M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona 12-15 May 2003 1 RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M.

Slides:



Advertisements
Similar presentations
Significance Testing.  A statistical method that uses sample data to evaluate a hypothesis about a population  1. State a hypothesis  2. Use the hypothesis.
Advertisements

Modeling of Reconnection of Decentralized Power Energy Sources Using EMTP ATP Ing. Dušan MEDVEĎ, PhD. Železná Ruda-Špičák, 25. May 2010 TECHNICAL UNIVERSITY.
Presentation on ELECTRICITY DISTRIBUTION LOSSES & CONCEPT OF AGGREGATE TECHNICAL AND COMMERCIAL (AT&C) LOSS R.V. Shahi Former Power Secretary, Govt.
WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s: Power Engineering 1 WATERLOO ELECTRICAL AND COMPUTER ENGINEERING 60s Power Engineering Department of.
SPICE modelling of PFC controller
Software Quality Ranking: Bringing Order to Software Modules in Testing Fei Xing Michael R. Lyu Ping Guo.
20 10 School of Electrical Engineering &Telecommunications UNSW UNSW 10 Author: Simon Lewis Supervisor: Iain MacGill Industry Supervisor:
Multiobjective VLSI Cell Placement Using Distributed Simulated Evolution Algorithm Sadiq M. Sait, Mustafa I. Ali, Ali Zaidi.
During a mains supply interruption the entire protected network is dependent on the integrity of the UPS battery as a secondary source of energy. A potential.
On the Application of Artificial Intelligence Techniques to the Quality Improvement of Industrial Processes P. Georgilakis N. Hatziargyriou Schneider ElectricNational.
Frankfurt (Germany), 6-9 June 2011 Why operator training simulators (OTS) ?  train operational procedures to new staff  experience unusual/disturbance.
5/21/2015 Using Simulation Tools to Predict and Prevent Vacuum Circuit Breaker Switching Induced Transformer Failures Steven B. Swindler,
Evaluating Performance for Data Mining Techniques
P 505 Statistical Determination of Insulator Performance at Koeberg Insulator Pollution Test Station Presented by Dr WL Vosloo (Eskom) Dr I Gutman (STRI)
F. Ferrandis_SP_ALPHA 2_BLOCK 2_Paper 35_Presentation Barcelona May POWER FACTOR CORRECTION WITHIN INDUSTRIAL SITES EXPERIENCES REGARDING.
A N OPTIMAL RELIABILITY ALLOCATION METHOD FOR DIGITAL SUBSTATION SYSTEMS Y UZHOU H U, P EICHAO Z HANG, Y ONGCHUN S U, Y U Z OU Adviser: Frank, Yeong-Sung.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
ON DIMENSIONING LVDC NETWORK CAPACITANCIES AND IMPACT ON POWER LOSSES
MONFILS Pierre-André (BE) Session 5 - Block 1 - Question 5.14 Barcelona May 2003 One phase rural distribution installation with direct connection.
Frankfurt (Germany), 6-9 June 2011 M.Sc. Terje Pynten, Dr. Jan Andor Foosnæs, M.Sc. Johan G Hernes, M.Sc. Erling Tønne NTE Nett AS Paper 0696 Finding maintenance.
Probabilistic Mechanism Analysis. Outline Uncertainty in mechanisms Why consider uncertainty Basics of uncertainty Probabilistic mechanism analysis Examples.
J A K Douglas UK Session ALPHA2 – Block 4 Barcelona May SETTING OF TARGETS FOR CONTINUITY OF SUPPLY THROUGH BENCHMARKING DOUGLAS J.A.K. and.
Frankfurt (Germany), 6-9 June 2011 W. Niederhuemer – Austria – RIF Session 4 – Paper PROBABILISTIC PLANNING FOR A HIGHER INTEGRATION OF WIND TURBINES.
Agustoni IT Session 2 – Block 3 Barcelona May 2003 Proposal for a High Quality dc Network with Distributed Generation A. Agustoni, M. Brenna, E.
Barcelona, May 13, 2003 ASSET MANAGEMENT Development of new approaches Gerd Balzer Darmstadt University of Technology TU Darmstadt Institute of Electrical.
TUD_Gulski_A1_The Netherlands_author_ALPHA6_Block 3 Barcelona May DATAMINING FOR DECISION SUPPORT OF CBM OF POWER CABLES E. GULSKI (1), F.J.
SINTEF Energy Research 1 Fault statistics in distribution network Regulation of quality of supply Gerd Kjølle, Norway, RT3.
Incorporating Quality of Service into Incentive-based Regulation Juan Rivier Florence School of Regulation Workshop Improving.
Business Id © NetHawk All rights reserved. Confidential April 2005NetHawk NetHawk Quality of Service products Markus Ahokangas, MSc Product.
DISTRIBUTED GENERATION, RENEWABLE ENERGY AND SUSTAINABILITY. IMPACT ON POWER QUALITY AND NETWORK PLANNING “Inauguration of the 6th Framework Programme”
