DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT.

Slides:



Advertisements
Similar presentations
Eija TuominenHIP Detector Laboratory October Helsinki Institute of Physics DETECTOR LABORATORY National infrastructure to support Finnish research.
Advertisements

The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
LHC Experiments at Liverpool E2V Visit – Nov 2005 Introduction Si Technology Upgrade/Maintenance Summary.
WP6: Quality Assurance and Reliability Testing A. Honma, CERN PH/DT 30 April 2010DT Steering Board Meeting, A. Honma1  Mandate  Manpower and Resources.
Consolidation and Upgrade of the LHC Experimental Vacuum Sectors
ECFA Preparatory Group "Shutdown constraints and radiation and activation effects”. W. Zeuner, W. Riegler, R. Lindner, B. Di Girolamo, G. Corti, C. Schaeffer,
Charles University in Prague Institute of Particle and Nuclear Physics Brief presentation Zdenek Dolezal.
Horst Breuker AIDA March, WP6 TA to Testbeams and Irradiation at CERN AIDA units : 600 in Testbeams; 200 in Irradiation Facility; 1 unit = 1 day;
FP420 Vacuum Ray Veness. Contents o What is FP420? o How would it be installed in the LHC? o What would it look like? o What are the issues/interest for.
ATLAS Tracker Group PPD Staff Talk 28/Nov/ ATLAS SCT Builders Inc Annual Report Mike Tyndel (Group leader & SCT Project Leader) –Richard Apsimon.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
Irradiation Facilities at CERN for RD-51 Micro-Pattern Gas Detectors (RD-51) Workshop Nikhef, Amsterdam, April Mar CAPEANS CERN.
André Augustinus 16 September 2002 Safety issues.
Experimental Beampipes: Status and Outlook Ray Veness / AT-VAC For the beampipe team With many thanks to the experiment’s installation and coordination.
DT News CJ ‘Risk Management‘Mark Hatch DT Science-Techno Tea 12 September 2011.
The Joint COntrols Project Framework Manuel Gonzalez Berges on behalf of the JCOP FW Team.
The Quality Assurance and Reliability Testing (QART) Lab at CERN A. Honma, CERN PH/DT 26 April 2010CMS Upgrade Meeting, A. Honma1  Purpose of Lab  Lab.
Status and possibilities for the irradiation facility in the PS East Hall Michael Moll, Maurice Glaser 10 March 2010 – IRRAD Working Group - some notes.
Status of DT website and prospects for improving SFTs Nefeli Kousi (Supervisor: Danilo Piparo) PH-SFT.
Joint Meeting ATLAS-CERN Detector Group / PH-Detector Technology Group Overview of the PH-DT group: Group Structure Current Projects Services White Paper.
CERN workshop upgrade Aida WP 9.2 Rui De Oliveira.
Building 16, 17, 153, 162, 173 (256) Safety - Renovation CH DENARIE CERN PH/DT MARCH 2011.
Space, labs & testing equipment Paolo Petagna Meeting on CO 2 Cooling CERN 04 February 2015.
CERN HR Department Strategy, Management and Development DT2 News Summer Students Presentations: Henrik Friis Dam 'Characterization of Scintillating Fibres.
CMS Experiment at the LHC, CERN Date Recorded: :21 CET Run/Event: / Candidate Collision Event Report from Belgium Michael Tytgat.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
Gas System production for LHC detectors Stefan Haider EP / TA1 - Gas.
JRA2-brainstorming 4/1/2006, Lucie Linssen, slide 1 introduction to CERN in EUDET The CERN PH (physics) department participates in EUDET PH department:
Overview of DT group activities in LHCb LHCb CERN team retreat, Les Houches Burkhard Schmidt, PH-DT January 13, 2016.
Dec7,2007 ie-FP7 Test Beams for detector R&D at CERN The PS East Area The SPS North Area Irradiation facilities.
Common R&D projects for the LHC upgrade and plans for irradiation facilities Outline: PH common R&D projects Working Group on future irradiation facilities.
Agenda Introduction et présentations Personnel + Superviseurs Organisation et Activités dans la section Piquets services / Working Hours AOB –Holiday planning.
DT News CJ DT Annual Report 2010 CJ Measurement of the LHC Luminosity André Braem, Matthieu Heller with Scintillating Fibre Detectors in Roman Pots DT.
Upgrade week Apr10 AB CMS assembly & lab areas: future External constraints : entire 3000m 2 CMS area in ISR destined for rad material treatment entire.
Assembly scenario of ILD Si trackers 2015/4/21 Yasuhiro 1.
BASIC SKETCH OF ACTIVITIES FOR THE CERN LHCB-RICH TEAM (2012 – 2017) Team composition Present activities and consolidation plans RICH – CERN R&D and Upgrade.
Preamble Run 2 and Run 3 will see the continued exploitation of the forward physics potential of the LHC in the long straight sections (LSS) either side.
SURVEY EXISTING TECHNIQUES AND REQUIREMENTS Jean-Christophe GAYDE, Pascal SAINVITU (CERN EN-MEF-SU-EM) Infrastructure For LHCb Upgrade Workshop February.
PH Theme 3 R&D Meeting with WP leaders 3/7/2008. Overview of WP’s.
Brief Status of LHC Experimental Vacuum Project Ray Veness CERN TE/VSC.
Geoff HallLECC LHC detector upgrades Introductory comments on electronic issues Organisation of this short session.
First discussion on MSS for Katrin March 26, 2013 M.Capeans CERN PH-DT.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Eija Tuominen, coordinatorHIP/UH Detector Laboratory, October 2010 DETECTOR DEVELOPMENT at HELSINKI DETECTOR LABORATORY Detector Laboratory is a joint.
Thursday December 11th, 15:00 Hrs, room 155-R-047 Agenda General news and DT (Andrea, Antti) Euclid-Catia.
1 LHCb needs to space for upgrade activities and maintenance of the existing detector: detector R&D, detector module production, detector assembly, storage.
Thursday November 19 th, 15:00 Hrs, room 155-R-047 Agenda An introduction to the Project Office.
1. 2 PX ‘material’ shaft LHCb workshop Visitor area Control room SG8 Gas building Meeting room and offices Storage Access to UX.
New PH-DT website Nefeli Kousi PH-SFT/PH-DT Supervisor: Danilo Piparo PH-SFT.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
Upgrade of the irradiation facilities in the PS East Hall Maurice Glaser, Michael Moll 30 April 2010 – PH-DT steering board meeting activities are part.
Overview on CERN Test Beam Facilities On behalf of the CERN SPS/PS test beam coordinator: Horst Breuker, CERN Courtesy: Matteo Alfonsi, CERN Horst Breuker,
Technology and R&D Summary and next steps Burkhard Schmidt.
The EP Department Manfred Krammer.
The Laboratori Nazionali di Frascati of the Istituto Nazionale di Fisica Nucleare 1.
PH-DT Seasonal meeting 7/5/13
Detector Technology Group (PH/DT)
RD51 test facilities E. Oliveri (CERN) on behalf of RD51.
PH-DT Seasonal Group Meeting 21/1/14
CERN PH-DT Physics Department (PH) Detector Technologies (DT)
The LHCb Installation Story
Outlook by the Physics Coordinator
June 22, 2017 Burkhard Schmidt for the DT coordination team
CERN R&D plans and Infrastructures
Merging DT1 + DT2 FH /
Consolidation and Upgrade of the LHC Experimental Vacuum Systems
BOND/QART Lab and Pixel R&D
LHCb & EYETS
The Laboratori Nazionali di Frascati of the
Presentation transcript:

DT Technical Space Overview December 2012 M.Capeans, A.Catinaccio PH-DT

DT Technical Space Gas Cooling Magnet Controls B-Field measurements Irradiation Facilities Thin Film Lab Dep. Silicon Facility Bond and QART Lab (Workshops, Clean rooms, Assembly areas, …) Gas Cooling Magnet Controls B-Field measurements Irradiation Facilities Thin Film Lab Dep. Silicon Facility Bond and QART Lab (Workshops, Clean rooms, Assembly areas, …) Mostly underground areas Scintillators, photo- detectors, MPGD, Optical, Gluing…

DT Workshops ActivityUseBuildingSurface [m2] DT Services DT Thin Film Lab375 Magnet Controls2060 Gas Systems DT Main workshops DT and ATLAS main mechanical WS108 / / 30 DT central mechanical WS25 / / 190 Used by experiments ALICE and CMS Pre-shower162 / / 25 LHCb (VELO + MWPC)21120 ? TOTAL~2200 The activity in DT workshops peaks during LHC technical stops and shutdown periods No changes foreseen

DT Assembly Halls/Space ActivityCurrent UseBuildingSurface [m 2 ]Future Use Experiments ATLAS Pixel15380 Precise assembly work for small detectors AEGIS ATLAS175670No change NA62 Straw tracker Development of gas detectors for upgrade projects (e.g. MPGD) DT projects Storage & Gluing Lab15380 / 80No change Scintillators15550No change Diverse (PH-EDU, …) Development of support structures and services for Tracker Upgrades DT Services Magnetic measurements Cooling Project Magnetic Measurements Magnet Controls No change Silicon and Bond Labs186 (28)800 Space shared by LHC groups working on Silicon detector upgrade projects TOTAL~ 3500

DT Laboratory Space ActivityUseBuildingsSurface [m 2 ] Experiments LHCb (Velo +MWPC)20 / Small lab spaces (ATLAS ALFA/TOTEM)25180 ATLAS304 / CMS (E-cal, Preshower)21 / CAST16230 ALICE TPC…, LHCb (HPD, RICH) and DT 16 / 17 / 162 / 153 / 256 / DT ProjectsDT Diverse small Labs25 / PH-EDU (media lab)17100 DT Services Gas Project256 / Thin Film Lab3260 PS Irradiation Facility1490 Magnet measurements and controls2160 Silicon Lab2860 Bond and QART Lab Total~ 2300 No changes foresee n

DT Storage UseBuildingSurface [m 2 ] Storage small radioactive material13 / 2813 / 10 Storage Departmental Silicon Facility18655 DT Storage3 / 51 (underground)210 / 65 Storage DELPHI, RICH, CLOUD… and DT153/162/ Storage of large experimental magnets Storage TOTAL~ 1700 No changes foreseen

Conclusions The technical space allocated to DT occupy a total area of about m 2 of laboratories, assembly halls, workshops and storage places dispersed in more than 20 different buildings The group is engaged in a dozen of detector projects, operates 10 services open to all CERN users and is involved in R&D projects on new technologies and infrastructures Future engagements (LHC detector upgrades, LCD, etc) are now being considered and the space required in future years will remain at the current level The current disperse location and installations of the DT group makes it difficult to create a coherent team, duplicates efforts and equipment; there is large potential in creating a well defined “home base” for the DT activities in the future, combining it with renewing ageing and obsolete technical installations