RMR Exit Strategies Update TAC November 6, 2003. RMR UNITS.

Slides:



Advertisements
Similar presentations
SWE IG Meeting Paris, CRE XBID Overview Supported by.
Advertisements

KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
THE POWER OF POSSIBILITY Electric Transmission System Development in Alberta Neil J. Brausen, P. Eng., Director System Planning APEGGA Calgary Branch Luncheon.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
ERCOT Load Forecast and Reserve Margin Update June 2, ERCOT Load Forecast and Reserve Margin Update June 2, 2005.
1 Demand Response Update April, Strategic Perspective Demand Response  Aligns with PGE’s Strategic Direction; helping to provide exceptional.
George Bartlett Director, Transmission Operations Economic Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
PacifiCorp Participation in the California ISO. 2 Full participation provides significant benefits beyond those of the Energy Imbalance Market EIM BenefitsFull.
1 Non-Transmission Alternatives to Reduce Local Congestion Costs Bill Bojorquez June 3, 2004.
Charles Hosken, General Manager Imperial Irrigation District
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
DC Tie Reservation and Scheduling with Mexico Shams Siddiqi representing Sharyland Utilities WMS Meeting May 15, 2007.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Office of Electricity Transmission and Distribution September 2003 Marshall Reed U.S. Department of Energy.
1 WMS Report To TAC September In Brief Four Working Group Reports Four Working Group Reports One Task Force Report One Task Force Report Three.
LAREDO PLANT RMR EXIT STRATEGY Presentation to Board of Directors March 16, 2004 Transmission Services Operations.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
Page 1© 2009 Quanta Technology LLCPage 1 November 2007 BGE January 4, 2008 Strategic Midwest Area Renewable Transmission (SMART) Study October 06, 2009.
RMS Update to TAC January 8, Voting Items From RMS meeting on 12/10/2008  RMGRR069: Texas SET Retail Market Guide Clean-up – Section 7: Historical.
ERCOT PROGRESS REPORT Board of Directors Austin, Texas October 15, 2002.
PMO Update to PRS Troy Anderson Program Management Office November 17, 2005.
Discussion of Reliability Must-Run (RMR) Protocol Provisions ERCOT Technical Advisory Committee November 6, 2002.
November 12, 2010 Regional Planning Group Long-Term System Assessment Project Update Warren Lasher Manager, Long-Term Planning and Policy Jonathan Rose.
LAREDO RMR EXIT STRATEGY Presentation to Technical Advisory Committee March 4, 2004 Transmission Services Operations.
1 TAC Report to the ERCOT Board February 21, 2006.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 12, 2006.
SPP.org 1. Status Update for Reliability and Economic Assessments Stakeholder Meeting September 16, 2008 Austin, TX.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
TRANSMISSION CONSTRAINTS KENNETH A. DONOHOO, P.E. Manager of System Planning, Technical Operations
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Future Expectations of TEPPC: Products, Users, and Values Maury Galbraith Presentation to TEPPC Review Task Force January 11,
RMSUpdate May 5, 2005 Retail Market Subcommittee Update to TAC.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
Imperial Valley Study Group Transmission Planning Collaborative 2005 California Geothermal Summit June 9, 2005 California Geothermal Energy Collaborative.
ERCOT – MISO DC Tie Study Comments
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
Capacity, Demand and Reserves Report Bill Bojorquez May 4, 2007.
Capacity, Demand and Reserves Report Bill Bojorquez Board of Directors Meeting May 16, 2007.
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
California Energy Action Plan December 7, 2004 Energy Report: 2004 and 2005 Overview December 7, 2004.
Reliability Deployments Task Force Update WMS Meeting WMS Chair created task force with the directive that the task force will address real-time.
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
Imperial Irrigation District 2016 Integrated Resource Plan: Imperial Irrigation District April 18th, 2016.
Impact of not including proposed generators lacking RARF data in the planning models Planning Guide Section 6.9 Issues February 17, 2016.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
RMS Update to TAC June 7, RMS Activity Summary RMGRR052 File Naming Convention for Customer Billing Contact Information URGENT (Vote) RMS Procedures:
Proposed Market Solution for Bates RMR Exit Strategy Frontera Power Station.
Environmental Compliance Workshop February 4, 2016 MISO’s analysis of the Clean Power Plan Marc Keyser Program Manager Program Strategy/Clean Power Plan.
Flynn & Associates1 SF LAFCO Energy Consultant(s) RFQ Overview of Critical Issues and Flynn & Associates’ Expertise April 19, 2002.
Reliability Must Run Workshop Introduction May 24, 2016.
CSC DETERMINATION PROCESS
Transmission Planning in ERCOT- Overview
Retail Market Subcommittee Update to TAC
Entergy Integration Study Update
ERCOT – Southern Cross Transmission ROS/WMS Working Group Assignments
Reliability Assessment Committee Proposal TSS Meeting
Affordable Energy Production from Renewable Fuel
Transmission: the Critical Link
Overview of Northwest Wind Integration Action Plan
The Need for Compensatory Standby Rates
Transmission As Enabler
Excelsior Energy’s Mesaba Energy Project
Current New Hampshire Cost-Effectiveness Test
Presentation transcript:

RMR Exit Strategies Update TAC November 6, 2003

RMR UNITS

Exit Timelines UnitCapacityEst. Exit Timeline Rio Pecos98 MWNovember, 2003 San Angelo102 MWSummer 2004 Fort Phantom202 MWDec La Palma249 MWDec B.M. Davis335 MWDec Bates183 MWN/A Laredo172 MWN/A TOTAL1,341 MW

Next Steps  Exit strategy for B.M. Davis will be presented to TAC and Board in December  Bates and Laredo remain: Long Term solutions presented by AEP require extensive 345kV upgrades – will require thorough evaluation Phase I or ERCOT-CFE study provide short term alternatives TECO and ERCOT are discussing an alternative that would use Frontera as a short-term alternative to Bates ERCOT continues to receive and validate key input data required for full economic analysis

CFE / ERCOT Interconnection Study Findings

Contents  Study History and Systems Overview  Phase I and II Studies Scope  Phase I Assumptions and Findings  Interconnection Applications and Market Overview  Enabling Protocols and Agreements  Conclusions and Next Steps

Mexico and United States Border Region CFE/ERCOT

Border Systems Overview

System Overview

Conclusions  Mutual support benefits to end use customers are recognized in the near term: Block Load Transfers at Acuña, Asynchronous ties at Laredo and McAllen  Asynchronous ties afford significant flexibility and reliability to CFE and ERCOT  New interconnections have the potential for providing services beyond reliability, Facilitate competition and trade Enhance economic efficiencies

Conclusions (cont.)  Larger ties will have broad policy and economic impacts Phase II studies will identify larger ties Cost vs. impact to the energy markets  Phase II involvement of DOE/PUCT and SENER/CRE is recommended

Next Steps  ERCOT to complete economic evaluations of alternatives to RMR services,  CFE and ERCOT to develop system support services agreement,  Ensure ERCOT protocols support and facilitate transactions over CFE/ERCOT ties,  Transmission Service Providers to complete transmission upgrades to support and build the CFE/ERCOT interconnections,  Proceed with the applicable presidential permits for the CFE/ERCOT interconnections

Questions?