HF I&C status Alexi Mestvirishvili, University of Iowa LS1 session, December CMS week1.

Slides:



Advertisements
Similar presentations
Endcap assembly update C Buttar UK-SCT-MB RAL 2 nd Sept 04.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Questionnaire Response
02-Mar-09A. Cardini / CERN & INFN1 Muon Detector Status (week 9: Feb 23 rd  Feb 27 th ) Present: Ale, Thomas, Nikolai, Oleg, Sasha, Maria Luisa, Perluigi,
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
HCAL-Fermilab7 Feb 2003Hazen / Machado HF Electronics PMT Readout Update E. Hazen, J. Rohlf, E. Machado Boston University.
Atlas SemiConductor Tracker Andrée Robichaud-Véronneau.
Detector Systems Update MICO March 3, MICE Detector Systems  CKOV u CKOV humidity (HIH4000) and temperature (LM35) sensors in hand for installation.
Anthony AffolderUS CMS Meeting 12/3/02DAQ Based Systems LV/HV Needs DAQ Power Supply Needs HV à 600 V/~1mA range –0.1-1  A Current Sensing –Over Voltage/Current.
HF UPGRADE PROJECT Y. Onel PM June 11, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
HF UPGRADE PROJECT Y. Onel PM June 11, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
7/11/01Steven Hays E/E Support Page 1 NuMI Beam line Power Supplies  The supplies in the line is detailed  Main Ring Style…………………..…1  PEI/Transrex.
John Coughlan CMS Week Mar FED Update FED Production Status Transition Card.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester July 8, 2013.
Saverio Minutoli INFN Genova 1 1 T1 Electronic status Electronics Cards involved: Anode Front End Card Cathode Front End Card Read-Out Control card VFAT.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
CMX Production Status Presented to the L1Calo Meeting on Monday 22-Sept-2014 by Dan Edmunds for the CMX Group.
GEM chambers for SoLID Nilanga Liyanage University of Virginia.
HF UPGRADE PROJECT Y. Onel PM Report May 14,
HF UPGRADE PROJECT Y. Onel PM Report March 19,
U. Of Rochester DOE Review, July 15-16, 2002: P. de Barbaro, CMS1 CMS Project at UR Pawel de Barbaro University of Rochester DoE Review July 15-16, 2002.
PMG, Aug 03, 2000 Slide 1 Schedule In preparation Done Started Done Started Half done.
Straw Working Group Status assembly at CERN Plans 10/2/14Straw WG.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
Run 12: STAR Status and Schedule Update RHIC Coordination Meeting October 18, 2011 Bill Christie BNL Outline Status update Schedule update and issues Summary.
LHCb upgrade cooling Paolo Petagna Meeting on CO 2 Cooling CERN 11 March 2015.
1 ME1/1 ODMB Production Readiness Review: Schedule and Budget Darien Wood Northeastern University For the ME1/1 Electronics Project.
ROBOX with Multi Anode PMT’s Status and plans A.Mestvirishvili, I. Schmidt, S. Sen, F. Ozok University of Iowa.
HF 2008 : Status and Plans CMS Week, February 2008 Aldo Penzo HCAL Commissioning Status (INFN-Trieste, Italy) (23 February 2008)
Tevatron BPM Upgrade Stephen Wolbers CD Accelerator Coordination Meeting August 3, 2004.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
HF UPGRADE PROJECT Y. Onel PM Sept 17, Recent Highlights and News-I The PMT deliveries are now completed. The PMT and Base Boards System tests.
HF UPGRADE PROJECT Y. Onel PM Report April 30,
HF UPGRADE PROJECT Y. Onel PM July 9, OLD PMT vs NEW PMT 2 Old PMTs exhibit systematic gain loss vs Integrated Luminosity, rate of loss slowing.
HF UPGRADE PROJECT Y. Onel PM Report April 2,
1 HBD: Update and Schedule Itzhak Tserruya DC Meeting, BNL, April 13, 2005 Outline:  Full scale prototype status  Light source test  Construction Schedule.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
March 12 th 2013 Muon LS1 operation meeting1 Muon LS1 Status Outline Recap of last week P1 weekly schedule Muon related activities Open issues and discussions.
HF UPGRADE PROJECT Y. Onel PM October 1 st
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
TOF status and LS1 plansTOF status and LS1 plans 27/06/2012.
Beampipe Installation Status Ray Veness For the Beampipe team in AT/VAC and TS-MME.
T2 Status Report IP5 Installation Future plans. IP5 installation The mechanical structure has shown problems on installation and should be changed slightly.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Sourcing (in LS1) CMS week December 11 th, 2012 Ianos Schmidt The University of Iowa.
HF UPGRADE PROJECT Y. Onel PM Sept 3, Recent Highlights and News-I The PMT deliveries are now completed. Testing is going well. We had a meeting.
LHCb CO 2 cooling meeting Burkhard Schmidt – May 20,
HF UPGRADE PROJECT Y. Onel PM November 26,
Aug 4, 2005 Hcal sx5 status/issues. overview CCM temperature readout DAQs for sx5hcal HCAL installation status SATOCRICH.
ELENA installation progress F. Butin / ELENA collaboration.
HCAL Fall meeting, Nov 11-13,`04 HCAL digital optic link and trigger mapping Ianos Schmidt The university of Iowa.
HF Test station at P5 A.Mestvirishvili.
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
ROBOX modification plans
Group CERN Taylan Yetkin Post-Doctoral Research Scholar.
10/month is the present production rate 2 FTE + sporadic contributions
Summary of Fuse Testing for Barrel Module Fuse Boxes
HF Test station at P5 A.Mestvirishvili.
US Rod Burn-in Readiness DAQ Hardware/Power Supplies
Pierluigi Paolucci & Giovanni Polese
19-April-05 Peripheral Crate Testing, Installation, and Commissioning PC I&C Feb ’06 EMU Fred Borcherding 16-May-19 PC I&C Feb'06.
BLM planning 03/02/2014.
CSC Electronics Installation and Commissioning Oct ‘06
CSC Electronics Installation and Commissioning CSCE I&C
Racks PC Rack >> 24 mini and 12 tall PC racks Mini Racks
Presentation transcript:

HF I&C status Alexi Mestvirishvili, University of Iowa LS1 session, December CMS week1

People  Onur Fikri Oztirpan- Istanbul Technical University  Yusuf Oguzhan Gunaydin-Istanbul Technical University  Gural Aydin-Istanbul Technical University  Umut Kayhan Sen- Cukurova University  Cansu Uguruyar-Cukurova University  Mithat Kaya- Bogazıcı University  Ozlem Kaya- Bogazıcı University  Kerem Cankocak-Istanbul Technical University  Sevgi Tekten- Bogazıcı University  Ece Asilar- Middle East Technical University  Yavuz Oz- Bogazıcı University  Cemali Kilinc- Middle East Technical University  Huseyin Bahtiyar-Mimar Sinan Fine Arts University  Mete Yücel-Istanbul Technical University  Esra Barlas-Istanbul Technical University  Ferhat Özok-Iowa University  Elif Asli Albayrak-Iowa University  Marcos Correa Martins Junior CBPF - CENTRO BRASILEIRO DE PESQUISAS FÍSICAS  Thiago dos Reis Martins CBPF - CENTRO BRASILEIRO DE PESQUISAS FÍSICAS LS1 session, December CMS week2 Most of the people from Turkey universities already left. Hope all or some of them will be here next year as well. Underlined who are here. Marcos Correa Martins will stay at CERN until beginning of Februrary

What we have at CERN  We got all 1760 PMT’s after they were measured and sorted at Iowa.  BB’s 134 out of 216 (needed) at 904 lab. All are populated with PMT’s  79 BB’s housing 632 PMT’s tested so far in a two dark boxes. Test’s are going on  12 BB+PMT assembly is tested in a week LS1 session, December CMS week3  Independent DAQ – CMSHCAL11, Crate with one DCC and two HTR’s  FE – 12 HF style QIE’s, CCM, Cbox – enough to connect 3 ROBOX’es – 1/3 of a quadrant. All these will be moved to P5 when time comes

