Masa Ono Questions to be discussed will be how much we should glow (if any of what type for how long) and/or the degree of lithium deposition prior to.

Slides:



Advertisements
Similar presentations
ECEU300 Ethics in the Workplace Why talk about Ethics? Everyone is ethical, everyone knows how to behave at work. Everyone gets it about not stealing stuff.
Advertisements

XP 1157 Increasing the CHI start-up current magnitude in NSTX B.A. Nelson et al. 1.
ASIPP Characteristics of edge localized modes in the superconducting tokamak EAST M. Jiang Institute of Plasma Physics Chinese Academy of Sciences The.
ASC XP-823 Error Field Correction and Long Pulse J.E. Menard, S.P. Gerhardt Part 1 Determine the source of, and optimal correction for, the observed n=3.
Hitting the Jackpot with Your Performance Review SWON Staff Symposium.
Algebra Problems… Solutions Algebra Problems… Solutions © 2007 Herbert I. Gross Set 5 By Herbert I. Gross and Richard A. Medeiros next.
Evaporators For Air Conditioning
LAPPD status report. 6cm system status  System up and running since July –Temperature profile carefully mapped out in sealing and deposition chambers.
PFC meeting 9-11 May 2005 PPPL CDX-U E-beam experiments on CDX-U Presented by Dick Majeski R. Kaita, T. Gray, H. Kugel, J. Spaleta, J. Timberlake, L. Zakharov.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman Final XP Review June 5, 2009 NSTX Supported by.
TALKING TO THE PATIENT AND FAMILY!. While talking to the patient and their family… *Sit down and make eye contact with the patient and their family.
ASIPP Development of a new liquid lithium limiter with a re-filling system in HT-7 G. Z. Zuo, J. S. Hu, Z.S, J. G. Li,HT-7 team July 19-20, 2011 Institute.
HT-7 Lithium coating and its influence on plasma performance on HT-7 Z. Sun, J.S. Hu, G.Z. Zuo, J.G. Li ASIPP
1 Public Hearing to Consider Proposed Amendments to the Emission Inventory Criteria and Guidelines Regulation for the AB 2588 Air Toxics “Hot Spots” Program.
Mid-Run Assessment - ISD S. Kaye, D. Gates 10 May 2006.
V. A. Soukhanovskii NSTX Team XP Review 31 January 2006 Princeton, NJ Supported by Office of Science Divertor heat flux reduction and detachment in lower.
V. A. Soukhanovskii 1 Acknowledgement s: R. Maingi 2, D. A. Gates 3, J. Menard 3, R. Raman 4, R. E. Bell 3, C. E. Bush 2, R. Kaita 3, H. W. Kugel 3, B.
1Physics Operators Course, PCS Navigation, D.J. Battaglia, September 15, 2015 Devon Battaglia, Keith Erickson, Dennis Mueller, Stefan Gerhardt, Roger Raman,
NSTX-U NSTX-U PAC-31 Response to Questions – Day 1 Summary of Answers Q: Maximum pulse length at 1MA, 0.75T, 1 st year parameters? –A1: Full 5 seconds.
MICE CC Test Status Ruben Carcagno 11/06/13 1. Cooldown Coil Temperature (calculated average in each of 8 coil segments) SC Transition (voltages across.
Introduction to Plasma- Surface Interactions Lecture 3 Atomic and Molecular Processes.
NSTX-U cryo/particle control discussion #8 December 19, 2012 What have we done, or plan to do to be responsive to PAC questions, and in prep for 5 year.
Advances In High Harmonic Fast Wave Heating of NSTX H-mode Plasmas P. M. Ryan, J-W Ahn, G. Chen, D. L. Green, E. F. Jaeger, R. Maingi, J. B. Wilgen - Oak.
RFX-mod programme workshop 2011 February 7 - 9, 2011 Wall conditioning techniques: status and perspectives S.Dal Bello, A.Canton, L.Grando, P.Innocente,
CHI Run Summary for March 10-12, 31 & April 9, 2008 Flux savings from inductive drive of a Transient CHI started plasma (XP817) R. Raman, B.A. Nelson,
Engineering Operations FY08 Outage: In-Vessel Work: –BSE Vacuum Vessel Interfaces Completed –Liquid Lithium Divertor Tray trial fit-ups –HHFW Antennas.
Results of the argon beam test at Linac3 D. Küchler BE/ABP/HSL Including feedback from R. Scrivens and M. Bodendorfer.
Session I-B – Overview Talks Lithium in Magnetic Confinement Experiments S. MirnovLi collection experiments on T-11M and T-10 in framework of Li closed.
EFDA EUROPEAN FUSION DEVELOPMENT AGREEMENT Task Force S1 J.Ongena 19th IAEA Fusion Energy Conference, Lyon Towards the realization on JET of an.
Whether or Not It’s Weathering! An Introduction to and Interactive Assessment About Weathering and Erosion.
Erosion/redeposition analysis of CMOD Molybdenum divertor and NSTX Liquid Lithium Divertor J.N. Brooks, J.P. Allain Purdue University PFC Meeting MIT,
Recall The Team Skills 1. Analyzing the Problem (with 5 steps) 2. Understanding User and Stakeholder Needs 3. Defining the System A Use Case Primer Organizing.
Rajesh Maingi Oak Ridge National Laboratory M. Bell b, T. Biewer b, C.S. Chang g, R. Maqueda c, R. Bell b, C. Bush a, D. Gates b, S. Kaye b, H. Kugel b,
