A-6-PSD-09-043 Slide 1. A-6-PSD-09-043 Slide 2 Broadway Pacific Highway B Street Pier & Cruise Ship Terminal Lane Field Navy Broadway Complex Harbor.

Slides:



Advertisements
Similar presentations
Project 4: National Balloon Museum Rehabilitation and Expansion The rehabilitation of the museum involves an addition to the existing facility, providing.
Advertisements

1.0 Item: Northside Development and Destination Lindberg Study Impacts: The possibility of acquiring Marine Corps Recruit Depot land and building terminal,
Concept Plan Presentation October, THE OPPORTUNITY A large portion of the area between Peger Road and Denali School is under utilized public land.
Muskegon County New Jail Facility and Juvenile Transition Center Presentation to JJTCC, September 5, 2013.
Downtown Revitalization from Concept to Construction.
Smart Growth Station Planning and Transit Oriented Development Photo: Times Herald-Record/Tara Engberg.
May – August Highway 51 Parking Lot Project The Board of Regents approved replacing the asphalt parking lot by Highway 51 with a concrete.
The necessity of New Regulations for New Technologies regarding R79 Japan September / 2012 Informal document GRRF (73rd GRRF, September 2012,
Reston Master Plan Thoughts on transportation. Focus is important Without the proper transportation groundwork other plans will fall through.
March 6, 2008 ALUC/Board Meeting. Airport Land Use Commission Meeting.
Economic Viability of Feeder Service for Bridgeport Presented to: SNAME Annual Meeting Management & Transportation Associates, Inc. October 25, 2001.
Hanbury Evans Wright Vlattas + Company | Studio D Architects Analysis Concepts Refinement Integration Campus Master Plan NMSU
CFC Meeting Location CFC Meetings and Trainings may be held at the Pearl Harbor Moanalua Navy Services Center (aka Fleet and Family Support Center and.
CO 2 Reduction Measures in Freight Sector in Japan by Shinji NAKAGAWA Ministry of Transport Japan.
69 th Street and The Development of the Philadelphia Periphery By: Rob Korobkin.
The Tourist Trade. Who is Coming to America? International Arrivals to the U.S. Note: The category “Overseas” does not include North America. “North.
Parking challenges and proposals in the Santa Cruz de Tenerife Urban Master Plan Review CITY PARKING IN EUROPE Santa Cruz de Tenerife Ctiy Council Municipal.
The Seaport District Marissa Berardi and Brent Myers- Lawson.
Goals of Tourism Development Prepared by: Prof. Dindo Silud.
Transport.tamu.edu Northside Parking Garage Study TSAC April 3, 2013.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Pichamon Adulavidhaya Kunthida Jariyavithayakul Thadchawadee Wejrungsikul Kosit Wibullaksanakul.
International Airport. LOCATION: On Jamaica Bay in the southeastern section of Queens County, New York City. The airport is located 15 miles by highway.
The Delta Science Center at Big Break. The Delta Science Center at Big Break MISSION Recreation Education Restoration Research.
Port of Long Beach Development Projects Al Moro, P.E. Chief Harbor Engineer ACEC January 18, 2012.
CITY COACH POLICY The Coach Bus as a Problem 29 may 2015 Rick Batelaan Senior Advisor Department of Traffic and Public Space.
Los Angeles County Metropolitan Transportation Authority ACEC-LA Luncheon February 12, 2014 Frank Quon, P.E. Executive Officer, Highway Program.
IZMIR HARBOR BECOME IZMIR MARINA Atilla Atila Can Tiryaki Cansu Çimen Cansu Leblebici Gülşah Kocakıran Tolga Günyüzü.
Public safety (vehicular & pedestrian) Worker safety Maintenance of traffic flow Business access Maintenance of utility services.
Southern Bridge Project Brown County Executive
Northeast Bronx Pilot  and Telephone Messages  Pilot area is Bronx Community District 10 and includes Throgs Neck Peninsula, Westchester Square,
The Piers in Kaohsiung city Vicky /Grade 8th. Glory Pier Locating towards the river mouth of Kaohsiung’s Love River, the Glory Pier is originally known.
Sustainable Port of San Diego Michelle White Green Port Program Manager.
Alaska DigiTel. Basic Network Information CMDA 1X network Single Lucent 5E R.26 Paired with Lucent VCDX Covers most of the “beaten path ”
$5.9 M15.1%$22.0 M Net Present Value ROITotal Construction Cost 15,664 LowMidHighPermit Required LowMidHighJobs Total Income ($1,000) Customer / Regulatory.
The Main Street Bike Lane Project LADOT Bike Program.
1Port of San Diego Presentation of Report: State Lands Update- San Diego Unified Port District.
1 Amazing Bridges of China By : E. Cheong BROUGHT TO YOU BY VIPUL DESAI.
Open Space within WRAPS Study Area Existing conditions compared to County staff proposal Open SpaceExistingPotentialChange County Park30,500 SF Source:
NSCAD - New Media School | Reinaldo Torres | Spring Design Studio | Instructor: Wassim Jabi Ph. D Nova Scotia - Halifax Region Halifax Dartmouth.
Europe – Adriatic SEA - WAY Pilot Projects presentation Region of Istria Trieste, 3rd December 2015.
According to San Diego and Superior Court there are no Seismic Hazards in San Diego County because State Seismic Hazard Maps to not Exist for the full.
Shoreline Drive/Greene Lane Park/McAllister Point Aquidneck Island Reuse Planning Authority Surplus Properties at NAVSTA Newport, Rhode Island March 6,
St. Louis w/ bike lanes By: Goon Sup Cha. Why we need bike lanes Given that the St. Louis area has the highest number of bicycle-related accidents in.
2011 Waterfront Neighborhood Master Plan Proposed by Philip Bona Baucentrum Urban Studio Architecture / Planning / Research Philip J. Bona AIA, NCARB,
A-Taxi System: Analysis of Passaic, Morris, & Bergen County Luke Cheng Proma Banerjee.
International/So. Cal. Procurement Conference January 29,
1 Lockheed Martin TLS Visitor Maps & Directions Orlando, FL.
The Chicago Plan Daniel Burnham
Bluff-Residential Carver CornerDowntown HNI Campus.
Belgrade viewed from the boats November 2010 Research of opinions, preferences and expectations of tourists coming to Belgrade by boats Градски завод за.
Rezoning Application No.1291 City Council September 8, 2010 Little England Chapel Cultural Center.
BROOKLYN BRIDGE PARK micah sherman daniel martinez.
Spending an additional $3 million to build excess parking levels at the proposed Pennington Garage that will sit completely empty for decades is not a.
Transferred from the State of California to the City and County of San Francisco in 1968 via Burton Act AB miles of waterfront from Hyde Street.
Lane Center for Academic Health Sciences – Now Open
Assessing for Deep Understanding
Construction Report March 25, 2010.
continued on next slide
                                                                                                                                                                                                                                                