What we have at CERN - PSU  CAEN SY4527 mainframe – next generation after SY2527  A1538 for cathode+A1511B for last two dinodes  For final installation there will be different A1538D module used, which is a modification of A1538 and provides 10ma per channel LS1 session, December CMS week4 A1538D A1511B SY4527

At P5 LS1 session, December CMS week5 Work is based on units of Quadrants (1/4 or 90degrees of one HF). Size of smallest HV “partition” (commissioning unit) Smallest unit that can be cabled independently

ROBOX Rework -Basic concept LS1 session, December CMS week6  Work is pipelined  ~4 Weeks/HF quadrant, +3 Days contingency at end of each quadrant  ROBOX work is ~3/4 the effort of the assembly team Disassemble boxes Rebuild boxes 1-3 Remove boxes from quadrant (9 boxes) Reinstall quadrant (9 boxes) Rebuild boxes 4-6 Testing contingency Rebuild boxes 7-9 Test boxes 1-3 Test boxes 7-9 Test boxes 1-3 Disassemble boxes Test boxes 4-6 Testing contingency Rebuild boxes 1-3 Assembly team Testing team Installation team 1 week Remove Qn+1 Slide from Ianos Schmidt

Cabling work -basic concept LS1 session, December CMS week7  Cabling work ~1/4 the effort of the assembly team.  Cabling work in shadow of ROBOX testing, but,  Cables should be tested and bundled by the time ROBOXes are ready for installation.  Prefer to have cables installed after ROBOX installation. Rebuild boxes 1-3 Rebuild boxes 4-6 Testing contingency Test boxes 7-9 Test boxes 1-3 Disassemble boxes Test boxes 4-6 Testing contingency Rebuild boxes 1-3 Assembly team Testing team Installation team Remove Qn+1 Install Cables Reinstall quadrant (9 boxes) Rebuild boxes 7-9 Remove Cables Cable Prep and testing Install Cables Reinstall quadrant (9 boxes) Remove Cables Commissioning Cable Prep and testing Slide from Ianos Schmidt Test boxes 1-3

LS1 session, December CMS week8 A LS1 Startup scenario Learning curve:  Installation team 100% on ROBOX work. No overlap with cable prep.  Takes longer to cable first quadrant - Impact is on start of commissioning (Catches up about half way through). Disass emble 1-3 Install 4-6 Cont Disass emble 4-6 Delay from late cable PO -Assuming Order placed Nov 30,2012, expect cable available ~April 11, expect delay to be ~2 Weeks Remove boxes from Q1 HF in garage Feb 26 First cables at CERN DELAY Start of LS1 (Feb.11, 2013) Cable prep. Cable Install Commissioning On detector work: Modify metallic structures, Consolidate services, install cable support… Assembly team Testing team Installation team Central services (cooling, power) Available end of April Local DAQ available ~20 May Slide from Ianos Schmidt

Summary LS1 session, December CMS week9  All PMT’s and more than a half out 216 BB’s are at CERN B904 lab. Rest is expected to be at CERN by end of February  All BB’s are populated with PMT’s, around 80 BB’s are tested, others waiting their turn.  Testing speed is 12 BB’s per week. Expect to end 904 test by late March. Then setup moves to P5 alcove. By then first set of ROBOXes already could be removed and lifted up to surface  HF work is organized around units of “quadrants”, which represent ¼ of one HF.  There are three teams working in parallel:  Assembly team, responsible for ROBOX rebuilding, and cable preparation  Testing team, responsible for ROBOX testing and test data analysis  Installation team, responsible for ROBOX and cable installation, as well as cable/service consolidation, and rack/cable support modifications..  Each team spends ~4 weeks on a quadrant.  Work is pipelined, so one quadrant takes ~6-7 weeks to complete.  Expect first HF to be complete ~Mid August 2013  Expect second HF to be complete ~End December 2013