Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016.

Slides:



Advertisements
Similar presentations
Methodology for including power augmentation technology costs in the Mitigated Offer Cap ERCOT Ino González WMS July 10, 2013.
Advertisements

1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Split Generation Resources (SGRs) (Also known as Jointly Owned.
NPRR 336, Authorize ERCOT to Procure Additional RRS During Severe Cold Weather Consideration of Tenaska and Luminant Comments.
RCWG Update to WMS July 8, VCMRR008 - Alignment with NPRR700, Utilizing Actual Fuel Cost in Startup Offer Caps NPRR700 approved at May 2015 WMS.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
NPRRs NPRR680 Allow QSEs to Self-Arrange AS Quantities Greater Than Their AS Obligation. This Nodal Protocol Revision Request (NPRR) proposes to allow.
Real Time Mitigation During Exceptional Fuel Cost Events.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes January 28, 2009 WMS Meeting.
NPRR 511 and QSGR MOC ERCOT Settlements Meeting Title: WMS Date: March 13, 2013.
ERCOT RMR Basics Ino González Supervisor, S&B Market Analysis.
1 Settlement Changes R5 (SEP 2015) and R5.5 (OCT 2015) Blake Holt ERCOT COPS 9/14/2015.
Settlement of Mothballed RMR Resources for System Capacity November 15, 2011 RDTF Meeting Ino González ERCOT November 14, 2011.
Report to TAC February In Brief Chair and Vice-Chair for 2009 Chair and Vice-Chair for 2009 Working Group Reports Working Group Reports QMWG QMWG.
Guidelines for Verification of Resource Specific Fuel Adders RCWG Paul Vinson.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Mitigated Offer Cap Presented to: NATF Date: September 29, 2009 By: Mark Patterson, Manager Market Operations Support (ERCOT) 1September 29 NATF Meeting.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
RCWG Update to WMS July 10, General Update Agenda Items for Today: Fuel Adder NPRR 485-(no vote) Variable O&M for Technology Types (vote) Seasonal.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process TPTF Meeting Nov 28, 2007 Ino Gonzalez.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
RCWG Update to WMS December 5, General Update Agenda Items for Today: Verifiable Cost Manual clarifications (vote) White Paper on Long Term Fuel.
QMWG – Feb. 26, 2014 Discussion topic: NPRR585 Clarification of Administrative Pricing Requirements for Self-Committed Combined Cycle Combustion Turbines.
STANDARD & GENERIC COSTS FOR WOOD FIRED BIOMASS PLANTS H.BASARAN/B.CHAKKA AUSTIN ENERGY RCWG MEETING SEPTEMBER 21,
RCWG Update to WMS May 6, Real-Time Mitigation During Exceptional Fuel Events Option 3 – Increase MOC’s during Cold Weather Events When ERCOT.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Discussion of Fuel Oil Price (FOP) Bill Barnes TPTF 2/5/2008.
Photovoltaic and Storage Integration Workshop “Operational Issues” Kenneth Ragsdale October 15, 2012 ERCOT.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee June 3, 2010.
RCWG Update to WMS July 11, Alternatives to Address Negative Prices At its June meeting, WMS directed RCWG to bring back something to vote on. RCWG.
Lead from the front Texas Nodal 1 Texas Nodal Startup Eligibility Day-Ahead and RUC Make-Whole Settlements ERCOT Settlements & Billing.
Resource Cost Working Group October 7, 2015 WMS Update.
DAM Overview: Processes & Tools in the DAM Shams Siddiqi, Ph.D. Crescent Power, Inc. (512) April 2, 2008.
Resource Cost Working Group December 2, 2015 WMS Update.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Wholesale Market Subcommittee Update May 2 nd, 2013 Technical Advisory Committee.
Report to TAC March In Brief Voting Items Voting Items GATF – WMS endorsed the recommendations of the GATF GATF – WMS endorsed the recommendations.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
TPTF Verifiable Cost Sub-group Summary Final Report 3/xx/2008 Jim Galvin- TPTF VC Sub-group Chair.
NPRR 617 Overview and Justifications. Overview Current protocols place restrictions on Day-Ahead Three-Part Supply Offers – Part 1 (Startup Offer) – capped.
TPTF Verifiable Cost Sub-group Summary Report to TPTF 1/21/2008 Jim Galvin- TPTF VC Sub-group Chair.
WMS Meeting, October 10, RCWG Continuing Efforts  NPRR 747 Price Correction No consensus on this issue  RCWG needs additional guidance on the.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
RUC Startup Discussion. Problem The RUC language in the Nodal Protocols allows little or no ability for a generator to recover risk associated with operating.
1/07/2014 QMWG – RUC and AS update QMWG – ERCOT Update ERCOT Market Analysis.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs for Nodal WMS Meeting.
© ERCOT and 2004 Fleet Deployment and Settlements WMS Meeting August 19, 2004 Ino Gonzalez ERCOT Settlements
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
1 Nodal Stabilization Market Call December 16, 2010.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Reliability Unit Commitment (RUC) Settlements Business Requirements.
Overview of FIP Issues in the RUC, Verifiable Cost, and other Nodal Market Processes November 12, 2008 VCWG Meeting.
Settlement of Ancillary Service Infeasibility ERCOT QMWG April 15, 2016.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
NPRR784 Mitigated Offer Caps for RMR Units Protocol Revision Subcommittee June 16,
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 5, 2007.
Ancillary Services Replacement
Exceptional Fuel Costs in LMP
Resource Cost Working Group
Verifiable Cost Working Group (VCWG) Update
General Overview Of Resource Costs
RTDF Overview of Data Analysis & Status of “Consesus Items”
Resource Cost Working Group
NPRR 816 / Vendor Index Definitions
Vendor Definition of DAM Commitment
Presentation transcript:

Utilization of Fuel Costs in Ercot Markets Ino González RCWG Meeting 2/24/2016

Agenda Current Protocols NPRR617– Energy Offer Flexibility 2

PUBLIC 3 Current Protocols – Fuel Prices Description of Fuel Prices Fuel Index Price (FIP) – NP Section 2 Fuel Oil Price (FOP) – NP Section 2 Solid Fuel Price ($1.5/MMBtu) – NP Section 2 and

PUBLIC 4 Rules for Utilizing Fuel Prices – Current Protocols OfferVC 1 Offer CAPMOC 2 EOC MWP 3 CAP Cost Guarantee (DAM) Cost Guarantee (RUC) YY% in Offer 4 % in Offer n/a (use Offers) n/a (use Offers) YN% in Offer n/a (use Offers) n/a (use Offers) NY% in VC Min(FIP,FOP)n/a% in VC NNMin(FIP, FOP) Min(FIP, FOP) 5 n/aMin(FIP, FOP) 1 Verifiable Cost 2 Mitigated Offer Cap 3 Make Whole Payment 4 Fuel percent submitted in Offer 5 Coal and Lignite Generic MWP Cap = $18/MWh

PUBLIC 5 Rules for Utilizing Fuel Prices – With NPRR 617 Energy Offer Flexibility OfferVCOffer CAPMOCEOC MWP 1 CAP Cost Guarantee (DAM) 3 Cost Guarantee (RUC) 3 YY% in Offer % in VC YN% in Offer % in Offer 2 NY% in VC Min(FIP,FOP)n/a% in VC NNMin(FIP, FOP) Min(FIP, FOP) 4 n/aMin(FIP, FOP) 1 Make Whole Payment 2 Applicable only to Minimum Energy Cost. Generic Start-Up cost do not contain fuel rates 3 Guarantee Cost = Min(Offer, Resource Cost). Resource Cost based on Generic or VC 4 Coal and Lignite Generic MWP Cap = $18/MWh