S. Colafranceschi - Ischia 2009 - CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza.

Slides:



Advertisements
Similar presentations
Update on the bakelite gluing Feb 2002: first warning from BaBar  13 gaps (over 48) accepted (27%) (i.e. max 2 non contiguous unglued spacers)…the remaining.
Advertisements

Pavia 25/11/2003Davide Piccolo INFN Napoli Status of assembling and Chamber results at HT Pavia 25/11/2003 Davide Piccolo.
LBNE 35 ton prototype Phase 1 summary Terry Tope Fermi National Accelerator Laboratory All Experimenters’ Meeting – Fermilab – May 19, 2014.
Development of high rate RPCs Lei Xia Argonne National Laboratory.
RPC Purifiers’ studies /status/ IR, RG
Aging, High Rate and Shielding L. Lopes Lip-Coimbra.
The RPC Closed loop Gas System. Schedule for completion - update Status Supplier: ok Mixer: ok Humidifier: ok Purifiers: installed, but not completely.
Xe leak status C. Garabatos. Leak story The maximum allowable leak rate corresponds to a loss of 10% of the total volume in one year – 0.3 l/h for the.
Gas Avalanche (%) Streamer (%) Maximum (%) Volume (L) Density (g/L) Weight (Kg) R134a , Isobutane , SF.
Status of OPERA RPC production. A. Garfagnini Opera collaboration meeting Nagoya, 12 march 2002  RPC production at GT;  Schedule for OPERA in 2002; 
Status of the LHCb RPC detector Changes with respect to Note cm strips instead of 3 cm (cost optimization) All gaps same size (standardization)
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
RPC Update José Repond Argonne National Laboratory American Working Group On Linear Collider Calorimetry 16 September 2003 What’s new since Cornell…
RPC GAS SYSTEM Commercial grade Gas :Do in-situ purification Regeneration must :Get back ~90% Fixed pressure control room: pressure at all points in room.
1 May 6, 2009 C. Lu Continuously Monitoring the RPC Gas Mixture with a Gas Chromatograph C. Lu Princeton University.
Daya Bay Muon Subsystem Review, 7/28-29/2007, IHEP, Beijing Daya Bay RPC Gas System: Design Report & Budget Estimate Changguo Lu, Kirk McDonald Princeton.
Davide Piccolo - INFN NapoliSIENA maggio 2004 Production and Quality control of RPCs for the CMS muon barrel system Davide Piccolo – INFN Napoli.
UPDATE ON CMS RESISTIVE PLATE CHAMBERS CMS RPC Barrel Collaboration GR1, 5 Aprile 2004.
2011 HV scan SF6 flow-meter accident 2011 Results comparison RPC HV efficiency scan Pigi Paolucci on behalf of RPC collaboration.
M.Alfonsi 1, G. Bencivenni 1, W. Bonivento 2,A.Cardini 2,C. Deplano 2, P. de Simone 1, F.Murtas 1, D.Pinci 3, M. Poli-Lener 1, D. Raspino 2 and B.Saitta.
Vladimir Frolov for Torino group. Experimental activities: The system for testing the MRPC in the Torino INFN laboratory has been fully mounted and checked;
RPC Cosmic Rays Test in Naples Paolo Iengo Atlas RPC Group Napoli ( M. Alviggi, V. Canale, M. Caprio, G. Carlino,R. de Asmundis, M. Della Pietra, D. della.
RPC STATUS AT PANJAB UNIVERSITY Panjab University, Chandigarh India-CMS Meeting, 28 th July, 2011.
Summer Updates- Summer Student Report Emine Altuntas Stephen Fee Supervisors: Mar Capeans, Ivan Glushkov, Roberto Guida Gamma Irradiation Facility.
M.Bhuyan, S.D.Kalmani, N.K.Mondal, S.Pal, Deepak Samuel, B.Satyanarayana and R.R.Shinde Gouranga Kole, Chiraag Lala and Kanishka Rawat.
Optimization of the operation of Muon systems at LHC: a closed- loop gas system for RPCs and a CF 4 -recuperation unit for the CSC of CMS Conseil Européen.
Calliope ENEA Casaccia MON = monitor MWPC (CH1) T1 = test MWPC (CH3) T2 = test MWPC (BTF,CERN1,CERN2) T = temperature sensor P = atmospheric.
Beam Test June 2010 CMS SUMMARY REPORT 1 Stefano Colafranceschi.
Optimization of the Resistive Plate Chamber operation with a closed loop gas system at the Large Hadron Collider experiments M. Capeans, I. Glushkov, R.
September 9, 2003A. Cardini / INFN Cagliari1 M. Alfonsi 1, G. Bencivenni 1, W. Bonivento 2, A.Cardini 2, C. Deplano 2, P. de Simone 1, F. Murtas 1, D.
Status of production at LNF E. Dane, C. Forti, D. Pinci, A. Sarti – LHCb Muon CERN 25-may-04 Monday 24-may: closed chamber 30. Will close 2 more this week.
TOF Gas System Project Overview. Content Prototype for Aging tests done for RPC’s TOF Gas System: parameters and module layouts. Special Technology: channel.
