ELENA KICKERS AND SEPTA ELENA Meeting, 28.09.2011 Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT.

Slides:



Advertisements
Similar presentations
Multi-Turn Extraction / L.Ducimetière / Kicker options for MTE Prepared by L.Ducimetière, L.Sermeus Outline: Reminder : Present MTE dedicated.
Advertisements

Design and Technical Challenges of the ILC Small Angle Interaction Regions October 20 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits and.
G2P Target installation and Beyond. Schedule Pivot before.
PSB extraction and transfer kickers 01/10/2014 LIU-PS ABT review1 L. Ducimetière, L. Sermeus.
1/10/2014 LIU-PS ABT review1 T. Kramer, L. Ducimetiere, L. Sermeus.
MSI-V J. Borburgh, B. Balhan, E. Carlier, J.M. Cravero, B. Goddard, D. Nisbet, P. Van Trappen, F. Velotti.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
Eric Prebys USPAS, Knoxville, TN, Jan , 2014.
Design and operation of existing ZS B.Balhan, J.Borburgh, B.Pinget B.BalhanDesign and operation of existing ZS SPS ZS Electrostatic Septum Upgrade Review.
Design and Technical Challenges of the ILC Small Angle Interaction Regions October 19 th, 2006J. Borburgh, CERN, AB/BT Electrostatic separator limits With.
CERN ISOLDE / HIE ISOLDE 1 Isolde Target Modulator Prototype development prepared by T. Gharsa TE-ABT-EC CERN.
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
FAIR PROJECT COST BOOK. FAIR cost 1.2 mld euro 1. Civil construction and infrastructure 322Meuro 2. Accelerator systems 592 Meuro 3. Experimental facilities.
J. Borburgh, B. Balhan, E. Carlier, S. Damjanovic, L. Ducimetiere, T. Masson, V. Mertens, A. Prost, L. Sermeus.
Jürgen Florenkowski GSI, Darmstadt Agenda Annual Report Meeting EU construction ( CNI ) contract "DIRAC-PHASE-1" for the FAIR project September 26, 2006.
New injection region 1L1 Engineering Change Request PSB-L-EC-0001 EDMS Wim Weterings PLI Meeting Wednesday 14 th January 2015.
Kicker generator and controls installation in ECA5? Etienne CARLIER
14th ICFA Mini-Workshop on Septa Devices in Accelerators
Spares for Critical Items Kickers W. Weterings SPS Consolidation Review Laurent Ducimetiere, Patrick Faure, Luis Miguel Coralejo Feliciano, Remy Noulibos,
Introduction Straw Working group meeting CERN group 1 NA62 Collaboration meeting, Brussels 7-10/9/2010.
How to keep the Injectors running for another 25 years S Baird (on behalf of EN/MEF/ABA) LHC Performance workshop Chamonix January 2010.
BI.DIS10: Magnets & generators R. Rosol, L. Sermeus, T. Stadlbauer, TE-ABT LIU review, 20 November
Sketching Basic Kicker System Parameters W. Bartmann, T. Fowler, B. Goddard, T. Kramer.
Design of DC septum magnets based on measurements and 3D calculation of an R&D septum magnet for Rapid Cycle Synchrotron of J-PARC Masao Watanabe, Accelerator.
R. Rosol, LIU-PSB review, 10 September BI.DIS Pulse generators R. Rosol, LIU-PSB review, 10 September Luc SERMEUS, Rodolphe ROSOL Laurent.
12 GHz Stand alone power source at CERN G.McMonagle AB/RF.
ABT LIU Project Review 2015 BI.KSW: Magnet November 20 th 2015 L. Feliciano TE/ABT.
ESS | A Preliminary Feasibility Assessment of Power Converters and Magnets for Beam Raster System| | Carlos A. Martins, ESS Preliminary Feasibility.
