Inc 23/24 Integrated Team Review Intravenous Fluid Generation (IV Gen)

Slides:



Advertisements
Similar presentations
SECTION 11 LEVEL B SUIT OUT. SECTION 12 AIR MONITORING.
Advertisements

NORTH POWERED AIR-PURIFYING RESPITATOR (PAPR) INSTRUCTIONS FOR USE Preventive Medicine Industrial Hygiene Service.
Brio 2000 / Brio 2000-M E-Learning Service Manual Rev. 0.0.
Safety Gas Plus.
© Blue Graphics Concept Sauer-Danfoss START-UP PROCEDURE PROPEL PUMP Instruction Sauer-Danfoss Belgium – T. Van Mossevelde.
4-1 Chapter 4 Overview b The DCM is very complex Mechanical, electrical, hydraulic and safety systems all work together Mechanical, electrical, hydraulic.
Clean Air Box Usage & Care CABs RAMs CO Monitors.
Drug Delivery & Tissue Engineering Laboratory
Suction Pumps.
Presented by Jon Pannell
PEUGEOT 206 INSTALLATION 99’— 05’ TU5JP4
Equipment Familiarization Amatrol 850 Basic Hydraulic Training System
AccuMax Multi-Point Injection Mechanics
Hydronic Mechanical Controls
Hydraulics For The Long Term
Series Operational Training. 2 Water Tank Water Pump Multiple Discharges 2000 Series Line Strainer Foam Tank Electronic Direct Injection Proportioner.
Lift Station Safety and Maintenance Tony Conn, Supervisor Wastewater Collection and Pumping
EMISSION PROBE PARTS TUBE: 3/8” OD x wall Stainless Steel Length determined by pipe diameter and placement of connecting end to allow easy connection.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Training Purposes Only JEM MEIS INC JMU (Ver. 1.0) 1 JEM MEIS INC Marangoni Experiment Inc19/20 Notice : This technical data.
CLM Maintenance. Covers : 1 - Side cover, 2 - Back cover, 3 Top cover, 4 - Lamp door, 5 - Side cover input and communication side, 6 - HEPA dust filter,
Launch Chameleon Plus P - More Preventive features and safety L - More Longer Lasting and robust U - More User friendly operation S - More Service friendly.
Part 5: Meeting the Challenge of the “EC Tracers” Healthcare Engineering Consultants How Should I Prepare for the “EC Tracer” Part of the Survey?
Microgravity Science Glovebox Video Overview. Course: MSG05 Version: May 2014 For Training Purposes Only Course Description  Detailed presentation of.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
CIR FOMA Calibration Crew 9/24/08 1:30 PRO-CIR ACT-CMD FOMA-BTL-CAL 1 CMD PRO-CIR DEACT-CMD 274 watts 402 watts274 watts This sequence powers CIR and correlates.
Johnson Space Center, Houston TX Assembly and Disassembly Training Urine Monitoring System (UMS) 1 Familiarization Material for Assembly Task Training.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR Overview Charts August.
Note: Glacier is launched unpowered and hardmounted in EXPRESS Rack 6 on Flight ULF2. For the following three weeks after activation or transfer, two 2-hour.
MSG Seal Replacement Mission Scenario Pre-Pack List (SOC OCR – ULF 1.1) MSG Front Window Exchange MSG Glove Rings & Feed- through Install MSG.
September 2009 Intravenous Fluid Generation (IV Gen) EXPERIMENT OVERVIEW.
Lyndon B. Johnson Space Center - Houston, TX CELLULAR BIOTECHNOLOGY OPERATIONS SUPPORT SYSTEM Biotechnology Specimen Temperature Controller (BSTC) Functional.
Technical Analysis. 1500U Floor area 1500 cm P drawer style Floor area 2064 cm 2 LET’S FOCUS ON IT!
Urine Monitoring System (UMS) ISS UMS is a redesigned version of the Shuttle UMS.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Cell Bio Tech Demo TIR Overview Aug 28, 2012.
Smoke Aerosol Measurement Experiment (SAME) August 31, Training Strategy Team Meeting 8/31/2005 –SAME Overview –Hardware Overview –Operations Overview.
Discover the Dosmatic Difference Maintaining your Dosmatic injector for years of service.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
Frankie Jernigan/ Kathy Roeske FD36/Operations Development Group /
HOUSING Division Corporate Marketing Department. Plastic Materials POLYETHERIMIDE (PEI) POLYSULFONE (PSU) PSU 3 years WARRANTY PEI 5 years WARRANTY.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
November 29, Frankie Jernigan MSG Integration Investigation Operations Lead EO
POIWG#38 ARTE - Thermal Exchange Presenter: Valerio Di Tana (Argotec)
Copyright © 2010 Delmar, Cengage Learning. ALL RIGHTS RESERVED. Chapter 15 Introduction to IV Therapy.
Welcome Growers Discover the Dosmatic Difference Installing your Dosmatic injector for years of service.
Chip Scale Atomic Clock Contact Info: Captain Ruiz Perez (281) John Merk (617) Paige McClung (281)
Air Cylinders Convert the energy contained in the compressed air
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
National Aeronautics and Space Administration Microgravity Science Glovebox (MSG) Seal Exchange Overview February 2, 2006.
EBS-1 # COOLANT FLUID EXCHANGE QUICK REFERENCE ATTENTION: Using the Coolant Fluid Exchange requires the FILL and VAC Valves on the SERVICE.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Delta Training Strategy.
The BioTector B7000i TOC analyzer with integrated oxygen concentrator
Automotive Heating And Air Conditioning
Double Acting Cylinder
Quick Start Guide for Flex Flow Pump
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
14 Refrigerant Recovery, Recycling, and Recharging.
R1 Fundamentals of Refrigeration
ROCKET TESTING TYPES OF TESTS
Actuators & Directional Control Valves
FIGURE 33-1 A typical fuel tank installation.
LSG Capabilities LSG nomenclature: WV - Work Volume AL - Air Lock
The BioTector B3500ul TOC analyzer Process Tests
Troubleshooting 11/14/2018 Water King Service Seminar.
R1 Fundamentals of Refrigeration
Filling of SAPPHIRE 25 & 42 Bar Systems (TFPP Hardware)
FIGURE 35-1 If the vacuum hose is removed from the fuel-pressure regulator when the engine is running, the fuel pressure should increase. If it does not.
Pneumatic System Conditioning
Presentation transcript:

Inc 23/24 Integrated Team Review Intravenous Fluid Generation (IV Gen)

Science Overview With NASA’s desire to return to the Moon and to extend manned exploration missions to Mars, there is an increased likelihood of a mishap and/or medical emergency. With a focus on minimizing up-mass for exploration missions, it is desirable to have a system onboard that will produce intravenous (IV) solutions as needed rather than flying large quantities of pre-made IV solutions that have a limited shelf life. IV Gen will demonstrate a prototype system to produce Sterile Water for Injection (SWI) in a reduced gravity environment. After purification, the water is mixed with NaCl to produce a normal saline solution. This solution will be returned to Earth for testing. Fluid physics data will allow for scalability of filters and IV fluid production rate to meet exploration requirements.

Payload Overview –Hardware launches on 19A –Operates inside the Microgravity Science Glovebox –Operations performed close to the docking of the next flight –Two saline bags will be returned on ULF4 –Up to 4 additional bags of purified water will be generated to exhaust the filter which will provide data for future scaling –5 major hardware pieces Accumulator, Purifier, Mixer, Data Acquisition and Control Unit, and Power Converter –Input water is from ISS potable water source Water Processing Assembly (WPA) Contingency Water Container – Iodine (CWC-Iodine) –GN2 is used to collapse the inner bag of the Accumulator which pushes water into the Purifier. –Four bags of purified water will be reclaimed into the ISS atmosphere –Three MSG Video Cameras will be installed to record experiment runs –SAMS TSH will be installed for acceleration measurement data

Hardware Overview SAMS TSH Power Converter Data Acquisition and Control Unit Mixer Accumulator Purifier

ISS Potable Water Contingency Water Container - Iodine LAB1D4 (WRS-1) Potable Water Manual Container QD (RIP) WPA H2O Transfer Common Hose

Accumulator ¼” thick Lexan housing for observation Approximately 1.5 liter capacity Uses GN2 to push potable water to the Purifier Custom polyurethane bladder Secured by Velcro to base plate No electrical power dependency Double shut-off quick disconnect valves Water inlet from WPA or CWC-I Water outlet to Purifier GN2 inlet from MSG Accumulator Housing with internal polyurethane bladder

Purifier Deionizing resin and membrane filters to purify the water Flow meter to measure the flow Pressure transducers to monitor the pressure at different points during the purification process Conductivity sensors to compare water conductance before and after deionization Clear Lexan cover for video camera imaging Left two blue 2.0 Pall filters Conductivity sensor after DI resin cartridge White.2 micron filters Access door to activate filter by- pass in case of premature blockage (off-nominal) Top view

