A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Phase II Collimators: design status, options and future outlook LHC.

Slides:



Advertisements
Similar presentations
Status of the LARP Phase II Secondary Collimator Prototype 30 September 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US.
Advertisements

Stephen Milton Undulator System 20 April, 2006 LCLS Undulator System Update S. Milton, ANL FAC, April 20 th, 2006.
Status of the LARP Phase II Secondary Collimator Prototype 14 October 2013 LHC Collimation WG Meeting Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC.
ENEN Collimator Materials for LHC Luminosity Upgrade: Status of Irradiation Studies at BNL Collimation Upgrade Specification Meeting 21/06/2013 N. Mariani.
SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
Status of R&D and Beam Plans for Low-Impedance Collimators F. Carra 1,2 A. Bertarelli, R. Bruce, A. Dallocchio, M. Garlasché, L. Gentini, P. Gradassi,
A. Bertarelli – A. DallocchioLHC Collimation Phase II – Specification Meeting – 7/11/2008 Phase II Collimators: design status, options and future outlook.
Possible HTS wire implementation Amalia Ballarino Care HHH Working Meeting LHC beam-beam effects and beam-beam interaction CERN, 28 th August 2008.
MECHANICAL DESIGN OF TCSP COLLIMATORS Secondary Collimators Embedding BPMs L. GENTINI, A. Dallocchio, A. Bertarelli, F. Carra, M. Garlasche.
Introduction to collimators Integration of BPM Mechanical design Electrical design Processing Simulations Results Conclusions & Outlook.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
1 LARP Phase II Secondary Rotatable Collimator Evolution of design changes 3 rd March, 2010.
Engineering Department ENEN Status of TCSP manufacturing Collimation Working Group (CWG) 24 June 2013 A. Dallocchio, A. Bertarelli, F. Carra, L. Gentini,
TCDI operation until LS2 LIU-SPS-to-LHC Transfer Line Protection Devices (TCDI) Review 1 Oliver Aberle 26/03/2014 O. Aberle (EN-STI-TCD)
LHC Phase II Collimator Compact jaw simulations New FLUKA => ANSYS mapping scheme New 136mm x 950mm jaw –60cm primary collimator –Helical cooling channel.
Engineering Department ENEN R&D on Advanced Materials: Status and Future Outlook N. Mariani, A. Bertarelli, F. Carra, A. Dallocchio, E. Krzyzak 1 st Meeting.
Engineering Department ENEN Screwed solutions for the new tertiary collimator jaw assembly Federico Carra (CERN EN/MME) Geneva, 4 th September th.
Dry type transformers Zaragoza Aluminum vs. Copper
LHC Machine Protection System Review LHC Machine Protection System Review Oliver Aberle13 April 2005 with input from R. Assmann and R. Losito Ensuring.
RA CPM 21/2/03 1 Present Approach and Status R. Assmann for the LHC Collimation Team Problem: Al/Cu system would not resist irregular dumps (pre-trigger.
A. Bertarelli, A. DallocchioLHC Collimation Phase II – Conceptual Review 02/04/2009 Phase II Collimators at CERN: design status and proposals LHC Collimation.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
A. Bertarelli – R. Perret CERN TS – MME Group 1 CERN European Organization for Nuclear Research Mechanical Engineering and Thermo-mechanical.
ENEN Collimator Materials for LHC Luminosity Upgrade: Proposal of Irradiation Studies at BNL Collimation Upgrade Specification Meeting 15/02/2013 N. Mariani.
CERN Phase II Collimation Conceptual Review Summary 09 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
CERN-SLAC meeting June, The LHC Collimator Project LHC Collimators for Phase 1 CERN-SLAC meeting – June, Palo Alto, Ca Alessandro Bertarelli.