12th February 2010David Mcfarlane EN-MEF-ABA1. History of Booster The accelerator was built in The Proton Synchrotron Booster is the first, in the.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
ELENA Hardware Baseline Current Document Status T. Birtwistle EN-MEF-DC.
IEFC 2010 Workshop How to keep the PS operational for the next 25 years. 12-February-2010 R.Brown EN/MEF/ABA.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
New plans for high power RF tests places at CERN O. Brunner BE/RF/KS – January ‘10.
SEPTA and spares follow-up J. Borburgh for SEpta section.
Outline Injection septum SMH42 Injection bumper Resources Conclusion LIU-ABT review 20/11/2015 Status PS injection septa2.
Comparing current waveforms and shielding options for SMH42 Zsolt Szoke LIU-PS Meeting, 16/12/2014.
Antiproton Decelerator (AD) Consolidation ADUC 13/1/2015T. Eriksson CERN BE/OP1.
Technology Department CERN-GREECE INDUSTRY DAY Monday, 31 March 2014 TECHNOLOGY DEPARTENT 2 In the frame of the Accelerators & Technology Sector at CERN,
TE-ABT Naming Issues R. Noulibos EDMS Doc. 13/01/ Part I: Current Situation a) Overview of TE-ABT Systems & equipment b) Naming conventions used.
ABT review on the LIU-PSB Systems PSB KSW Magnets September 10 th 2014 L. Feliciano TE/ABT.
TPSG4 validation at HighRadMat #6 Cedric Baud, B. Balhan, Jan Borburgh, Brennan Goddard, Wim Weterings.
Technology Department MKP status L. Sermeus, L. Ducimetière TCM 18 November 2014.
MTE: Statistics of kickers faults Etienne Carlier, Luis Feliciano, Laurent Ducimetière, Brennan Goddard, Luc Sermeus 1 19 October 2015 MTE internal review.
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
L. Sermeus TE-ABT-FPSELENA IIC meeting 3 th April Review of ELENA Injection kicker Luc Sermeus on behalf of WP 2.8 (with informations from EN-MME)
Udo Blell - Synchrotrons 1 Udo Blell GSI, Darmstadt MAC – 7 April 2 th - 3 th, 2012 FZ - Jülich SIS 100 Injection / Extraction systems.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
Two half-day seminars on the remaining work packages to complete the MEDICIS Facility POWER CONVERTERS FOR MEDICIS Davide Aguglia & Julien Parra-Lopez.
Cost and schedule for ELENA Beam Transfer Systems W. Bartmann, J. Borburgh, E. Carlier, L. Ducimetiere, T. Fowler, M. Hourican, R. Ostojic, L. Sermeus.
PSB extraction and transfer kickers LIU TE-ABT review, 20 November L. Sermeus.
ELENA installation progress F. Butin / ELENA collaboration.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Vacuum System P. Chiggiato TE-VSC
CT Hardware Overview and Issues
LINAC4 ADVISORY COMMITTEE
Jorge Sánchez-Quesada BE-RF-FB
ELENA installation and commissioning status
LAPP BPM Read-out Electronics
LIU – EVM status and next steps
AD consolidation activities in LS2
ELENA Beam Transfer Workpackage
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
TCM PS – SPS Thyratron Power Trigger Consolidation
Puls-Plasmatechnik GmbH
EYETS septa status Septa activities TE/ABT Thierry Masson
EYETS septa status Septa activities TE/ABT Thierry Masson
OIL DISTRIBUTION TRANSFORMERS OIL DISTRIBUTION TRANSFORMERS Presented By 1 Dr. Eng. Adel Abdel-Twab Farag.
Patrick ALEXANDRE, 27, from France.
Presentation transcript:

ELENA KICKERS AND SEPTA ELENA Meeting, Prepared by J. Borburgh, E. Carlier, A. Fowler, L. Sermeus TE/ABT

Contents Introduction: TE/ABT equipment Septa Kickers ELENA Meeting L. Sermeus 1

TE/ABT equipment TE/ABT equipment ELENA Meeting L. Sermeus 2 ELENA (new) 2 septa 2 (+1 foreseen) kickers AD (existing) 8 kicker systems 2 septa ELENA Ring

Septa ELENA Meeting L. Sermeus 3 What’s already available? SM12 # magnets2 # spare coils0 Gap width134mm Gap height74mm Septum thickness 22.8mm L physical 400mm L eq 300mm B0B0 679mT ∫B.dl max 204mT.m I max (DC)2000A

Septa ELENA Meeting L. Sermeus 4 What’s needed? Mechanical support Water cooling manifold gauges, flow meters, filters and valves Magnet protection interlock system What’s needed, but not included? Vacuum chambers (TE/VSC?) Power supplies (TE/EPC?)

Septa ELENA Meeting L. Sermeus 5 Resource requirements and what can collaborations contribute to? Magnetic septaTotal resource needs Mechanics, hydraulics45kCHF Interlock system, PLC’s30kCHF Total for both magnetic septa75kCHF Manpower estimate CERN ABT staff Collaboration contribution Total resource estimate Scientific staff0.1 m.y Technicians m.y Controls technician m.y Mechanics00.3 m.y Total manpower m.y

Kickers ELENA Meeting L. Sermeus 6 Features: ELENA and AD kicker system layout SF 6 Gas filled Pulse Forming Line PFL voltage up to 80 kV Thyratron switches use of oil for cooling and insulation 10 systems: 2 for ELENA and 8 for AD (+space for 2 new spares for future needs like second Elena extraction line)

Kicker generators relocation ELENA Meeting L. Sermeus 7 Option 1 least preferred (space needed for future experiences) Option 2 most preferred but technically difficult and exposed to radiations Option 3 second most preferred to be studied Present kicker platform (10 generators) Option 4 least preferred (above racks)

Kicker magnets and tanks 3D models of magnets to be made with Catia software. Two new magnet frames made of stainless steel to be manufactured for 300 °C bake- out.(ex AC magnets only) Magnets to be dismounted and reassembled with new frame. (ex AC magnets only) Two (identical ?) 300 °C bake-able vacuum tanks and ancillaries to be designed, manufactured, equipped and tested. ELENA Meeting L. Sermeus 8 Basic assumption: use of existing unused AC ejection or AA injection magnet modules (to be confirmed by P. Belochitskii) AC magnet AA magnet

Kicker magnets and tanks ELENA Meeting L. Sermeus 9 Resource requirements and what can collaborations contribute to? ELENA kickers (*)Total resource estimate Magnet modifications40kCHF Vacuum tanks and ancillaries276kCHF HV and LV cables24kCHF Thyratrons80kCHF HV generator upgrade100kCHF Fluids50kCHF Total for 2 kickers570kCHF Manpower estimate (*) CERN ABT staff Collaboration contribution Total resource estimate Scientific staff0.5 m.y Technical assistant0.5 m.y Technician11m.y (Electro)Mechanic0.5 m.y Draughtsman0.5 m.y Total manpower m.y (*) without controls

Kicker platform displacement ELENA Meeting L. Sermeus 10 Resource requirements and what can collaborations contribute to? (the cost and manpower for a new building are not included) Total resource estimate (*) Material and general services306kCHF Manpower estimate (*) CERN ABT staff Collaboration contribution Total resource estimate Scientific staff0.1 m.y Technical assistant0.1 m.y Mechanics technician0.1 m.y (Electro)Mechanic m.y Electronics technician0.2 m.y FSU(0.3)0.3 m.y Total manpower m.y (*) without controls

Kicker controls ELENA Meeting L. Sermeus 11 Resource requirements and what can collaborations contribute to? ELENA kickersTotal resource estimate Injection/Extraction200kCHF Fluid systems40kCHF Common controls60kCHF Total for 2 kickers300kCHF Manpower estimateCERN ABT staff Collaboration staffTotal resource estimate Electronics engineer0.5 m.y Electronics technician m.y Total manpower325m.y AD kickers displacement/rejuvenationTotal resource estimate Power distribution150kCHF Re-cabling100kCHF PXI control100kCHF Common controls180kCHF Total for 8 kickers530kCHF

ELENA Meeting L. Sermeus 12Conclusion TE/ABT related work and resource needs have been presented. Critical points are still to be clarified:  final choice of extraction kicker magnet  new location of the kicker platform Reference: CERN-BE OP, November 2010