First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler.

Slides:



Advertisements
Similar presentations
DEPARTEMENT DE PHYSIQUE NUCLEAIRE ET CORPUSCULAIRE The DevDET/EUVIF Program: a FP7 project CHIPP Workshop on detector R&D Geneva, June 2008 Daniel.
Advertisements

14 mars 2007M. Dracos, Neutrino Design Study1 Neutrino Oscillation Facility Design Study in FP7.
ISS-4 22 August IRVINE Alain Blondel NEUtrino DETectors N-EU-DET 4-years working plan for Neutrino Detector R&D to take place in ~ objectives.
25/10/2007M. Dracos1 EURO The European Design Study for a high intensity neutrino oscillation facility (Rob Edgecock, Mats Lindroos, Marcos Dracos)
Neutrino detectors for the future Neutrino Facility global numbers : next project ~ 600 M€ (NB NOvA, T2K = 200M$, OPERA=100MCHF, etc...) community between.
SG Det IA 2007 oct29 Alain Blondel ECFA study groups BENE (in CARE) Int'l Scoping Study (ISS) Steering group (EU): A.Blondel (Geneva) P.Soler (Glasgow)
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin LAL/IN2P3/CNRS.
WP5: Detector Performance and Cost EuroNu Launch Meeting 5 February 2008 Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera Villanueva,
L. Serin LAL/Orsay/IN2P3 EUDET Meeting01/10/101 Organization & status of the project EUDET  LC activities in AIDA Conclusion
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Photo taken at Sra Patum Palace SUT is a full member of ALICE On 13 December 2012, there was a signing ceremony Memorandum of Understanding between SUT.
ATTRACT is a proposal for an EU-funded R&D programme as part of H2020 for sensor, imaging and related computing (ICT) development Its purpose is to demonstrate.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
European design study on Neutrinofacilities - Euronu within FP7.
TALENT Status and Future 16/07/14H.Pernegger, M.Capeans1.
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Proposal submitted 2 nd May 2007 “Approved” ~ beginning August 07  highest mark ever.
European Strategy Session of Council The European Strategy – report to the RECFA meeting in Brussels Will cover the following selected topics:  ECFA and.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
Combined Test Beams Definition of Combined Test Beams Why would we want them? Why we might not want them? Host laboratory issues? Experimenter issues.
Anselmo Cervera Villanueva IFIC (Universidad de Valencia & CSIC) EURODET meeting 7 December 2007 Neutrino Networking activities.
The time line Autumn 2011CERN Council initiated an update exercise to the European Strategy for Particle Physics which was approved by a special Council.
WP5: Detector Performance and Cost EuroNu Meeting CERN, 26 March 2009 Paul Soler Coordinator: Paul Soler, University of Glasgow Deputy: Anselmo Cervera.
Tobias Haas DESY 8 November 2005 A Pixel Telescope for Detector R&D for an ILC Introduction: EUDET Introduction: EUDET First general ideas (with some interludes)
S.Stapnes1 European Detector R&D and FP7 - Outline  Background –New call for IAs (Integrated Activities) in November – it is in fact expected tomorrow.
1 Advanced European Infrastructures for Detectors at Accelerators Generalities on FP7 IA call Context of AIDA call AIDA Work Package description Schedule.
Office of Science U.S. Department of Energy 1 International Linear Collider In August 2004 ICFA announced their technology selection for an ILC: 1.The.
CLICdp achievements in 2014 and goals for 2015 Lucie Linssen, CERN on behalf of the CLICdp collaboration CLIC workshop, January 30 th
L. Serin LAL/IN2P3/CNRS March 26th AIDA-2 proposal Reminder of targeted call in H2020 (shown at Feb 17 th meeting) Organization Status of Trans.
