GLAST LAT ProjectTEM/TPS MRR, September 16, 2004 4.1.7 DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)

Slides:



Advertisements
Similar presentations
1 LHC-DFBX Procurement Strategy Joseph Rasson LBNL Presented at the DFBX Production Readiness Review October 2002, LBNL Brookhaven - Fermilab - Berkeley.
Advertisements

SAE AS9100 Quality Systems - Aerospace Model for Quality Assurance
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Tracker Test Plan Overview.
GLAST LAT ProjectSIU MRR DAQ & FSWV1 1 GLAST Large Area Telescope: G. Haller SLAC (650) Gamma-ray Large Area Space.
GLAST LAT ProjectLAT I&T Subsystem CDR, March 28, 2003 Document: LAT-PR Section 4 - Page 1 GLAST Large Area Telescope: I & T Peer Review Performance.
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, ANick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT ProjectTEM/TPS TRR, Jan 7, DAQ & FSWV3 1 GLAST Large Area Telescope: Presented by G. Haller SLAC (650)
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware November 2004 Status Marc Campell, Subsystem Manager.
GLAST Large Area Telescope: Manufacturing Preparation Design Engineering Meeting Jerry Clinton 1 April 2003 Stanford Linear Accelerator Center Stanford,
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware July 2005 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMonthly Status Review – Sept. 1, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT Project4.1.7 G. Haller V21 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-to-Face Nov 04 Mike Huffer/Gunther.
GLAST LAT ProjectMonthly Status Review – December 2, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Darren Marsh SLAC Performance & Safety.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 15 Manufacturing & Processes 1 GLAST Large Area Telescope Manufacturing.
GLAST LAT ProjectF2F, June 15, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety Assurance Manager.
GLAST LAT ProjectF-to-F, June 15, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST LAT ProjectCDR/CD-3 Review May 12-16, 2003 Document: LAT-PR-01967Section 16 EEE Parts 1 GLAST Large Area Telescope Gamma-ray Large Area Space Telescope.
GLAST LAT Project November 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: I&T Integration Readiness Review Integration, Facility, Configuration.
GLAST LAT ProjectTEM &TEM-PS Manufacturing Readiness Review – September 16, 2004 GLAST Large Area Telescope: Performance & Safety Assurance Pat Lujan TEM.
GLAST LAT ProjectF-to-F, March, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Face-To-Face.
GLAST Calorimeter SLAC LAT Meeting 17Jul 2003 Naval Research Lab Washington DC wnjohnson 1 SLAC Meeting Calorimeter Subsystem 17 July 2003 W. N. Johnson.
GLAST LAT ProjectPDU/GASU MRR, February 3, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, G. Haller SLAC xxxx LAT Quality Engineer
GLAST LAT ProjectTKR Peer Design Review, Mar 24-25, BNick Virmani 1 GLAST Large Area Telescope Tracker Subsystem Gamma-ray Large Area Space Telescope.
GLAST LAT Project PDU/GASU MRR 4 February 2005 PART 2 / 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650)
9 March 2004 GIFTS Blackbody Subsystem Critical Design Review Project Plan Status Fred Best & Evan Richards 9 March 2004.
THEMIS Mission CDR JacksonUCB, June 14-18, 2004 Critical Design Review THEMIS Mission Assurance Critical Design Review Ron Jackson University of California.
GLAST LAT ProjectDOE/NASA DAQ Peer Critical Design Review, March 19-20, 2003 Nick Virmani 1 GLAST Large Area Telescope Data Acquisition Subsystem Gamma-ray.
THEMIS Instrument CDR(1) UCB, April 19 & 20, 2004 Mission Assurance Critical Design Review Ron Jackson University of California - Berkeley.
GLAST LAT ProjectMonthly Review, March 30, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
C osmic R Ay T elescope for the E ffects of R adiation PERFORMANCE ASSURANCE BRIAN KLATT MISSION ASSURANCE MANAGER.
GLAST LAT ProjectMay 25, 2006: Pre-Environmental Test Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: Pre-Environmental Test.
GLAST LAT ProjectApril 27, 2006: LAT Pre-Ship Review Presentation 12 of 12 Quality Assurance 1 GLAST Large Area Telescope: LAT Pre-Ship Review Performance.
GLAST LAT ProjectCDR/CD3 Review May 12-16, 2003 Document: LAT-PR Section 15 Manufacturing Process 1 GLAST Large Area Telescope Manufacturing Process.
GLAST LAT ProjectCAL Peer Design Review, Mar 17-18, 2003 N. Virmani Naval Research Lab Washington DC GLAST Large Area Telescope Calorimeter Subsystem Gamma-ray.
1 GLAST LAT ProjectMechanical Systems Mechanical Systems Mechanical / Thermal Hardware December 2004 Status Marc Campell, Subsystem Manager.
GLAST LAT ProjectMarch 24, H Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS H: Tower Shipping and Storage.
Tracker SSD Ladder Preproduction Review Actions and Changes Since Last Week September 16, 2002 Alessandro Brez Robert Johnson.
GLAST LAT ProjectMonthly Status Review – June 30, 2005 GLAST Large Area Telescope: Performance & Safety Assurance Joseph Cullinan SLAC Performance & Safety.
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMonthly Review, May 24, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept EFW INST+SOC PDR97 RBSP Electric Field and Waves Instrument (EFW) Product.
GLAST LAT ProjectMarch 24, C Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS C: Electronics Module Testing.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectMonthly Review, June 30, DAQ & FSWV2 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
GLAST LAT ProjectMarch 24, E Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS E: MCM Assembly Gamma-ray.
GLAST LAT ProjectDOE/NASA Peer Critical Design Review, March 19-20, 2003 J. Clinton 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Instrument.
GLAST LAT Project4.1.7 G. Haller V31 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S Monthly Status Gunther.
GLAST LAT ProjectFebruary 10, 2004 R. Johnson Tracker MCM Production Readiness Review 1 LAT QA has hired a full-time on-site representative (Donald Knaepple)
THEMIS Instrument PDRMission Assurance- 1 UCB, October 15-16, 2003 THEMIS Mission Assurance Preliminary Design Review Ron Jackson University of California.
1 MAVEN Documentation Training. Date September 12, 2011 Particles and Fields Package (PFP) MAVEN - FLT Traveler Book Documentation Training Safety and.
LAT Design Integration and Analysis1 GLAST LAT Project24 May 2005 LAT Monthly Status Review 24 May 2005 Design Integration and Analysis LAT Monthly Status.
LAT-PR GLAST LAT ProjectManufacturing Readiness Review, Oct. 12, 2005 LAT Test Stand Manufacturing Readiness Review 1.Introduction Bill Olson.
GLAST LAT ProjectMarch 24, A Tracker Peer Review, WBS GLAST Large Area Telescope: Tracker Subsystem WBS A: Parts and Materials Procurement.
STEREO IMPACT Critical Design Review 2002 November 20,21,22 1 STEREO Product Assurance Ron Jackson
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 100 EFW DFB Systems Assurance Trent Taylor LASP.
GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: Gunther Haller SLAC (650)
GLAST LAT ProjectMonthly Review, Sept 27, DAQ & FSWV1 1 GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software W.B.S
Bill Raynor Naval Research Lab
GLAST Large Area Telescope:
EFW DFB Systems Assurance
EFW DFB Systems Assurance
THEMIS Mission Assurance
ISUAL Product Assurance
GLAST Large Area Telescope
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope:
GLAST Large Area Telescope
GLAST Large Area Telescope:
Presentation transcript:

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 1 GLAST Large Area Telescope: B. Estey, Production SLAC (650) Gamma-ray Large Area Space Telescope TEM/TPS MRR Part 2

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 2 Parts, Materials, and Processes EEE Parts –All EEE parts have been approved for use by the Program Parts Board –Status of TEM Parts Qualification (highlighted yellow items=part approved, not in use):

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 3 Parts, Materials, and Processes EEE Parts –Status of TEM Parts Qualification, cont’d (highlighted yellow items=part approved, not in use):

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 4 Parts, Materials, and Processes EEE Parts, cont’d –Status of TPS Parts Qualification (highlighted yellow items=part approved, not in use):

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 5 Parts, Materials, and Processes EEE Parts, cont’d –Status of TPS Parts Qualification, cont’d (highlighted yellow items=part approved, not in use):

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 6 Parts, Materials, and Processes EEE Parts, cont’d –Status of TPS Parts Qualification, cont’d (highlighted yellow items=part approved, not in use):

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 7 Parts, Materials, and Processes Materials –All Materials have been approved by the Program MPRB in accordance with LAT-SS-00107, LAT Mechanical Parts Plan GLAST/LAT Material Usage Agreement #002 (MAR DID No. 313; LAT Document # LAT-TD )- Approved 9/13/04 Processes –All processes have been reviewed and approved by the Program MPRB in accordance with LAT-SS , LAT Mechanical Parts Plan

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 8 Procurement Status Assembly Subcontractor –GTC Corp. was awarded the contract to provide the assembly service and some environmental testing for all levels of the TEM/TPS (Reference LAT-PS-03078, SOW LAT TPS and LAT-PS-02615, SOW LAT TEM) GTC Corp. is located in Albuquerque, New Mexico EEE Parts –All EEE parts are SLAC furnished and have been procured for the TEM and TPS Outstanding receipt of Novacap Capacitors expected 9/16/04 –Part no. 1210B563K251YHTM Outstanding receipt of balance of tantalum capacitors expected 9/20/04 –Part nos. CWR11FH475KDB and CWR11FH105KDB Metal Fab Parts and Fasteners –All Metal Fab parts and Fasteners are SLAC furnished and have been procured for the TEM and TPS Outstanding receipt of TPS Box Bases, LAT-DS expected 9/16/04 Outstanding receipt of TEM Connector Plates, LAT-DS-01026, expected 9/17/04 Outstanding receipt of balance of Heat Sinks, TPS, LAT-DS-04101, expected 9/24/04 Outstanding receipt of balance of Cable Harness Support, TPS, LAT-DS-03598, expected 9/24/04 PWBs –The PWBs for TEM and TPS are SLAC furnished and have been contracted to DDI Fabrication complete on Qual + 2, balance of PWBs to be fabricated pending successful data review of TEM and TPS Module performance

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 9 Procurement Status FPGA Programming –Programming of the FPGAs has been contracted to ACTEL Programming complete on Qual + 2, balance of FPGAs to be programmed pending successful data review of TEM and TPS Module performance Materials –Assembly materials are furnished by GTC Corp. in accordance with drawing requirements (adhesives, conformal coating, wire, primer, etc.)

