FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage.

Slides:



Advertisements
Similar presentations
Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Advertisements

Pepperpot Emittance Measurements of the FETS Ion Source
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
Status of the RFQ (i.e. the 4-vane cold model) Ajit Kurup UKNF Meeting 3 rd October 2007.
Status of the SPL cavities at CERN I.Aviles & N. Valverde on behalf of SPL team 1I. Aviles & N. ValverdeLund, 11 December 2013.
E. Beebe LEBT & Ion Injection EBIS Project Technical Review 1/27/2005 LEBT and External Ion Injection Ed Beebe Preinjector Group Collider-Accelerator Department.
Generation and Characterization of Magnetized Bunched Electron Beam from DC Photogun for MEIC Cooler Laboratory Directed Research and Development (LDRD)
F.E.T.S. Mechanical Engineering Update by P. Savage 13 th August 2008.
FETS Ion Source Installation progress UKNF Meeting Trinity College, September Dan Faircloth, Scott Lawrie, Alan Letchford, Christoph Gabor,
Status Report on Mk.II Pepperpot Simon Jolly Imperial College 13 th June 2007.
FETS meeting, 1st November 2006 Peter Savage The Front End Test Stand Collaboration 1 The mechanical engineering design of the Mk II emittance measurement.
FETS H - Ion Source Experiments and Installation Scott Lawrie, Dan Faircloth, Alan Letchford, Christoph Gabor, Phil Wise, Mark Whitehead, Trevor Wood,
Uli Raich CERN BE/BI Instrumentation for the new H - Source Test Bench Linac-4 Ion Source Review 2011 Uli Raich CERN BE/BI Linac 4 ion source review, CERN.
F.E.T.S. RFQ Mechanical Design by Peter Savage 7 th January 2010.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
NuFACT06, Irvine 27. August 2006 The Front End Test Stand (FETS) is a collaborative project, between CCLRC (ISIS & ASTeC) and UK universities (Imperial.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
FETS Progress UKNF OsC 21 st June 2010 Dan Faircloth Faircloth.
Status of the Front End Test Stand April Infrastructure R8 refurbished Laser lab under construction Vacuum system for first section delivered Stands.
FETS meeting Beam Profile Measurement Tank By P. Savage 13th June 2007.
F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.
Simulations and Diagnostics for the Front End Test Stand Simon Jolly Imperial College 18 th April 2007.
Current Status of Pepperpot Emittance Measurement System Simon Jolly Imperial College FETS Meeting, 22/02/06.
FETS Pepperpot Simon Jolly 10 th February The Pepperpot Beam segmented by intercepting screen with regular array of holes. Beamlets drift short.
The Stripping Foil Test Stand in the Linac4 Transfer Line
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UK Neutrino Factory Meeting Front End Test Stand (F.E.T.S.) Engineering Status by P. Savage 22nd April 2009.
ASTA Accelerator Directorate Review Project Plan and ES&H Carsten Hast May 20, 2014.
PASI OsC meeting 12th July 2012
Developments of the FETS Ion Source Scott Lawrie.
BL SAXS End Station (Small Angle X-ray Scattering)
Ch. Vuitton – BE/BI Presented by R. Veness – BE/BI 18th October
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
L4 BCC – 1 Sep 2011 F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker.
FETS Laserwire Status David Lee
H4F Physics Day 2014 C.Ullmann Proton injector status for FAIR and measurements at BETSI test bench (CEA/Saclay) 2014.
LINAC4 emittance measurements BI Day Divonne, 24 th November 11/24/2011 B.Cheymol, E. Bravin, D. Gerard, U. Raich, F. Roncarolo BE/BI 1.
PXIE Beam Instrumentation Status Update – Preparing for MEBT 1.1 Beam Vic Scarpine Feb. 9, 2016.
PXIE LEBT Status Update Lionel Prost PIP-II “Friday” Meeting January 16 th, 2015.
FETS Ion Source Diagnostics: The Pepperpot
RFQ CAD Model Tolerance Studies Simon Jolly 2 nd May 2012.
ESS Front End diagnostic
Understanding Extraction And Beam Transport In The ISIS H - Ion Source D. C. Faircloth, A.P Letchford, C. Gabor, S. Lawrie M. O. Whitehead and T. Wood.
3 MeV Measurements at Lianc4 1 Veliko Dimov (for the source and linac team) (J-B Lallement, J. Lettry, A. Lombardi, D. Fink)
Status of Mechanical Design of LEBT Rich Andrews, Matt Alvarez, Tim Hamerla, Danny Snee.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
LCWS11 WG4 Fully featured accelerating structure engineering design
Front End Test Stand (F.E.T.S.)
The RAL Front End Test Stand
F.E.T.S. Mechanical Engineering Update
Pepperpot Emittance Measurements of the FETS Ion Source
Status of the Front End Test Stand April 2007.
LINAC4 LEBT beam size and emittance diagnostics
Optimisation of the FETS RFQ
H- Ion Source Development
HIE-LINAC status report
Pepperpot MkII assembly
(i.e. the 4-vane cold model)
© 2004 – 2011 PAVAC Industries Inc. All rights reserved
One quarter of RFQ vessel + vacuum pumps and supports
ISRC and LEBT Vacuum System Design
Mechanical Engineering progress for the Front End Test Stand
Ion Source and LEBT Beam Diagnostics
(Beam) Commissioning Plan
Front End Test Stand (F.E.T.S.) Engineering Progress Report
Generation of Magnetized Bunched Electron Beam for MEIC Cooler
Presentation transcript:

FETS-HINS Videoconference 23rd Feb 2007 FETS Mechanical Design Issues by J. Pozimski On behalf of P. Savage

Physics design 1 st Engineering design Manufacturing test RFQ development 2 nd Engineering design Brazing test Manufactured RFQ sections

So, what’s next for the RFQ cold model? Cold model End flanges and inserts for the RFQ cold model are currently being manufactured and the tuners will follow shortly. Brazing, bead pull measurements and CMM work then need to be done. Design work on the full length RFQ will begin soon. Full length RFQ

Emittance Scanner Development Following the success of our MkI Emittance Scanner we have developed the MkIIb. New features include: improved stability; a larger grid area (41x41 Ø50 micron holes) cooling; fully kinematic camera positioning and a motor driven grid arm. Assembly will commence next week. Data collected from the MkIIb will enable the LEBT design to be finalised. Ion source development tank Fast CCD camera H- beam Exploded view of grid head

Profile Measurement Tank RFQ Support Bench Development The support bench that will contain the rail system upon which the entire FETS rests has been designed. A low, wide, open design can accommodate a large range of equipment sizes and allows equipment to be mounted between the legs of the stands. 800mm 1650mm

Profile Measurement Development Our latest Engineering challenge is to design a profile measurement tank to occupy the gap between the ion source and the first solenoid. The tank must contain 4 linear/rotary stage pairs and mirrors, a differential pumping tank containing a detector, magnets and a faraday cup – all within 200mm and all to be adequately pumped! Profile Measurement Tank First Solenoid Ion source isolator 200mm

Questions?