17/6 Overview of TPC, TRD and TOF subsystem with F. Szoncso/TIS-GS Review of subsystems.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
1 Low Voltage Power Supplies for ALICE TB L.Jirden u Target devices (reminder) u Market Survey and Tender u Actions.
L.Jirden + J.P. Vanuxem TB VME crates in ALICE (reviewed) u Most detectors (16) need VME crates: u Total 62 crates; 52 for UX, 8 for CR, 2 for.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
1 DCS Status & Plans 22 June 2004 L.Jirdén. 2 URD Status DCS Detectors TOF SPDSDDSSD TPCTRDZDCPMDHMPITS PHO CPVCAL FMDV0T0 TRATRG MU ACCEMC HV LV FEE.
LS1 planning meeting /7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 16 June 2003 DCS Workshop Detector DCS status Overview and news.
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
André Augustinus 13 June 2005 User Requirements, interlocks, cabling, racks, etc. Some remarks.
TC meeting P2 planning wks 3&4 A.Tauro
ACO & AD0 DCS Status report Mario Iván Martínez. LS1 from DCS point of view Roughly halfway through LS1 now – DCS available through all LS1, as much as.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
(Alice COsmic Ray Detector) Status Report
PIXEL CAEN Installation Status
F. Bellini for the DQM core DQM meeting, 04th October 2012
DCS Status and Amanda News
Cabling for LHCb Upgrade
TS2 preparatory meeting
RPC Barrel HV & LV system Lappeenranta University
T1 Electronic status Conclusions Electronics Cards:
ALICE 5 o’clock meeting Wk
Evaluation and testing of advanced low-voltage power supplies
Alice TPC DCS.
TPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing

2 LVPS overview Wiener PL500/F12 TPCCERN contract? TRDCERN contract? PHOS CPV MU TRK MU TRG Arem Pro SDDnon-CERN contract Caen EASY SPD FMD PMD ACORDE SSDnon-CERN contract HMPIDnon-CERN contract Caen SASY TOFnon-CERN contract Caen SY1527 T0non-CERN contract? V0

3 230 VAC 1ph Ethernet 3U UX CR4 2-8V: 10A 25A 50A 100A 5-15V: 10A 20A MAIN CONCERNS: - OPC Server not yet ready - Long delivery delays Wiener PL500/F12 water cooled USERS: No PS TPC20 TRD50 PHOS 6 CPV3 MU-TRK30 MU-TRG 6 TOTAL ~ 115

4 Caen EASY UX CR4 2-8V: 9A 25A 50A 100A MAIN CONCERNS: - Power factor + harmonic rejection too low - Efficiency too low - Radiation tolerance too low - Connectors & mechanical issues - long delivery delays 5-15V: 20A 3U 6U A3486 Ethernet 4U 1527LC A VAC 3ph 48 VDC FILTER 3U USERS: No crates SPD6 FMD 1 PMD6 ACORDE 1 HMPID3 SSD 18 TOF36 TOTAL ~70

5 u Test Samples u TPC, MTG, MTK ordered 7 units in Aug/Sept 05 u Not yet delivered – not before 24 March 06 u Bulk order u MTK, and PHOS ordered in Jan 06, TPC & TRD ? u CERN negotiating production & delivery plan u All empty bins asked to be delivered mid May u Patch panel mounted and cabled by CERN u Rack mounting prototype being prepared in demonstrator rack Bldg 4 u Installation in UX racks June/July u 1 PS of each type to each detector to be delivered July u To enable commissioning to start u Bulk delivery end September u Final installations November u Reception + tests u Delivery to CERN ESS group (if wished) u Unpacking, entry into support dBase u Reception tests with semi-automatic tester Orders and delivery - Wiener

6 u Test samples u None ordered u Bulk order u SPD,FMD,PMD,ACORDE, HMPID ordered all, TOF & SSD ? u Caen need to finalize the systems before production and delivery u Filter unit to be tested by CERN next week u Radiation tests no good; very tedious, but not critical for ALICE u Deliveries (on CERN contract) earliest end September 06 u Installation: earliest November u Commissioning: other devices to be found u Reception u Delivery to CERN ESS group (if wished) u Unpacking, entry into support dBase u Reception tests Orders & delivery - Caen

7 Maintenance u On-site maintenance and repair foreseen u To avoid possible problems due to INB u Done by Caen & Wiener u Organized and handled by CERN ESS group

8 CAENordered SPD1yes SSD1yes TOF4? HMPID1yes CPV1? T0 + V01? PMD1? FMD1yes ZDC1? MTK2? MTG2? ACORDE1? TOTAL17 ISEGordered SDD6? TPC3no TRD3no PHOS1no TOTAL13 HVPS overview

9 HVPS purchasing u No common purchasing done u Each detector to take care of their own orders u Order via Institute or via CERN u Via CERN: contact D.Gregorio, CERN Purchasing u Time to order now u Common effort and support for control part u OPC server, Framework components, etc