Goal : Setup and monitor “chambers” with resolution of  < 200  m Demonstrate System Redundancy Test Setup : 1 SLM Line (2 Laser Redundancy) 1 Transfer.
1 Latency and pedestal test Mikko Nykänen
The RPC Closed loop Gas System Slides from Bianco and Guida.
G. Pugliese RPC requests for GIF++ G.Pugliese, N. Zaganidis and I. Pedraza on behalf of the RPC group 1.
Associated detection/extinction systems D. Swoboda.
Andrea Di Simone Andrea Di Simone – INFN Roma2 Andrea Di Simone CERN PH/ATC and INFN-CNAF On behalf of ATLAS RPC groups: Lecce, Napoli, Protvino, Roma2.
Lynsay Bensman 06 October 2009 Errors in Sampling/Monitoring in an Internal Corrosion Program NACE Eastern Area Conference.
NEC Varna sep 12-18, 2005 A. Marinov Andrey Marinov On behalf of the CMS Forward RPC Collaboration Y. Ban, J. Cai, H. Liu, S. Qian, Q. Wang, Y. Ye, J.
Control of the RPC ageing effects in the ATLAS chambers at the GIF - X5 CERN irradiation facility Siena 2004 Siena, 24/05/2004 By G. Aielli on behalf of.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
The gas system for the CMS-RPC detector Roberto Guida Collaborazione CMS-RPC Riunione CSN1 Roma, 2 Aprile 2007.
Progress on the beam tracking instrumentation Position measurement device Tests performed and their resolution Decision on electronics Summary.
Noise and Cosmics in the DHCAL José Repond Argonne National Laboratory CALICE Collaboration Meeting University Hassan II Casablanca, Morocco September.
Results from the CMS-RPC tests at CERN Gamma Irradiation Facility Roberto Guida CMS-RPC (Bari, Beijing, Napoli, Pavia, Sofia) Seoul, October 2005.
Gas Quality Checks Maria Luisa Porto Oriented by: Burkhard Schmidt 23/02/2009.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
All Experimenters MeetingDmitri Denisov Week of September 2 to September 8 D0 Summary  Delivered luminosity and operating efficiency u Delivered: 3.9pb.
30 October 2003V.Souvorov / B.Schmidt - MWPC PRR CERN site1 MWPC Aging Studies Outline: Overview of aging tests done Results in terms of gain variations.
CMS Upgrade Workshop, FNAL, Oct 28-30, O.Prokofiev Update ME4/2 Chambers and Tooling A construction of new ME4/2 prototype at CERN Factory tooling,
CMS-GEM gas system GEMs for CMS High Eta Muons - Workshop III, CERN April R.Guida PH-DT-DI.
Study of gas mixture containing SF6 for the OPERA RPCs A.Paoloni, A. Mengucci (LNF)
1 Analysis of Small RPC DHCAL Prototype Data (noise and cosmic ray) LCWA09, Albuquerque, New Mexico Friday, October 02, 2009 Qingmin Zhang HEP Division,
The closed loop system at ISR We moved the system at ISR in January. Preliminary tests has been done in order to verify the possible use in the “ISR conditions”:
Siena 2002 Siena, 24/10/2002 G. Passaleva New results from an extensive aging test on bakelite RPC G. Passaleva INFN Firenze.
S.Colafranceschi 20 June Stefano Colafranceschi LNF Frascati CERN Universita’ di Roma – La sapienza An overview on gas studies, purifier materials.
Final results from an extensive aging test on bakelite Resistive Plate Chambers Stefano de Capua University of Rome II “Tor Vergata” and INFN.
SiO x coated fiber optic sensor for gas monitoring in RPC S. Grassini 1, M. Parvis 2, M. Ishaiwi 2 1 Dip. di Scienza Applicata e Tecnologia 2 Dip. di Elettronica.
Second run with the Copper filter WA104 technical meeting – 23/03/2016.
G.SavianoWorkshop RPC Mumbai February Materials, Filters and Gas analyses for CMS RPC detector in Closed Loop test setup S.Bianco a, A. Brotzu.
S.DusiniOPERA meeting, LNGS May 2003 Cosmic Test Status Reports Remind of test setup Status report Gas and HVOK Strips and ElectronicsOK DAQalmost.
Long-term environmental effects on the ARGO-YBJ RPC array studied with the Detector Control System P. CAMARRI 1, R. CARDARELLI 1, L. PALUMMO 1, C. VIGORITO.
CMS – RPC GIF++ G. Pugliese on behalf of the RPC Collaboration 1.
Straw Working group Ferrara 4/9/2014. Outline Status and Plans Installation of Chambers 1-3 Chamber 4 Vacuum test SRB Readout, monitoring and software.
D. Piccolomeeting RPC Italia - Ischia september CRAFT08 paper status D. Piccolo Laboratori Nazionali di Frascati INFN.
D. De Gruttola SALE-01: issues with HV supply fixed SALE-01: issues with HV supply fixed QA weekly meeting 26/04/2016.
Follow-up of the tests with the copper filter
Resistive Plate Chambers performance with Cosmic Rays
University of Rome II “Tor Vergata”
Presentation transcript:

S. Colafranceschi - Ischia CMS RPC Italia1 CMS RPC studies at ISR Stefano Colafranceschi Laboratori Nazionali Frascati Università di Roma – La Sapienza CERN for the CMS RPC collaboration RPC Italia Ischia 2009

S. Colafranceschi - Ischia CMS RPC Italia2 Summary Status ISR - Setup remind ISR – The Environment ISR – The “closed loop” effect ISR – Signal current OPEN/CLOSED ISR – Running without filters Chemical setup Conclusions from ISR

S. Colafranceschi - Ischia CMS RPC Italia3 OBJECTIVES AND STATUS  Previous runs in 2007 showed HF production, traces of filter materials in gas, inefficient regeneration procedure  Goal of CYCLE2 started in September 2008: 1.Confirm currents increase is only in TOP (upstream) gaps and not in DOWN (downstream) gaps 2.Measure lifetime of filters with unused material 3.Observe currents increase - correlate with presence of contaminants in gas - identify contaminant in gas  Status Now:  We have observed an increase of currents due to the closed loop effect in the TOP gaps only  Using unused materials the purifiers lifetime is not 1 month but more than 6 months!  Gas analysis performed, now analyzing data, results very soon

S. Colafranceschi - Ischia CMS RPC Italia4 ISR setup reminder Closed Loop (CL) system at ISR, experimental area, for testing performance of CMS gas recirculation system, purifiers and identification of contaminants ISR TEST is equipped and monitored: - GasChromatograph, F- sensors, Temperature/Humidity/Pressure monitoring, mixer and gas flow monitoring - Since September 08 we carry on several tests on this system and we collected large amount of data and material, ready to be analyzed

S. Colafranceschi - Ischia CMS RPC Italia5 ISR the Environment

S. Colafranceschi - Ischia CMS RPC Italia6 ISR the Environment A Big effort, to maintain the environment costant inside the HUT at 20’C, 40% Relative Humidity Temperature (‘C) Relative Humidity (%) time

S. Colafranceschi - Ischia CMS RPC Italia7 ISR the “closed loop” effect AIR CONTAMINATION 1 September 2008 run started with unused material 15/7/09 Removing used filters scala OPEN LOOP TOP GAP, CH8 BOTTOM GAP, CH9 - The closed loop effect is effective only on the TOP gap, the BOTTOM gap doesn’t feel this effect. - The chamber in open loop mode is stable, we can consider this chamber a reference for the “closed loop effect” TOP GAP, CH1 BOTTOM GAP, CH2 uA time CLOSED LOOP