STATUS OF H0/H- DUMPS M. Delonca – LIU meeting 29/11/2012 Thanks to: C. Maglioni, A. Patapenka, C. Pasquino, A. Perez, N. Mariani.
Main features of PETS tank J. Calero, D. Carrillo, J.L. Gutiérrez, E. Rodríguez, F. Toral CERN, 17/10/2007 (I will review the present status of the PETS.
AdColMat: Status of the Working Group and Recent Advancements Working Group on Advanced Materials for Collimators 4 th Meeting - 21/7/2014 A. Dallocchio.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
BNL Irradiation Facility Use Collimator Materials for LHC Luminosity Upgrade.
A. Bertarelli, A. DallocchioEuCARD/ColMat Kick-off Meeting 17/06/2009 EuCARD/ColMat Kick-off Meeting EuCARD/ColMat Kick-off Meeting 17 th June, 2009 A.Bertarelli,
LHC Collimators Phase 2 - Visit to Plansee 28th August Materials for Phase II collimators.
Updated Design of TCLD whit reduced jaw length Collimation Upgrade Specification meeting L. GENTINI.
Upgrade PO M. Tyndel, MIWG Review plans p1 Nov 1 st, CERN Module integration Review – Decision process  Information will be gathered for each concept.
The integration of 420 m detectors into the LHC
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
NM4SixTrack Implementation of new composite materials for HL-LHC collimator upgrades in SixTrack “Tracking for SixTrack” workshop – CERN, R.
A. Bertarelli – A. DallocchioWorkshop on Materials for Collimators and Beam absorbers, 4 th Sept 2007 LHC Collimators (Phase II): What is an ideal material.
LARP LHC PHASE II COLL RC1 TESTS - S. Lundgren 10 Dec 2007 No 1 /12 LARP Phase II Secondary Collimator RC1 Collimator Development and Test Program Status.
LARP LHC PHASE II COLL RC1 - S. Lundgren 21 Sep 2009 No 1/17 LARP Phase II Secondary Collimator RC-1 Collimator Development Status and Outlook Revised.
ENEN Research and Development of Novel Advanced Materials for Next-generation Collimators A. Bertarelli, G. Arnau Izquierdo, F. Carra, A. Dallocchio,
High Energy Dump of the Super Proton Synchrotron at CERN – Present and Future designs A. Perillo-Marcone (EN-STI) Contributions from several colleagues.
SPS High Energy LSS5 Thermal contact & cooling aspects
Engineering Department ENEN Introduction to EuCARD2 WP 11: Collimator Materials for fast High Density Energy Density Deposition (ColMat-HDED) Alessandro.
on behalf of the Phase II Collimation Design team
STI test HRMT-35 and Collimator plans for 2017 Special ColUSM: Material and design readiness for LS2 productions 2th May 2017 I. Lamas Garcia,
News and Introduction from CERN June 15th, 2005
New Materials for Extreme Thermal Management – PowerMat: Task 17.2
Motivations and Introduction to MultiMat Experiment in HiRadMat
LARP Phase II Secondary Collimator RC1, ETC - Status 4/10/06
Status of material tests
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1
LARP Phase II Secondary Collimator RC1 Review SLAC 12/15/05 RC1 Construction and Test Plan LARP LHC PHASE II COLL REVIEW – RC1.
Joint Meeting SPS Upgrade Study Group and SPS Task Force
TCTW Collimator Design F. Carra1,2 A. Bertarelli, M. Garlasche, L
Federico Carra – EN-MME
EuCARD 1st Annual Meeting
2th EuCard Col/Mat WP Meeting
UK RFD Pre-Series cryomodule
Recommendations of 12/16/05 review committee & SLAC response
Planning Quality control - Manufacturing logbook Photos Conclusions
23 April 2012 Tom Markiewicz/SLAC
Phase II Collimators : design status
HiRadMat Test Facility
External Review of LHC Collimation Project Oliver Aberle 1th July 2004
LARP Rotatable Collimators for LHC Phase II Collimation
Micro Status Report of SLAC Phase II Plan Tom Markiewicz SLAC
Presentation transcript:

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Phase II Collimators: design status, options and future outlook LHC Collimation Phase II 10 th Design Meeting 19 th September, 2008 Alessandro Bertarelli Alessandro Dallocchio

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 …excerpts from last LHC MAC (R. Assmann talk)… Overall time plan Scheduling:  Define general directions until July 08.  Prepare conceptual design until October 08.  Discuss conceptual design and organize project details in November 08.  Testing of hardware in 2009/10 (lab and beam tests).  Time plan will be (is already?) affected by start of LHC beam operation (highest priority to make phase 1 collimation system work). :.  Important milestone: Review of conceptual design with parallel development paths in late autumn 2008.

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/ Functional Specification   Phase II present boundary conditions:   New Secondary collimators (TCSM) to be placed immediately downstream of Phase I Secondary collimators (TCSG)   Stands, electric and water connections already available   Same interfaces as Phase I   Affecting only IP 3 and IP7 (~ 30 units), no modifications to SC areas.   Additional collimators and modifications in SC areas may be required to overcome intensity limitations.   Phase II goals (our interpretation):   Gain factor ≥10 in cleaning efficiency.   Gain factor ≥10 in impedance.   Gain factor ≥10 in set-up time (and accuracy?).   Radiation hardness and easy handling.   Improved geometrical stability (in operating conditions) 20  m   Sufficient robustness (like Phase I?). Minimal system

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Functional Specification   Modular concept to fit in alternative jaw materials (All-metal, Metal- diamond, Ceramics-metal, Thin foil etc.) and concepts (alternative cooling systems)   Increase geometrical stability and precision (e.g. jaw flatness).   Increase cooling capacity.   Capitalize Phase I experience to improve existing design (e.g. new moving tables)   Collaboration with external partners to identify, develop and test novel advanced materials (EPFL, Plansee, Politecnico di Torino, Kurchatov, BNL)   Possibility to embed in jaw design Beam diagnostic devices (BPMs, BLM(?) …) Design Guidelines as we see them …

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Jaw+cooling system Fine adjustment System Rigid Support (back- stiffener) Baseline of the design geometrical stability Preliminary design is based on the concept of a back stiffener remaining at uniform temperature and ensuring geometrical stability of the jaw beam. Back stiffener Metal support (cooler) Jaw (monolithic case shown)

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Main components of Phase II jaw assembly:  Back-stiffener  Fine adjustment system  Equipped Jaw  Collimation Jaw  Jaw Cooling system  Beam diagnostics devices  RF system Baseline of the design

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Stiffener material requirements: Minimise thermal bending Low CTE High thermal conductivity Minimise deflection provoked by the force in the adjustable system High Young’s modulus MOLYBDENUM Molybdenum Back-stiffener Stiffener plates (~1.1 m long; up to 20 mm thick) Fine adjustable system support fastened to plates Stiffener ribs fastened to plates The design is already at an advanced stage, Mo seems to be the best candidate. PLANSEE confirmed the feasibility of this component (10-12 weeks to produce a prototype).

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Fine adjustment system Fine adjustment system (overall deflection controlled) Cooling pipes on the stiffener plates (geometrical stability) …feasibility of Mo screws confirmed by PLANSEE…

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Jaw and cooler: Design options …depending on RF and cleaning efficiency specifications…

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Collimation jaw  Monolithic metallic jaw (Glidcop) – Studied.  Monolithic Cu-diamond + Cu coating – Being studied  Plansee available for advanced co-design (investment necessary?)  Monolithic Al-diamond + Al coating – Being studied  Collaboration with EPFL already launched: Development of Al-CD jaw + Al coating + Al-CD cooler with Zr or Inox pipes. Mock-up possibly available within few weeks.  Ceramic tiles on metal support – Being studied  Ongoing research of suitable ceramic materials following preliminary spec. by RF experts (SiC is expected to be a good candidate)  Thin metal foil on low conducting support – To be studied  Preliminary RF studies show that no major difference exists between monolithic metal jaw and thin metal foil bonded on low conducting support. Possible advantages in terms of robustness RF studies have not yet clarified the choice between high/low electrical conductivity materials. Options for high or medium density materials (collimation efficiency) still open. Possible design options:

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Collimation jaw Metallic support Ceramic tiles Ceramic absorber with metallic (conductor) support…

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Jaw Cooler and pipes Increased energy deposition (high / medium density jaw materials) requires much higher cooling capacity with respect to Phase I (factor ~5) Design alternatives:  Machined circuit with brazed covers (Glidcop or Cu-Diamond) – studied.  High cooling capacity, relatively easy production. Remark  Not in line with UHV recommendations → …(Remark: Plansee developed and qualified a very similar solution for ITER project in a similar environment)  Continuous bent pipes back-casted in metal diamond – being studied  Plansee available for co-development using Ta or Nb pipes in Cu-CD (investment required?)  EPFL also working on this option using Zr or Inox pipes in Al-CD  Machined circuit sealed during casting – To be studied  Continuous bent pipes brazed to jaw cooler – Derived from Phase I solution

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/ Jaw Cooler and pipes Cooling pipes back- casted in metal support Cooling circuit machined in metal support with brazed covers

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/ BPM integration Integration of BPMs into the jaw assembly gives a clear advantage for set-up time BPM pick-ups BPM cables and electrical connections

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/ RF contacts RF stability provided by ferrite blocks and metallic rails (no sliding contacts) Ferrite blocks placed all along the jaw Ferrite blocks ensure beam stability without sliding contact Metallic rail

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Fine adjustable system: preliminary thermo-mechanical analysis for 8e10 p/s scenario confirm the validity of the design principle (back stiffener + collimation jaw). Max deflection:106  m Temperature is underestimated due to unrealistic boundary conditions!!! Max ΔT : ~30  C Thermo-mechanical analysis Mo back-stiffener Cu cooling system Cu jaw Max deflection:80  m

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 Future Outlook 1. Back stiffener / central adjustment principle seems so far a viable solution  We continue on this path 2. RF studies have not yet allowed the choice between high/low electrical conductivity materials  keep all material options open (metal, ceramic, thin foil). 3. Effects of material density on global collimation efficiency not yet clarified  options for high (Cu) or medium (3÷5 kg/dm 3 ) density materials still open. 4. Cooling system: we prefer the machined solution (more efficient and feasible); back-casted option should be kept only if a clear veto on machined solution is emitted. Keeping options 2, 3 and 4 open has a cost in terms of required design manpower. 5. BPM pick-ups embedded in jaw assembly seem attainable; BLM to be evaluated only if compact enough to be hosted in collimator jaw  reduction in jaw effective length 6. Jaw robustness for the moment relies on +/-10 mm external tank translation. 7. Increase reliability of actuation system by new moving table design. 8. Continue/strengthen collaboration with EPFL and Plansee. Our view on future activities …

A. Bertarelli – A. DallocchioLHC Collimation Phase II – Design Meeting – 19/09/2008 In order to meet the challenging objectives and deadlines of this project the following points should be rapidly addressed:  Tracking studies followed by Fluka analyses for all possible scenarios (nominal and accident), designs and jaw materials:  Cu/CD + Cu coating  Al/CD + Al coating  Ceramic tiles (+ Thin foil)  Decision on cooling circuit solution (involving AT-VAC and SC-RP)  Gear up in RF studies to rank different options (unfortunately E. Métral team has lost a ad-hoc PhD candidate).  Validate BPMs baseline to go ahead with Jaw design. Evaluate BPM possibilities  Consolidate contacts with interested institutes (Kurchatov, BNL) for irradiation studies on advanced materials. Future Outlook To-do list … Most urgent