Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.

Slides:



Advertisements
Similar presentations
Electrical wiring for piezo movers piezo power supply strain gauges readout temperature probes 1 Frédéric BOGARD – LAL/IN2P3/CNRS – Jan 25, 2013 Electrical.
Advertisements

Jixie Zhang Javier Gomez Oleksandr Glamazdin Roman Pomatsalyuk Vadym Vereshchaka Hall A Collabortion Meeting, Dec 2012 Hall A Moller Polarimeter 12 GeV.
Silvia Zorzetti. PACMAN CLICScientific ProjectThe Team PACMAN (Particle Accelerator Components Metrology and Alignment to the Nanometer Scale) Ph.D. training.
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Robert Ruland Installation Alignment -Magnetic Measurements – Fiducialization April 7-8, 2005 FAC Meeting 1 Installation Alignment,
Bob Lill LCLS FAC June 16-18, 2008 RF BPM Status and Production Test Results.
CLIC-PACMAN: BPM-to-Quadrupole Alignment based on EM Field Measurements Manfred Wendt CERN BE-BI-QP.
Cryomodule requirements Hitoshi Hayano, KEK for CFS consideration Asian Single Tunnel Design June 1-2,2010.
PACMAN Workshop OUTLINE Introduction ESR 3.1 Challenges - Stability budget and Precision Mechanical Design - Precision Assembly of MBQ and BPM - System.
R. Corsini, CLIC Project Meeting - 24 th May 2013 CTF3 1 CTF3: Highlights of the 1 st run R. Corsini for the CTF3 Team 1.
CIEMAT CONTRIBUTION TO TBL PETS (January 2009) David Carrillo on behalf of the Accelerators Team.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
Tesla Meeting Frascati 27/05/03 C. Magne Cold BPM for TTF2 Tesla prototype - low beam impedance - cooling to 2K without strain - Low beam coupling impedance:
Bob Lill Undulator Systems – BPM January 31, 2006 Undulator Cavity BPM Design and Status.
Internal Cryomodule Instrumentation ERL Main Linac Cryomodule 10/10/2015 Peter Quigley, MLC Design Review.
Franz Peters, Georg Gassner WPM/HLS Status and June 17 th, WPM & HLS Status and Schedule Franz Peters, Georg Gassner.
SCU Segmented Cryostat Concept M. Leitner, S. Prestemon, D. Arbelaez, S. Myers September 2 nd, 2014.
Status of the Fermilab Cold BPM R&D Manfred Wendt Fermilab 10/1/20091LCWA09 Main Linac WG.
STATUS of the final PACMAN bench integration PACMAN meeting 11/06/2015 Hélène Mainaud Durand.
1 C. Simon CLIC Instrumentation workshop BPM C. Simon on behalf of the Saclay’s group CLIC Instrumentation workshop 2 nd - 3 rd June.
Tohoku university Daisuke Okamoto TILC09 1. Motivation 2. Principle 3. Design 4. Expected performance 5. Conclusion contents.
Midterm Review 28-29/05/2015 Silvia ZORZETTI ESR4.1, WP4 1.
The new set of MWPCs for CB Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni.
The beam-based alignment and feedback systems, essential operations of the future colliders, use high resolution Beam Position Monitors (BPM). In the framework.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser 1 Frank Ludwig, DESY XFEL-LLRF-ATCA Meeting, 3-4 December 2007 Downconverter Cavity Field.
Measurements of the X-ray/pump laser pulse timing Valery Dolgashev, David Fritz, Yiping Feng, Gordon Bowden SLAC 48th ICFA Advanced Beam Dynamics Workshop.
Beam Test status and Plans of the ILC Main LINAC BPM
Definition of Work Area H. Hayano, KEK EDR-KOM-cavity at DESY Issues of Cavity and Cavity Package, Work Package discussion.
1 Cold L-Band Cavity BPM: Design Status July 2006 Gennady Romanov Linda Valerio Manfred Wendt Fermilab July 21, 2006.
Magnetic Field Stability Measurements Joe DiMarco 23Oct07.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
A New Stripline BPM Design for the ILC IR Fast Feedback (?!) – For discussion: A metal/ceramic brazed BPM pickup – 9/19/2007ILC IR Engineering Design Workshop,
PACMAN Error Inventory OUTLINE The PACMAN task The Inventory of contributors The Evaluation Method Critical Areas Outcome 08/10/2015 by Iordan Doytchinov.
MLI Summary Chris Adolphsen SLAC. Summary of MLI Talks Quadrupoles (V. Kashikhin) –Expect test of a SLAC/CIEMAT and FNAL cos(2phi), ~ 60 T/m, SC Quads.
Cold BPM development in KEK H. Hayano, March 2011 Jung Keun Ahn (PNU), Sun young Ryu (PNU), Eun San Kim (KNU), Young Im Kim (KNU), Jin yeong Ryu (KNU),
ILC Main Linac Superconducting Quadrupole V. Kashikhin for Superconducting Magnet Team.
Booster bpm’s Jim Crisp 3/29/06. Plate width and linearity with the response linearized along the axis 60 and 20 degree plates become nonlinear in the.
Date 2007/Sept./12-14 EDR kick-off-meeting Global Design Effort 1 Cryomodule Interface definition N. Ohuchi.
Magnet design issues and discussion David Harding for Vladimir Kashikhin 3 April 2005.
PACMAN : technical objectives Hélène Mainaud Durand.
MLI Update Chris Adolphsen SLAC. CAVITY VESSEL T4CM QUAD T4CM BPM QUADS LEADS 80K BLOCK 4K BLOCK Quadrupole Package.
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
Midterm Review 28-29/05/2015 Progress on wire-based accelerating structure alignment Natalia Galindo Munoz RF-structure development meeting 13/04/2016.
1CEA/ Saclay/ SACM CARE/SRF/WP11 Development of a new Beam Position Monitor for FLASH, XFEL and ILC Cryomodules Claire Simon, Michel Luong, Stéphane Chel,
Clive Field, Venkat Srinivasan Undulator Week: BFW Card Status Update 04/30/ BFW Card Status on behalf of: Keith Caban.
ELENA installation progress F. Butin / ELENA collaboration.
Bunch Shape Monitor for HINS Wai-Ming Tam Project X Collaboration Meeting September 11, 2009.
ALIGNMENT OF THE NEW TRIPLETS
PACMAN impact on future module design
Re-entrant BPM R&D for ILC Main Linac
CAVITY BPM FOR CALIFES Claire Simon, Michel Luong, D. Bogard, P
TEST MODULE WG Cradles for CLIC module supporting system
CLEX* Status and Plans CTF3 complex CLEX
SC Quadrupole Magnets in ILC Cryomodules
Ddd 4-Slides Challenge Silvia Zorzetti.
WP1 Metrology & Alignment
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
    BEAM POSITION MONITORS USING A RE-ENTRANT CAVITY C. Simon1, S. Chel1, M. Luong1, P. Contrepois1, P. Girardot1, N. Baboi2 and N. Rouvière3.
SCU Next Phase Meeting July 8, 2014.
RF modes for plasma processing
Fabrication of KEK-ATF2 Q-BPM
Linac/BC1 Commissioning P
Undulator System Components Status Dean Walters
Overview Beam Position Monitoring Wire Scanners / Cherenkov Detectors
ESS MEBT Quadrupole magnets
Breakout Session SC3 – Undulator
Hall probe Location on top or bottom
SNS PPU Cryomodule Instrumentation
Presentation transcript:

Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti

2 2 Hexapod BPM PXI crate Fermilab Downconverter The wire is stretched through the RF-BPM cavity and used as a probe to detect the electric field distribution. BPM Test Bench

3 Downconverter BPM PXI Downconverter controller And power supply Targets for fiduacialization Hexapod adapter for characterization BPM Test Bench Interfaces for other measurements Inside the CMM Outside the CMM Not needed for CMM

4 Sample BPM characterization on the Hexapod and the CMM - Inclusive of the environmental characterization of the test bench – with Peter and Iordan Study accomplished by February 2016 Nanometric study of the BPM – with David Timing to be defined PACMAN BPM characterization with the new interface for the integration March 2016 Fiducialization in ISR8 <5um with Vasileios March 2016 Fiducialization in the CMM <1um Macrh-April 2016 Integration with the quadrupole May 2016 BPM- Quad offset measurements June 2016 BPM Characterization Strategy

5 BPM Nanometric studies 1 DOF piezo stage to prove nanometric resolution of the BPM on the vertical axis PIEZO STAGE TO BE ADDED ON TOP OF THE HEXAPOD -Mechanical interface

BPM Drawings CLIBPMMB0015 6

Monopole cavity and connectors (x2) Dipole cavity and connectors (x4) Flanges To be adapted for the integration Beam pipe Inner diameter =8mm 7

8 BPM Drawings CLIBPMMA0005 Fiducials

9 BPM Drawings CLIBPMMA0032 BPM support

BPM Measurements Monopole Cavity -50Ω termination Dipole Cavity -SMA Adaptors -SMA connectors -SMA Connectors -SMA adaptors -50Ω termination -RF cables 10

Outside the CMMInside the CMM BPM Electronics BPM 15 GHz Signal Generator Ocilloscope Switches … ~200MHz, 75MHz Fermilab PLLs and downconverter 11 Needs to be added in the drawings 20x20x10 cm <2kg 4x SMA cables 6x SMA cables going in the room next to the CMM Cables can be: Rigid Flexible Semirigid