S. Colafranceschi - Ischia CMS RPC Italia8 Safety value Gas mixture is under control AIR CONTAMINATION The current increasing is not due to the air, we keep under control this value purging freon bottles and we daily monitor the gas mixture online with the GC

S. Colafranceschi - Ischia CMS RPC Italia9 ISR Removing ohmic current Default operating voltage Fitting the linear part, up to 6kV Ohmic contribution to the current Total current Since we have performed HV scan every day, with linear fit in the range 0- I(ohmMax), with I(ohmMax)=6kV, we are able to identify just the signal current at 9.2kV, removing the ohmic contribution. In progress check for I(ohmMax)=3,4,5kV. HV scan CH1 10/08/2009

S. Colafranceschi - Ischia CMS RPC Italia10 ISR 09 Running without filters GC failure Closed loop Used filters Filters removed Gas system failure The air contamination increased during the period without purifiers. USED FILTERS ARE STILL CAPABLE TO FILTER OUT AIR. Closed loop Unused filters To be checked

S. Colafranceschi - Ischia CMS RPC Italia11 Chemical Analysis – setup remind We collected bottles (ready to be analyzed) flown during period with high currents We expect to find pollutants inside flasks and on the pre-filters

S. Colafranceschi - Ischia CMS RPC Italia12 Chemical Analysis cycle 2 – timeline phaseSTARTFINISH 129/08/200811/10/ /10/200822/01/ /01/200928/04/ /04/200914/07/ /07/200927/07/ /07/200931/08/ /09/2009running For each phase we replace bottles and prefilters, used bottles are ready to be analyzed

S. Colafranceschi - Ischia CMS RPC Italia13 Conclusions from ISR and…next period WHAT WE UNDERSTOOD Filters performance, using unused materials, is not only one month but more than 6 months. All the TOP gaps show an increased current, these gaps are exposed to “dirty gas mixture” while the gap BOTTOM receive the “purified” gas mixture from the TOP gap. WHAT WE ARE GOING TO UNDERSTAND Analyze ohmic and signal currents increase (bakelite and/or gas ?) The chemical analysis will investigate the nature of the contaminants, the reason why of the increased currents Now currents are decreasing back to the reference value OBJECTIVES OF FINAL CYCLE3 AT ISR Use regenerated filters and confirm the reduced filter lifetime

S. Colafranceschi - Ischia CMS RPC Italia14 SPARE

S. Colafranceschi - Ischia CMS RPC Italia15 ISR data CLOSED GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia16 ISR data CLOSED GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia17 ISR data CLOSED GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia18 ISR data CLOSED GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia19 ISR data CLOSED GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia20 ISR data CLOSED GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia21 ISR data CLOSED GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia22 ISR data OPEN GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia23 ISR data OPEN GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia24 ISR data CLOSED GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia25 ISR data CLOSED GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia26 ISR data CLOSED GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia27 ISR data CLOSED GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia28 ISR data CLOSED GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia29 ISR data CLOSED GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia30 ISR data CLOSED GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia31 ISR data CLOSED GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia32 ISR data OPEN GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia33 ISR data OPEN GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia34 ISR data OPEN GAP TOP

S. Colafranceschi - Ischia CMS RPC Italia35 ISR data OPEN GAP BOTTOM

S. Colafranceschi - Ischia CMS RPC Italia36 ISR data

S. Colafranceschi - Ischia CMS RPC Italia37 ISR data

S. Colafranceschi - Ischia CMS RPC Italia38

S. Colafranceschi - Ischia CMS RPC Italia39

S. Colafranceschi - Ischia CMS RPC Italia40

S. Colafranceschi - Ischia CMS RPC Italia41

S. Colafranceschi - Ischia CMS RPC Italia42

S. Colafranceschi - Ischia CMS RPC Italia43

S. Colafranceschi - Ischia CMS RPC Italia44

S. Colafranceschi - Ischia CMS RPC Italia45 OPEN LOOP

S. Colafranceschi - Ischia CMS RPC Italia46 OPEN LOOP

S. Colafranceschi - Ischia CMS RPC Italia47