THEMIS ESA SWG ESA- 1 UNH, Sept 22, 2008 ESA STATUS J. McFadden UC Berkeley SSL.

Slides:



Advertisements
Similar presentations
MPSRESA- 1 UCB, Oct 26, 2006 THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley.
Advertisements

PSSC Space Instrument Laboratory Plasma instrument calibration system provides an ion beam of energy range up to 130keV/charge in a clean room To develop.
Observation of Auroral-like Peaked Electron Distributions at Mars D.A. Brain, J.S. Halekas, M.O. Fillingim, R.J. Lillis, L.M. Peticolas, R.P. Lin, J.G.
Expected Influence of Crustal Magnetic Fields on ASPERA-3 ELS Observations: Insight from MGS D.A. Brain, J.G. Luhmann, D.L. Mitchell, R.P. Lin UC Berkeley.
NASA/NSTA Web Seminar: Living and Working in Space: Energy LIVE INTERACTIVE YOUR DESKTOP.
1 K. Stasiewicz, Plasma Space Science Center, NCKU Swedish Institute of Space Physics, Uppsala Multi-spacecraft studies of nonlinear waves.
CASCADES-2: A View from THEMIS John Bonnell Space Sciences Laboratory UC Berkeley What can THEMIS provide? Multi-point magnetospheric observations of particles.
ESS 265Electric Fields 1 Electric Field Measurements Types of electric field measurements Double Probe Measurements –Theory –Measurements in the ionosphere.
IES Calibration Modeling Phil Valek and Roman Gomez May 29, 2013.
THEMIS MISSION PDRESA- 1 UCB, November, 2003 ESA Plasma Instrument Mission PDR Dr. C. W. Carlson and Themis ESA Team UC Berkeley SSL.
Shape and dynamics of the terrestrial magnetopause: CLUSTER and THEMIS multi-spacecraft observations Oleksiy Agapitov 1,2, Evgeny Panov 3,4 and Uli Auster.
THEMIS End of Prime Mission ReviewESA- 1 UCB, November, ESA Plasma Instrument End of Prime Mission Review Dr. James McFadden and Dr. Charles Carlson.
ARTEMIS’s Planetary Goals 1 June 13, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS ARTEMIS Lunar Exploration.
A T Y Lui, D. G. Sibeck, T. Phan, V. Angelopoulos, K.-H. Glassmeier, J. McFadden, C. Carlson, D. Larson, J. Bonnell, + … Outline  Previous: Reconstruction.
RBSP SWG Meeting 1 3/5/2009 BARREL Update (Balloon Array for RBSP Relativistic Electron Losses) R. M. Millan and the BARREL Team.
THEMIS MISSION CDRESA- 1 UCB, June THEMIS T IME H ISTORY OF E VENTS AND M ACROSCALE I NTERACTIONS DURING S UBSTORMS RESOLVING THE MYSTERY.
3D Current Topology in the Vicinity of an Evening Arc O. Marghitu (1,3), G. Haerendel (2), B.Klecker (3), and J.P. McFadden (4) (1)Institute for Space.
CODIF Status Lynn Kistler, Chris Mouikis Space Science Center UNH July 6-8, 2005 Paris, France.
A statistical study of the Field-Aligned Electron Events (status report) Solène Lejosne, Forrest Mozer and Oleksiy Agapitov SSL, University of California,
Large electric fields near the nightside plasmapause observed by the Polar spacecraft K.-H. Kim 1, F. Mozer 2, and D.-H. Lee 1 1 Department of Astronomy.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
Presented by A.B. Galvin STEREO SWG NOAA Boulder, Co 22 March 2004 PLASTIC Activities.
GEM 2008 Summer Workshop, Zermatt, Utah, June 25, Institute of Geophysics and Planetary Physics University of California, Los Angeles THEMIS observations.
THEMIS Workshop 1 UC Berkeley, 18 December 2004 Data Products and Access Tim Quinn UC Berkeley.
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
1 THEMIS Inner Magnetosphere Review, Dec 20, 2008 Summary of THEMIS results in the inner magnetosphere Future mission operations discussion: –Science targets.
ARTEMIS from a Planetary Perspective 1 September 9, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS Vassilis Angelopoulos, and the ARTEMIS team.