Pacific Center 701 Palomar Airport Road Suite 300 Carlsbad, CA 92011
continued on next slide
continued on next slide
PORT OF EVERETT MARINE TERMINALS MASTER PLAN UPDATE
Existing Boat Facilities
PUNTA GORDA WATERFRONT DEVELOPMENT MASTER PLAN 2018

continued on next slide
LINCOLN COUNTY COMMONS - REVISED MASTER PLAN
continued on next slide
Presentation transcript:

A-6-PSD Slide 1

A-6-PSD Slide 2

Broadway Pacific Highway B Street Pier & Cruise Ship Terminal Lane Field Navy Broadway Complex Harbor Drive Broadway Pier A-6-PSD Slide 3 Auxiliary Cruise Ship Terminal (under construction)

A-6-PSD Slide 4 Oval Park BROADWAY HARBOR DRIVE Lane Field --Certified Port Master Plan “The esplanade expands into plazas at Beech and Ash Streets, B Street Pier, and Broadway Pier. These plazas will be designed to provide open space, sitting and strolling areas for tourists and nearby workers, and to increase the sense of destination for Embarcadero visitors.”

Harbor Drive Broadway Pier & Auxiliary Cruise Ship Terminal Broadway A-6-PSD Slide 5

A-6-PSD Slide 6

A-6-PSD Slide 7 Lane Field Broadway Pier Navy Broadway Complex Navy Pier County Administration Center

Broadway Pier Navy Broadway Complex Navy Pier

A-6-PSD Slide 10

A-6-PSD Slide 11

A-6-PSD Slide 12

Broadway Pacific Highway B Street Pier & Cruise Ship Terminal Lane Field Navy Broadway Complex Harbor Drive Broadway Pier A-6-PSD Slide 3 Auxiliary Cruise Ship Terminal (under construction)

Existing Port Master Plan Proposed Project A-6-PSD Slide 7

A-6-PSD Slide 9 Oval Park BROADWAY HARBOR DRIVE Lane Field Certified Port Master Plan Proposed Grape Street Pier (no longer being considered) Navy Pier Park (not constructed)