Access Door (off nominal use) Potable Water Shutoff Valve Captive fasteners Deionizing Resin Valves Power Data Purifier IV Fluid Outlet Saline Inlet Purified Water Outlet 1.2 µm Air Elimination Filters Conductivity Sensors

Holds two 2-Liter bags via Velcro Teflon-coated stir bar and sodium crystals pre-positioned in Saline bag Saline bag placed on plate with magnetized motor Manual capability for crew control of motor Rotor is visible to allow for stir bar positioning. –Pull force = 1 lb/magnet –900 rpm max Once mixing has been initiated by the crew, it will be software controlled Mixing speed and duration are uplink parameters Homogenizes solution within 20 minutes Mixer Motor Speed Controller Mixer Manual On/Off Electrical Connector

Collection Bag Saline Bag Stir bar NaCl Pressure Cuff (Saline Bag installed ) Bag to Bag transfer will check conductivity to ensure homogenous solution Squeeze solution from Saline Bag into a Collection Bag using a Pressure Cuff (works similar to a blood pressure cuff) Collection Bag has sterility filters Diameter of the stir bar is larger than diameter of tubing

Converts Power from MSG (J116 on the left side) Supplies +28Vdc to the Data Acquisition and Control Unit (J117) Supplies +24Vdc to the Purifier (J118) Power Converter

LEDs Data Acquisition and Control Unit Provides data handling, data storage, and software control functions for the different IV Gen sub-systems. J111 connects to the Power Converter J114 connects to the MSG J404 Data Feedthrough to pass data to the MLC J113 connects to the MSG RS-422 on the rear wall for low rate telemetry and payload commanding J112 connects to the Purifer and Mixer for command and control

Operations Overview Ground rules and constraints –Once an IV Gen WPA Hose has been used, it must be replaced after 72 hours –Samples generated from Saline Operations will be returned on ULF4 –Samples generated from Purified Water Operations will be reclaimed in the ISS atmosphere –Saline Ops and Purified Water Ops will occur on consecutive days to prevent bacteria growth in the filters Run 3-6 Run 1 & 2 Saline Operations N004 Purified Water Ops N005 Hardware Setup N001 GN2 Leak Test N002 Accumulator Fill N003 After Run 6 Hardware Stow N007 Video tape Exchange N006

Hazard Report Number Hazard DescriptionCntrl Num Hazard Control STD-IVGEN-01Mating/demating powered connectors 14.b.3Confirm power has been removed from MSG prior to mating/demating connectors. IVGEN-02Leakage/Inadvertent Release of Fluid 4.2Visually check collection bags, Purifier, and tubing for damage and/or leakage before, during, and after use. IVGEN-02Leakage/Inadvertent Release of Fluid 6.1 Instruct on techniques (valve sequencing and tube clamping) to minimize or eliminate spillage during, assembly, operation, and disassembly of IV Gen hardware. IVGEN-02Leakage/Inadvertent Release of Fluid 6.2 Provide cleaning tools/wipes in case of spillage IVGEN-03Rupture or Leakage of Pressurized System 1.2Perform a leak test on the IV Gen/MSG QD interface. IVGEN-03Rupture or Leakage of Pressurized System 1.3Close the MSG GN2 needle valve prior to mating/demating all GN2 QDs. IVGEN-04Inspect Saline Bags for damage prior to removing from protective packaging. MSG-Int-IV GEN-02Unintended Reactions of Chemicals in the MSG Filters 1.3If a leak should occur, the flight crew will consult MSG staff on console for instructions concerning whether to change any of the air filters in the MSG facility and whether to continue any of the experiments. MSG-Int-IV GEN-03Crew Exposure to Asphyxiating Environment 1.1A pressure decay test will be performed after IV Gen setup in the WV to ensure no leakage of GN2 exists before operation. MSG-Int-IV GEN-03Crew Exposure to Asphyxiating Environment 1.2Purge time of two minutes in OPEN mode before a crew member can access the MSG WV through an access port.

IV Gen Hardware Setup in the MSG

IV Gen Complete Hardware Setup with Saline Bag installed

IV Gen hardware in MSG with Pressure Cuff

CWC –Iodine Compatible Water Container – Iodine IV Gen Intravenous Fluid Generation MSGMicrogravity Science Glovebox NaClSodium Chloride RIP Rack Interface Panel SAMS Space Acceleration Measurement System SWISterile Water for Injection TSH Triaxial Sensor Head USP United States Pharmacopoeia WPAWater Processing Assembly WRS Water Recovery System ACRONYMS