THEMIS ESA SWT ESA- 1 UCB, Aug ESA In-Flight Calibration and First Results J. McFadden, C. Carlson, D. Larson UC Berkeley SSL.
Simple Approach to Salvaging THEMIS ESA Moments Prior to Boom Deployment Vladimir Kondratovich David G. Sibeck.
1 SWEA pre-CDR Peer Review Particles and Fields Package (PFP) SWEA pre-CDR Peer Review Integration and Test 2011 March 29 Dave Mitchell.
Lander Experiment ROMAP
7 3-4 Sept EFW INST+SOC PDR EFW Science Overview Professor John R. Wygant (PI) University of Minnesota.
SSL-SWT 1 Aug 6-8, 2007 Introduction Mission elements Mission Status First light: Tail’s welcome Dayside Events THEMIS MISSION Overview Status And First.
How ARTEMIS Contributes to Key NLSI Objectives C.T. Russell, J. Halekas, V. Angelopoulos, et al. NLSI Lunar Science Conference Ames Research Center Monday,
ARTEMIS Independent Integrated Review 1 NASA/GSFC – Feb. 24, 2009 THEMIS ARTEMIS ARTEMIS Science Vassilis Angelopoulos ESS/IGPP UCLA and SSL/UCB.
ESS 265Low Energy Particle Instruments 1 Particle Measurements Types of particle measurements –Langmuir Probes –Retarding potential analyzers –Magnetic.
Nonlinear electric field structures in the inner magnetosphere D. M. Malaspina 1, L. Andersson 1, R. E. Ergun 1, J. R. Wygant 2, J. W. Bonnell 3, C. Kletzing.
ESS 265Low Energy Particle Instruments 1 Retarding Potential Analyzers In the ionosphere, mount along ram velocity, measure species densities –Ram speed.
Joint Cluster-THEMIS SWT 1 Sep 23-26, 2008 Vassilis Angelopoulos, James P. McFadden, Davin Larson, Charles W. Carlson, Stephen B. Mende, Harald Frey, Tai.
HQ Lunch Science Seminar Series 1 NASA/HQ, 1/28/2008 Introduction, THEMIS overview First THEMIS results from the tail First THEMIS results in the dayside.
Lessons Learned Project Overview 1 Jan 29, 2008 THEMIS Introduction Jan 29, 2008.
THEMIS ESA SWG ESA- 1 UCB, Dec 20, 2008 ESA STATUS J. McFadden UC Berkeley SSL.
Joint Cluster-THEMIS SWT 1 Sep 23-26, 2008 Vassilis Angelopoulos, James P. McFadden, Davin Larson, Charles W. Carlson, Stephen B. Mende, Harald Frey, Tai.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
IMPACT SWEA electron measurements and the temporal evolution of the solar wind Andrea Opitz CESR, Toulouse, France for the SWEA team and its supporters.
THEMIS Mission PDR/CAR 1 UCB, November 12-14, 2003 THEMIS Confirmation Assessment Project Overview Peter R. Harvey University of California - Berkeley.
THM+ART Senior Review 1 Apr 8, 2008 THEMIS Extended Phase = THEMIS baseline + ARTEMIS THEMIS Senior Review.
ARTEMIS Financial Feasibility Review 1 NASA/HQ – Mar. XX, 2009 THEMIS ARTEMIS THEMIS-ARTEMIS (THEMIS Extended Phase) Financial Feasibility Review Science.
1. What controls the occurrence of reconnection. 2
Science. Planner. 4/11/17 WALT: understand properties of Atoms. WU:
Mission Critical Design Review (MCDR) June 14-18, 2004
The Magnetospheric Source Location of the Proton Aurora
Time Series Analysis of Particles and Fields data
Project Overview and Status
THEMIS and ARTEMIS Status
THEMIS multi-spacecraft observations of a 3D magnetic
March 5th, 2008 substorm event ( UT) Waves observations
THEMIS observations at a substorm onset on March 1, 2008
خطوات البحث العلمي.
First 10 months Angelopoulos, 2008 Space Sci. Rev. In Press
Analysis of Substorms during the Second THEMIS Tail Season
THEMIS First Results and near future
THEMIS baseline + ARTEMIS
1IGPP/UCLA, 2SSL/UCB, 3LASP, 4Univ. Calgary, 5TUB, 6UNH
Jan. 29, 2008 substorm event ( UT) Waves/particles
Picture 1 10 protons 10 neutrons = an electron.
Response to Comment on “Tail Reconnection Triggering Substorm Onset”
Fig. 3 Electron PSD in various regions.
THEMIS Introduction Nov 6, 2007.
Presentation transcript:

THEMIS ESA SWG ESA- 1 UNH, Sept 22, 2008 ESA STATUS J. McFadden UC Berkeley SSL

THEMIS ESA SWG ESA- 2 UNH, Sept 22, 2008 ESA Instrument Papers Both ESA instrument paper are “in press” If you are using ESA data, review these papers for all the caveats regarding ESA data. THEMIS ESA first science results and performance issues, McFadden, J.P., Carlson, C.W., Larson, D., Bonnell, J., Mozer, F., Angelopoulos, V., Glassmeier, K.-H., Auster, U. Space Sci. Rev., The THEMIS ESA plasma instrument and in-flight calibration McFadden, J.P., Carlson, C.W., Larson, D., Angelopoulos, V., Ludlam, M., Abiad, R., Elliott, B., Turin, P., Marckwordt, M. Space Sci. Rev., 2008

THEMIS ESA SWG ESA- 3 UNH, Sept 22, 2008 iESA Relative Calibration TH-D [ , , , , , , , ] [ , , , , , , , ] After MCP change on ' /18:24' TH-E [ , , , , , , , ] [ , , , , , , , ] After MCP change on ' /22:32'

THEMIS ESA SWG ESA- 4 UNH, Sept 22, 2008 eESA Relative Calibration TH-D [ , , , , , , , ] [ , , , , , , , ] After MCP change on ' /18:24' TH-E [ , , , , , , , ] [ , , , , , , , ] After MCP change on ' /22:32'

THEMIS ESA SWG ESA- 5 UNH, Sept 22, 2008 Electron ESA

THEMIS ESA SWG ESA- 6 UNH, Sept 22, 2008 Electron ESA

THEMIS ESA SWG ESA- 7 UNH, Sept 22, 2008 Electron ESA

THEMIS ESA SWG ESA- 8 UNH, Sept 22, 2008 Frozen In

THEMIS ESA SWG ESA- 9 UNH, Sept 22, 2008 Frozen In

THEMIS ESA SWG ESA- 10 UNH, Sept 22, 2008 Breaking Frozen In

THEMIS ESA SWG ESA- 11 UNH, Sept 22, 2008 Breaking Frozen In

THEMIS ESA SWG ESA- 12 UNH, Sept 22, 2008 Breaking Frozen In

THEMIS ESA SWG ESA- 13 UNH, Sept 22, 2008 Measuring Currents

THEMIS ESA SWG ESA- 14 UNH, Sept 22, 2008 Measuring Currents

THEMIS ESA SWG ESA- 15 UNH, Sept 22, 2008 Measuring Currents

THEMIS ESA SWG ESA- 16 UNH, Sept 22, 2008 Measuring Currents dB = u0 * J * dx dB = 4pi*100nT *m/A * J * dx dB = 10 nT J = ne(Vi-Ve) J =.1/cc * 1.6e-19 * 800 km/s = 1.3e-8 A/m2 dx ~ 620 km gyroradius of 30 keV proton in 28nT field = 880 km Total potential drop 620 km x 10mV/m ~ 6 kV