RFX-mod programme workshop, January 2009 Scenario and operational issues for high current L. Zanotto, R. Cavazzana, S. Dal Bello, F. Milani.
NCSX NCSX CDR May 21-23, 2002 H.W. Kugel Slide 1 Conceptual Design for NCSX Auxiliary Systems Heating, Fueling,Wall Conditioning and Vacuum Systems.
Development and characterization of intermediate- δ discharge with lithium coatings XP-919 Josh Kallman XP Review - ASC Feb 2, 2009 NSTX Supported by College.
Low-density Start-up D. Mueller, M. Bell, S. Gerhardt, J. Menard, R. Raman, S. Sabbagh NSTX FY12 low density discussion: May 12, 2011.
GOLEM operation based on some results from CASTOR
045-05/rs PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Taming The Physics For Commercial Fusion Power Plants ARIES Team Meeting.
Scientific Method Fish Behavior By: Tiffany 6D. Problem/ Question How can different temperature of Earth’s water affect aquatic living things (fishes)?
Solenoid Free Plasma Start-up Mid-Run Summary (FY 2008) R. Raman and D. Mueller Univ. of Wash. / PPPL 16 April 2008, PPPL 1 Supported by Office of Science.
Summary of RF Work To Date G. Taylor NSTX Monday Physics Meeting June 21, 2010 NSTX Supported by 1.
NSTX-U Run Planning Guidance for 2015 NSTX-U Research Forum 1 FY2015 (and 2016) research milestones will guide prioritization of eXperimental Proposal.
1 Run7 startup M. Sullivan MAC Review Nov , 2007 M. Sullivan for the PEP-II Team Machine Advisory Committee Review November 15-17, 2007 Run 7 Startup.
Engineering Operations Outage Status: Tile cleaning is complete Tentatively planning on 2 LITER operation. Design Review upcoming Shielding of HHFW/in-vessel.
FY WEP TSG Goals & WEP-Relevant Diagnostic Upgrades NSTX Supported by WEP TSG Meeting September 14,
Chris Booth & Paul Smith Sheffield 16 th August 2007 MICE Target Installation.
Supported by Office of Science NSTX S.M. Kaye, PPPL ITPA PPPL 5-7 Oct Confinement and Transport in NSTX: Lithiumized vs non-Lithiumized Plasmas Culham.
Development and Assessment of “X-point limiter” Plasmas M. Bell, R. Maingi, K-C. Lee Coping with both steady-state and transient (ELM) heat loads is a.
NSTX NSTX Team Meeting –Masa Ono August 14, 2015 Masa Ono February 5, 2016 NSTX-U Team Meeting.
Linac2 and Linac3 D. Küchler for the linac team. Planning first preparative meeting for the start-up of Linac2 in June 2013 –this early kick-off useful.
Engineering Operations Outage Schedule The vessel & beamline are under vacuum. 1st Bake-out complete. Air leaks found and fixed. The OH coil will be installed.
1 Roger Raman for the NSTX Research Team University of Washington, Seattle Update on the NSTX Run Plan PPPL, Princeton, NJ, 15 May, 2006 Supported by Office.
LRTSG Milestone Review 12/16/10 Lithium Research Topical Science Group FY11-FY12 Milestone Review II Charles Skinner for LRTSG 1/7 Follow up to 11/29/10.
1 E. Kolemen / IAEA / October 2012 Egemen Kolemen 1, A.S. Welander 2, R.J. La Haye 2, N.W. Eidietis 2, D.A. Humphreys 2, J. Lohr 2, V. Noraky 2, B.G. Penaflor.
Engineering Operations TF Commissioning Mechanical testing of TF flag/box assemblies complete, inner bundle installed, and all joints made up. Joint resistance.
1NSTX-U Team Meeting – August 14, 2015 Jon Menard NSTX-U Program Director NSTX-U Program Update NSTX-U Team Meeting PPPL - MGB August 14, 2015 This work.
NSTX APS-DPP: SD/SMKNov Abstract The transport properties of NSTX plasmas obtained during the 2008 experimental campaign have been studied and.
Methane Update and Run Plan Ben Jones. Configuration 8 inch PMT with TPB plate - 8” from alpha source - Now includes magnetic shield - 2 inch PMT without.
For the NSTX Five-Year Research Program 2009 – 2013 M.G. Bell Facility and Diagnostic Plans.
European Organization for Nuclear Research - Organisation européenne pour la recherche nucléaire CO 2 IBL plant failures 16/06/ /06/2016 O.Crespo-Lopez.
K. H. Lee, H. Y. Lee, Young-Gi Kim, J. Yang, S. M. Yang, K.J. Chung, Y.S. Na and Y. S. Hwang Residual Gas analysis during Glow discharge cleaning, Baking.
of secondary light ion beams
-Honors Thesis Defense- In Situ Ellipsometry of Surfaces in an Ultrahigh Vacuum Thin Film Deposition Chamber Joseph Choi Department of Physics and Astronomy,
L-H power threshold and ELM control techniques: experiments on MAST and JET Carlos Hidalgo EURATOM-CIEMAT Acknowledgments to: A. Kirk (MAST) European.
Which earth cycle am I? Answer the questions to figure out what I am. Am I the Water Cycle Nitrogen Cycle Carbon Cycle Oxygen Cycle.
Matthias Raschendorfer 2007
Erosion of Advanced Test Reactor Fuel Elements
Process State Model -Compiled by Sheetal for CSIT
Detailed Design Review Solar Thermal Water Heater
Presentation transcript:

Masa Ono Questions to be discussed will be how much we should glow (if any of what type for how long) and/or the degree of lithium deposition prior to the run.

Unofficial Start-up Plan Duplicate March start-up (as close as possible) 5% Lithium fill (1 day) – Evaporate Lithium from E-H? Will that form LiC? – He glow before to clean plates? Or dirty them? XMP064 to evaluate – Argon glow, more lithium to solve problems. Revisit LLD with 50% fill in June with better conditioned machine, proper personnel and modified XP1000 Proceed with “high triangularity” experiments until revisit of LLD. Then, during/before a partial or full maintenance week, heat the LLD again to evaporate the Lithium and start over with 3-4 days of Lithium evaporation and go into a modified XP1000 as discussed at the last LR-TSG meeting.

Vlad Soukhanovskii comments I am surprised to hear that the LLD experiment is considered for the week of May 24th, when the PSI conference is taking place,and when we are all gone to San Diego. I think a bigger concern is the NSTX start-up XMP064 after several argon vents. These vents had a potential to introduce water and oxygen into the vacuum vessel and minimize the bake-out effect and oxidize the lithium already deposited. I fully agree with Henry’s plan – 1) In the week of May 24th, use medium LITER rates, run high triangularity fiducials, carefully evaluate machine conditions aka XMP064 and then have a discussion on how to proceed (He/ D /Ar GDC, more LITER ?) – 2) Run XP1000/ XP1001 sometime in late June, when LLD, LITER ready and more diagnostics may be on-line. To quantify the LLD pumping or non-pumping, introduce elements of XP1001 into the LLD experiment.

JEM concerns/questions Concerned that multiple Ar vents have: – Allowed *oxides from H 2 O/air to form on plasma facing surfaces – Allowed too much Ar to bond (loosely) to surface – JEM worried we will inadvertently burry Ar and/or oxides with 1 day Li, which will later be liberated in uncontrolled ways  irreproducible shots How much Ar is in the machine? How much is acceptable? – Have bad memories of M. Bitter Ar injection experiments in middle of previous decade – recall increased H-mode threshold, radiation, reduced pulse length… If problematic, is He glow to remove Ar advisable? – And didn’t we already have Ne glow, so perhaps any impact on LLD would be comparatively minor anyway? JEM personal opinion uninformed by data (and subject to ridicule!): – If Ar level in vessel is noticeably higher than usual, should run ½ hr He glow to see if Ar level is reduced. If some reasonable clean-up is observed, continue He glow until Ar is reduced to 2-3x normal pre-run levels (or lower). – Positive side effect is additional removal of oxides by He (+Ar?) glow – Risk is sputtering C onto LLD. Any diagnostics to know if this is a problem? Then, try to make plasmas with normal LITER ops (20-40mg/min) – If that fails, try 1 day LITER method, then if that fails assess if oxide or Ar issue

XP Scheduling

and into week 9...

Rajesh Maingi 1.Li deposition - agree with Henry that we should fill LLD to at least 50% 2.Mechanism to look for reduced LLD pumping and reduced density: we should re-introduce modest ELMs so that the particle confinement is not very large, which makes comparison difficult. This implies some expts. with lowish IP ~ MA and n=3 triggered ELMs as part of Henry's assessment 3.GDC - haven't followed closely enough to render a good opinion

Hosea: GA FDR conflicts week of June 7,switch with June 14 w/ Phil Ryan approval? Kolemen: At a conference week of May 31 st Solomen: On vacation week of June 12. Rajesh: Swap June 2 and June 11? Vlad: Waiting for DIMS, expected mid-June

Rajesh Maingi The temperature profiles look rather good, and one can see a change in the single color temps as compared to 2-color right at the melting/freezing point (180), where 2 color gives the right answer and single color ones deviate (lower). So technique seems to be working ok and correcting emissivity differences, as hoped. Its a high priority to turn these into heat fluxes routinely, and I think we'll get that soon, hopefully some time next week just after PSI drafts are sent for co-author review.