CERN HR Department Strategy, Management and Development DT2 News Summer Students Presentations: Henrik Friis Dam 'Characterization of Scintillating Fibres.
S.Stapnes1 European Detector R&D and FP7 - background  Two CN (Construction of New Infrastructures – support for preparatory phase – including some detector.
Lucie Linssen, PH senior staff meeting 23 Nov ’05 slide 1 EUDET Links: Public EUDET pages: Internal EUDET pages:
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement WP8 – Improvement and.
1 EUDET Summary and Outlook Joachim Mnich Annual Meeting 2007 Palaiseau, October 10th Outline:  Summary and Outlook EUDET  Introdution to FP7 discussion.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
1 GAS DETECTORS AIDA2020- GENERAL NEWS AIDA year programme4-year programme Project selected: 18/1/2015Project selected: 18/1/2015 Starting date 1/5/2015Starting.
S.Stapnes1 European Detector R&D and FP7 - Outline  Background –New call for IAs (Integrated Activities) in November – it is in fact expected tomorrow.
Status and Plans for EUROnu FP7 Design Study Status and Plans for EUROnu FP7 Design Study EUROnu = A High Intensity Neutrino Oscillation Facility in Europe.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
DEPARTMENT OF PHYSICS AND ASTRONOMY X-ray Astronomy and Space Instrumentation I3 Meeting, December 2004 Integrating Space Radiation Sensing Infrastructures.
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
L. Serin CNRS/IN2P3 AIDA Second Annual Meeting 1 Deliverables M1 - M128 M13-M246 M25-M367 M37-M4833 Y1 : All achieved, a few ones with 6 months delay Y2.
AIDA is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme, Grant Agreement L. Serin CNRS/IN2P3.
FP7 – DEVDET Proposal EUVIF: the vertical integration facility Ingrid-Maria Gregor, DESY ILC Vertex Workshop ILC Vertex Workshop April 2008 Villa.
Neutrino detector IA request Lines of thought first meeting on 24 August 2007 on- the fly notes by AB present: Alain Blondel, André Rubbia, Anselmo Cervera,
EURO EURO A High Intensity Neutrino Oscillation Facility in Europe Introduction Aims Structure Tasks Link to other activities Future dates.
EUDET meeting 21/10/09 1 Advanced European Infrastructures for Detectors at Accelerators Generalities on FP7 Infrastructure Activity call Context of AIDA.
Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
DevDet Project Summary Francesco Forti, INFN and University, Pisa SuperB Detector R&D Workshop SLAC, February 14-16, 2008.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
5 th Spanish Workshop on Future Accelerators IFIC, Valencia Oct I. Vila IFCA (CSIC-UC) Advanced European Infrastructures for Detectors at Accelerators.
CERN Neutrino platform 24 th July, 2014 S. Bertolucci CERN.
S.Stapnes 1 European Detector R&D and FP7 - Outline Background –Some quick reminders DevDet submitted for Integrated Activity FP7 call –Overview –Some.
Accelerator R&D for Future Neutrino Projects
New EU FP7 I3 call Identifier: FP7-INFRASTRUCTURES
CERN R&D plans and Infrastructures
WP8 – Improvement and equipment of irradiation beam lines
Accelerator Research and Innovation for European Science and Society
6th Spanish Workshop on Future Accelerators Granada May 2011
European Detector R&D and FP7 - Outline
European Detector R&D: AIDA
Working for a detector project: A message from AIDA
EU Institution Board 1 representative of each participating institute
CLIC Detector CERN Status + plans
A High Intensity Neutrino Oscillation Facility in Europe
AIDA++ * Next Steps * Working Title for the AIDA-2020 Follow-up
Presentation transcript:

First discussions regarding new EU AIDA project EUROnu WP5 Meeting 8 September 2009 Paul Soler

2 EuroNu and NF-IDS Meeting, CERN 22 March 2009 Definition of AIDA o DevDet: this was a failed FP7 Integrating Activity proposal for “Detector Development Infrastructures for Particle Physics Experiments” ̶ It included detector R&D for Super-LHC, Linear Collider, future accelerator-driven neutrino facilities and B-factories ̶ The aim was to develop test beam facilities for neutrino detector R&D. ̶ This proposal was not funded in first round o AIDA: Advanced Infrastructure for Detectors at Accelerators ̶ New EU approach of targetted calls is recommending that DevDet be resubmitted to the EU in their Integrating Activity call of August 2009 (submission date 3 December 2009) – renamed as AIDA ̶ I am part of the small group of people putting together the proposal ̶ We need to make sure that the neutrino community is well represented in this new call to be able to fund neutrino detector R&D in Europe.

3 EuroNu and NF-IDS Meeting, CERN 22 March 2009 AIDA aims o AIMS AIDA: needs to fund common R&D projects for Super-LHC, Linear Collider, neutrino facilities and B- factories ̶ From the point of view of neutrino R&D, the proposal aims to fund a low energy particle test beam at CERN and its associated instrumentation (ie MICE-EMR detector in a magnet or a prototype MIND that can be used as spectrometer). ̶ The management team at the moment consists of: Laurent Serin (probable coordinator), Lucie Linssen, Steiner Stapnes, Mar Capeans Garrido, Tiels Behnke, Francesco Forti, Hans Taureg, Jordan Nash, Svetlomir Stavrev ̶ There are also National Representatives to coordinate individual country contributions ̶ Expect ~50 institutes represented from about countries ̶ EU budget 10 MEuro max but project likely to be ~35 MEuro

4 EuroNu and NF-IDS Meeting, CERN 22 March 2009 AIDA structure WP 1 (MGT) : Project management and documentation CERN EU office + PLs WP2 (COORD) : Development of common software tools 2.1 Detector geometry, calibration & alignment 2.2 Reconstruction and analysis software algorithm 2.3 Parallelization of software framework to exploit multi-core processors ???? WP3 (COORD) Detector Integrated Electronics 3.1 3D interconnection of microelectronics and semiconductor 3.2 CMOS detectors 3.3 Common aspect of cooling/power ??? WP4 (SUPP) Transnational Access to DESY test beam WP5 (SUPP) Transnational Access to CERN test beam and irradiation facilities

5 EuroNu and NF-IDS Meeting, CERN 22 March 2009 AIDA structure WP6 (SUPP) : Transnational Access to European Irradiation facilities WP 7 ( RTD) Improvement and equipment of beam & Irradiation lines 7.1 : Low energy beam (CERN) (Frascati beam ?) – neutrino detector R&D beam!!! 7.2: Upgrade of proton & neutron irradiation facilities at CERN 7.3 : General beam line equipment : Can contain magnets, gas supplies, beam Cerenkov, cooling and cryogenics plant, thermal characterization 7.4 Stand-alone detector equipment for beam tests Can contain some DAQ, DCS aspect (all communities) as well as more advanced electronics modules for trigger/time measurement (Super B)

6 EuroNu and NF-IDS Meeting, CERN 22 March 2009 AIDA structure WP8 : Medium advanced Infrastructure for detector R&D 8.1 Gaseous tracking facility include LC-TPC setup, RD51 activity for SLHC, neutrinos…. 8.2 Precision pixel infrastructure: Can contain large part of devdet-WP10 with structure to accept modules of different technologies, contribution to another pixel telescope and/or alignment aspect. (part of the pixel technology will go also in WP3) Will contain both LC,SLHC and super B community 8.3 Granular calorimeter studies infrastructure Here contain only LC activity. Can argue here about need of large scale calorimeter with large scale Si strip tracking 8.4 Qualification of material for detectors Can contain both infrastructure for the test at irradiation facilities, definition of agreed test procedure and the delivery of a common database

7 EuroNu and NF-IDS Meeting, CERN 22 March 2009 AIDA structure WP 9 (RTD) : Integration of sub detectors for a combined Test 9.1 Coordination of combined tests Can include beam test organization/schedule but also part of analysis 9.2 Common DAQ and detector control systems 9.3 Integration of individual tracking detectors 9.4 Integration of large scale calorimeters For 9.3 and 9. 4, should be careful to have really global infrastructure and not be redundant with package WP8. Need to have part of devdet-10 both in WP8 and WP8 so that their budget are correctly balanced. WP10 (COORD ) Technology roadmap for particle physics detectors (Sensors, electronics, power, SiPM, micropattern gas detector) Deliverable here is only a document. Budget is mainly travel/meeting