Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Mo morning set up 228 bunch injection (36 bunch trains), ramp, squeeze, collisions h luminosity (depending on experiments) ATLAS length scale calibration.
Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
Friday 23 rd November - morning Coming out of loss maps over night Thu – Fri  in shadow of MKD problem in SPS (and CMS cryo recovery) 07:35 Start pre-cycle.
Lot’s of time lost due to cryo problem in IR8. Major impact, therefore review of MD program… Start discussion here, please let us know your input. Will.
Mariusz Sapinski BI/BL Acknowledgements: 1 Planning of quench tests - QTSWG Latest news concerning planning of quench tests Quench Test Strategy.
LHC – week 48 finishing up the ioning Coordination: Gianluigi Arduini & Mike Lamont.
5/11/2012LHC 8:30 meeting Summary of Week 44 Coordination: Mike Lamont & Jan Uythoven.
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Saturday 25/11/10 & Night 12:24 Dump fill #1523 after more than 8 hours in physics It takes some time to get back:  Parallel sequences: Fewer clicks to.
Friday to Saturday 02:00: Machine closed. 09:00: Cryogenics all OK. Preparing pre-cycle. 10:00: Pre-cycle started. 11:30: Pre-cycle finished. 14:00: Beam.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
LBOC11-Oct-2011CERNMassimiliano Ferro-Luzzi 1 LHC Physics Programme  what's left ?
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
RF observation from Saturday morning Observation of beam induced voltage/power following the two klystron trips: 03:18 3B1 just at end ramp, 1.26E14 p.
Wednesday ● 02h04: Stable beams # b x 121b. – Peak luminosity 1.2e25 cm-2 s-1 ● 08h32: Beams dumped on request. – Length=6h28. Rampdown.
Monday h34: beam (1020b) lost after 10 Hz RF trim. Fill h56: XPOC to be reset by expert. 08h18: Masked QPS_STATE SIS interlocks for RB.A12.
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
Shortened program (2 days), as decided in LMC. MD program worked very well  all MD’s on plan with ~foreseen beam time. LHC in very good shape with excellent.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Pevatron status Sunday 29 th November 2015 Coordination: John Jowett, Mike Lamont, Jan Uythoven Access Loss maps Physics.
Filling Schemes for the 2010 Heavy Ion Run Updated (3 rd iteration) version of BCWG presentation initially on 28 September, updated after discussions with.
LHC Status Sat Morning 9-June Bernhard Holzer, Joerg Wenninger Status Friday Morning: 09:00h end of fill “studies” rf coupler fine tuning ADT gain reduced.
CONTENT: Beam characteristics and MP concerns BI configuration Operational settings Collimators Planning Shift breakdown Thanks to: P.Baudrenghien, G.Bellodi,
Cryo back at 17:30 Beam back at 19:00 IR2 aperture until ~03:00 Since then no beam from the SPS:  Connector problem on MKD  Connector eroded, needs to.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
Saturday 14:10 Cryogenics back [26 hours 40 minutes] Pre-cycle 15:30 Beam 2 in  Interlock on TCLIB.6R2.B1. Alessandro Masi found a broken sensor, it would.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
28/01/2013LHC 8:30 meeting Summary of Week 4 pPb physics Machine Coordination: Mike Lamont & Jan Uythoven Ion coordination: John Jowett.
LHC Status Sat Morning 30-June Bernhard Holzer, Jan Uythoven Status Friday Late: preparing restart some issues... LHCb dipole tripped / router problem.
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Saturday 21st April 00:33 Interlock during ramp on BLM HV
Summary Week 47 + Start Week 48
Thursday 25/11/10 & Night Work on: 16:15 Inject fill #1520
Summary Friday h38: Ramp down and pre-cycle.
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Fill 1410 revisited Peak luminosity 1.4e32 Beam current 2.68/2.65 e13
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
LHC Morning Meeting - G. Arduini
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Wednesday Morning 8: :30 end of fill study - octupole polarity inversion (Elias, Tatiana, Alexey, Georges, …): Goal: study the effect of the.
Wednesday 30th November 10:00 Access PZ33 for RP, Cryo, EPC, ELQA
Friday :00 machine setup for luminosity run. Better b-to-b stability from injectors. 01:58 stable run with 228 bunches 11:00 luminosity leveling.
Friday morning 10:30 Optics measurements and corrections.
Wire almost entirely through beam before BLM triggers dump
Yesterday morning Held 1647 for a while – SPS kicker problem
Programme for VDM measurements Friday Oct 15
LHC Morning Meeting - G. Arduini
Monday 24 October hours of 25ns MD
Thu 6/4 End of fill #2470. ~1 pb-1 in 4 hours. Dumped by CMS BCM.
Saturday 3rd November - morning
Saturday Nov Stop proton operation. Switch back to ions
Tue/Wed 12/ :00 Probe beam back again
Thursday – Morning Energy matching at injection with H CODs
Monday morning 09:40 Dump fill 2838, integrated ~130 pb-1.
Saturday :42 stable beams fill 3541
Monday Fill 1803 into stable beams at 9:30. Dump at 19:45.
LHC Morning Meeting - G. Arduini
Wednesday h18: 228b fill lost just before start of ramp.
Monday 27th August & night
Thu :00 Dumped beams, refill for Pb-Pb physics. No more protons in 2011… Some changes: Increase of flat top total voltage to 14 MV. Feed-forward.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Saturday 26 November 2011.
Friday 1st October : Van der Meer scans
Saturday 29th October Friday during IP2 1 m squeeze test
Presentation transcript:

Lumi scan limits checked (in preparation for next fill VdM scans).  Trims of up to 150 um per beam in IP1 & IP2 both planes both beams were done (IP5 is equivalent to IP1). 10:45 Dump #2334 Fill for VdM  Some problems with 200ns_352b_344_324_0_24bpi15inj_IONS bunch/batch configuration  Ended with 200ns_352b_344_324_0_24bpi15inj_IONS2 Check LDM on flat-top – Adam Jeff Thursday 1 st December LHC status

LDM analysis LHC status Beam 1: Satellites 0.31% Ghosts 2.5% Beam 2: Satellites 0.29% Ghosts 2.4% 2

15:30 Stable beams Alice VdMs +/- 6 sigma; length scale scans… Thursday afternoon LHC status 3

18:20 scans finished  hold beams for 2e6 events for Alice 21:15 dump beams At pilots were injected and after corrections dumped The IPOC of the TSU for B1 failed during the dump and caused the block of the XPOC for B1.  Expert was called and after careful analysis of the situation and of a dry dump he confirmed the system works fine but further offline analysis is needed. Thursday evening LHC status 4

Some delay filling  SPS RF  LINAC3 04:20 Stable beams #2336 Friday morning LHC status 5

BGI optimization ongoing LHC status Mariusz 6

Alternate blow-up method LHC status To-morrow morning we check the created RF spectrum on a test bench in the lab. No effect on operation 2. To-morrow afternoon we run a dry test on the machine without beam. Can be done during ramp-down for example 3. Monday? Test with beam at injection energy. 30 min should be enough. Can be done when ready to fill. That will provide a rough scaling of the new method vs. the old one (in term of bunch lengthening vs. rms phase noise) 4. Monday, Tuesday or Wednesday. Test in the ramp with a least 2 batches evenly spaced around the ring. We could also go for a full physics filling. Philippe Baudrenghien Start SB After 3 hours 7

Re-fill for Van der Meer scans  ADT 15 minutes check of bunch mask to verify that it is working correctly and no changes are necessary.  200ns_352b_344_324_0_24bpi15inj_IONS2  normal "high intensity" 200ns ion batches  Verify satellites and ghost charge with LDM  ATLAS & CMS Re-fill for physics… Today LHC status 8

ADT: physics fill with gated damping (24 bunches not damped) to assess possible coexistence damper/BBQ measurement  Use bunch mask to inhibit damping for a normal Physics fill. Do not change any other parameters. The only risk here is that the first bunch train with no damping will suffer more blow-up Ion Quench test MD (> 8 hours). Proposed for Mon 5/12 Incoming LHC status