©2009 Mladen Kezunovic. Improving Relay Performance By Off-line and On-line Evaluation Mladen Kezunovic Jinfeng Ren, Chengzong Pang Texas A&M University,
Frankfurt (Germany), 6-9 June 2011 Louise Jakobsen, Danish Energy Association – Denmark – Session 3 – Paper 0811 Louise Jakobsen, Danish Energy Association.
SUBSTATIONS SESSION Chairman: Ernst GOCKENBACH Reporter: Mark WALDRON.
1 Barcelona May 2003 INFORMATICAL SYSTEM INTEGRATING THE RELIABILITY CENTERED MAINTENANCE THE SYSTEM IMPLEMENTATION.
International Telecommunication Union ITU-T Study Group 05 The model testing/simulations Yasuhiro Honma Technical Session on Home Networks Geneva, 29/04/2011.
Nelson Kagan BR Session 4 – Block 3 – Planning – Paper #66 Barcelona May Technical Assessment for the Installation of Dispersed Generation.
Frankfurt (Germany), 6-9 June 2011 Detailed Analysis of the Impact of Distributed Generation and Active Network Management on Network Protection Systems.
GENDER AND AGE RECOGNITION FOR VIDEO ANALYTICS SOLUTION PRESENTED BY: SUBHASH REDDY JOLAPURAM.
Alain Schenk, Switzerland, ALPHA 3, Block 3.1, Selected paper Barcelona May ASSESSMENT OF PROTECTION SCHEMES: A KEY FACTOR FOR RELIABILITY.
CONTENTS: 1.Abstract. 2.Objective. 3.Block diagram. 4.Methodology. 5.Advantages and Disadvantages. 6.Applications. 7.Conclusion.
S. GRENARD/ D. MELOVIC/ G. STRBAC UK Alpha 5 – Block 2.1 Barcelona May Effect of losses on design and regulation of distribution networks.
Name Of The College & Dept
A Training Presentation On 220 KV GSS CHOMU,JAIPUR
Frankfurt (Germany), 6-9 June 2011 Marcus R. Carvalho – Brazil – RIF Session 5 – Paper ID 0728 LONG TERM PLANNING BASED ON THE PREDICTION AND ANALYSIS.
Diagnostics of photovoltaic power plants operation Vitezslav Benda, CTU Prague, Faculty of Electrical Engineering.
Preventing Voltage Sags and Interruptions. # Equipment supplier awareness: # Customers level protection: # Utility level protection: - Sag magnitude and.
Frankfurt (Germany), 6-9 June 2011 Manuel Avendaño J. V. Milanović Manuel Avendaño – UK – Session 2 – Paper 0529 METHODOLOGY FOR FLEXIBLE, COST-EFFECTIVE.
DICORATO IT Session 4 – Block 1 – Question 3 Barcelona May Set parameters and implement the LM option Market access options Evaluate Economic.
Operation and Control Strategy of PV/WTG/EU Hybrid Electric Power System Using Neural Networks Faculty of Engineering, Elminia University, Elminia, Egypt.
Distribution systems basic techniques and radial networks.
ARM and GPS Based Transformer monitoring system with area Identification Student Name USN NO Guide Name H.O.D Name Name Of The College & Dept.
Alexandre Piantini University of São Paulo Lightning Transients in Medium- Voltage Power Distribution Lines V Russian Conference on.
البحث الثامن بحث منفرد منشور فى مؤتمر دولى متخصص ( منشور التحكيم علي البحث الكامل ) Adel A. Elbaset 14 th International Middle East Power Systems Conference.
Spark on Entropy : A Reliable & Efficient Scheduler for Low-latency Parallel Jobs in Heterogeneous Cloud Huankai Chen PhD Student at University of Kent.
SUSTAINABLE INVESTMENT STRATEGIES FOR AGING DISTRIBUTION NETWORKS Dr. Eric Jennes 24/7 Netze Mannheim Germany Frankfurt (Germany), 6-9 June 2011 Dr. Eric.
CRICOS No J a university for the world real R Aging Equipment Replacement in Power Systems, Using Reliability and Cost Considerations By Dr. Ghavam.
| presented by Vasileios Zois CS at USC 09/20/2013 Introducing Scalability into Smart Grid 1.
SUB-STATIONS.
SHORT CIRCUIT MONITORING BY USING PLC & SCADA
Economic Operation of Power Systems
Olli Kauppi Helsinki School of Economics & Hecer Matti Liski
Distribution Loss Factors for Cost To Serve study
Transmission Planning in a Modern Market Environment
Paper 2.59 COMPREHENSIVE DEVELOPMENT OF POWER QUALITY MANAGEMENT AND EVALUATION OF VOLTAGE DIP PROBLEMS A. Mäkinen, P. Järventausta, P. Verho, Tampere.
Carlos César Barioni de Oliveira Enerq/USP André Méffe Enerq/ USP
Paper 5.57 INFORMATION SYSTEM SOLUTION FOR RELIABILITY BASED ANALYSIS AND DEVELOPMENT OF DISTRIBUTION NETWORKS P. Verho, P. Järventausta, A. Mäkinen, K.
M. Kezunovic (P.I.) S. S. Luo D. Ristanovic Texas A&M University
Presentation transcript:

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May RISK CRITERIA TO APPLY AND MANAGE DISTRIBUTION TRANSFORMERS M. A. Hernandez; M. R. Gouvea ENERQ – University of São Paulo

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Solutions to minimize energy interruptions caused by failures in distribution transformers Reintroducing (from maintenance) distribution transformers in the system Evaluating the risk of failures of distribution transformers in operation Objectives

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Sources of Transformer Failures Failures due to problems arising from: –severe system requirements (grounding, lightning protection, etc.) –network installation procedures –project design –maintenance procedures

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Basic Methodology Evaluation of: Transformer Supportability (TS) System Requirements (SR) Compromise solution

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Transformer Supportability (TS) design characteristics operating characteristics The above characteristics lead to the evaluation of the TS indices

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May System Requirements (SR) Physical characteristics: location : –average expected rate of failures caused by trees, pollution, shielding from the buildings, grounding, etc. - supplied load with predictable behavior network design: –insulated cables to avoid short circuits –underground network, –etc.

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May SR indices obtained by direct measuring of: –loading, voltage levels and statistical records of transformer failures, etc. obtained by network simulations: –loading from typical customer daily curves –lightning performance

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Clustering network locations - classifying the network locations where transformers may be installed, according to their physical, design and operational characteristics, - grouping these locations according to similar characteristics - representing each group through an element whose features equal the average characteristics of the group

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Transformer Clustering - classify the transformers, according to their statistical indices: - supportability under specific requirement levels, - expected economic life (calculated with Arrenius equation) - expected supportability in overvoltage situations according to technical standards - group these transformers according to similar characteristics - represent each group through an element whose features equal the average characteristics of the group

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Two-dimensional Example TS SR Loading Over- voltage TS  SRf  C Minimise Associated Cost

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Optimization Model Propose a set of possible solutions for the allocation of transformers in the system; Represent TS and SR, for each possible solution, in a n-dimensional space; Determine the overall associated cost for each solution; The Risk of each solution is represented by the convolution between the SR and TS statistical distributions The optimum solution is the best compromise solution comprising cost and risk associated to the set of distances between SR and TS

M. R. Gouvea BR Session 1 – Block 1 – Transformers – Paper #36 Barcelona May Conclusions The suggested methodology is an efficient tool to manage distribution transformers, in that it: considers the technical characteristics of the transformers and the network locations in which they are applied; optimizes associated costs; avoids failures as it identifies risk areas; Improves the presently used transformer management methodology by introducing new control parameters.