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 10 Manufacturing Facilites Assembly contract has been awarded to General Technology Corporation, located in Albuquerque, New Mexico –Capabilities Overview DS/Multilayer PC Boards assembled to Mil-Spec Thru-hole and Surface Mount Technology (SMT) Electro/mechanical Assembly Cables and Harnessing Conformal Coating Testing (Including ESS) –Facilities Overview 72,000 ft 2 Custom Built Manufacturing Facility –TEM/TPS assembly and test to be performed in an environmentally controlled area with monitoring capabilities for temperature and relative humidity –Facility complies with the ESD control requirements specified in ANSI/ESD Manufacturing Engineering Test Stockroom Administration –Certifications GTC performs to the intent of the following certifications assuring quality assembly –MIL-STD -2000A –IPC-A-610C –IPC/WHMA-A-620 –MIL-STD-454 –IPC/EIA J-STD-001C –MIL-I –ISO 9002

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 11 Manufacturing Process Flow- GTC Materials notes –Receiving inspection will be performed on all materials supplied by the customer using documents supplied –All discrepancies shall be documented and relayed to the customer in 24 hours from their discovery –All moisture sensitive materials used in the manufacturing of the TEM will be stored and handled in accordance with GTC-2025A -Moisture Sensitive Component Handling, Use of Dry Room Storage. –Materials issued in the production of TEM/TPS for assembly will be traced in a manner that would enable traceability from the assy S/N to the individual part /piece and production lot/date code. –Every TEM and TPS assembly will have its own traveler issued to facilitate traceability of IC serial numbers installed on that particular CCA.

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 12 Manufacturing Process Flow-GTC Materials Receive KIT OK Not OK Contact SLAC/ Resolve issue Issue Kit To prod. Clean and bake PCB Inspect

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 13 Manufacturing Process Flow-GTC SMT area notes –Operators will record all IC serial numbers and location at which they are installed on a particular CAA for traceability purposes. All IC’s used in the production of TEM assemblies are serialized. –Operators will inspect and measure the solder paste height on every print at 3 predetermined locations. The results will be recorded in the SMT printer log along w the printing parameters

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 14 Manufacturing Process Flow-GTC SMT Production Area Inspect Kit Set Up P&P and SP Screen print Solder side OK P&P all SMT components 1 st art. Inspection Reflow Inspect Not OK Clean OK Not OK Touch up Clean Not Ok Contact SLAC Correct root cause ok Inspect/ Measure

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 15 Manufacturing Process Flow-GTC Second Operations Install connectorsSolder connectors Inspect OK Clean Not OK Touch up Move to test Contact SLAC MRB

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 16 Manufacturing Process Flow-GTC CCA Test ICT Top/Bt Pass Fail Touch up Functional test Fail Pass Stake HW & components Touch-up Contact SLAC MRB

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 17 Manufacturing Process Flow-GTC Module assy/conformal coating/thermal cycling Conformal coat. Inspect OK No Apply thermal Adhesive And mount CCA in Chassis base Touch up Conformal coat Functional test CCA level Thermal cycling Apply Kapton to Back side of CCA Move to next op. Contact SLAC MRB

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 18 Manufacturing Process Flow-GTC Module Level Test Vacuum de-gas Adhesive cure Inspect ok no Install chassis Top cover Stake HW Contact SLAC MRB Module Assy level Thermal Cycling Functional test Move to next op. Functional test

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 19 Manufacturing Process Flow-GTC Top assembly/final test/final inspection Assemble TEM/TPS Stake HW Top Assy level Thermal Cycling Source inspection &EIDP review Pack & ship to SLAC Vibration test Functional test Final functional test Functional Test

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 20 Configuration Management Required changes to documentation during the manufacturing phase at GTC will be immediately documented on an NCMR and forwarded to SLAC for disposition All outstanding changes to documents will be incorporated and a new revision released into LAT DOCs prior to final inspection at each manufacturing level (CCA, Module, Top Assembly)

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 21 Configuration Management All change notices will include full disposition of hardware Disposition of Hardware

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 22 GTC Test Requirements Figure 1. Vibration Levels, Duration, and Spectra

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 23 GTC Qualification and Acceptance Test Matrix

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 24 Production Schedule

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 25 Production Schedule

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 26 Production Schedule

GLAST LAT ProjectTEM/TPS MRR, September 16, DAQ & FSWV1 27 Issues/Concerns Actel FPGAs pose a reliability concern Maxim 724 is rated at V, we are biasing to operating at 1.5V. Parts were not screened for this application, PCB reviewing screening requirements.